IMAGES

  1. Lakanal House

    lakanal house case study

  2. Lakanal House

    lakanal house case study

  3. Revisiting the lessons of the tower block tragedy

    lakanal house case study

  4. The Lakanal House inquest and Local Authority tower blocks

    lakanal house case study

  5. Inside Housing

    lakanal house case study

  6. Inside Housing

    lakanal house case study

VIDEO

  1. Dr House Case study

  2. 10 minutes pour tout savoir sur l'hypokhâgne de Lakanal !

  3. Villa Lako: a living box inside the snowy jungle in #Russia designed by Shomali Design Studio

  4. The Incredible Story of The Stahl House

  5. Jonathan Budner

  6. OTW Collection

COMMENTS

  1. Lakanal House

    Lakanal House was constructed in 1950 and was considered a state of the art building. It was predominantly council rented with a dozen leasehold out of 98 flats in the building. The building was 16 storeys high with 14 accommodation storeys. 1st floor through to the 14th were accommodation. There was a undercroft at ground level, plant lift ...

  2. Lessons from Lakanal House were not heeded

    Sickening errors. At the end of the Lakanal inquest in 2013, Mbet Udoaka and Raphael Cervi, who lost their wives and children in the blaze, faced the press and said they hoped other families would ...

  3. Lakanal House: new evidence reveals how fatal fire spread

    More from: Lakanal House: new evidence reveals how fatal fire spread. The fire begins at 4.10pm on Friday 3 July inside a flat on the ninth floor. There are no communal fire alarms or sprinkler system in the building, which was built in 1959. The fire brigade is called at 4.19pm, assistant commissioner Nick Collins said firefighters were at the ...

  4. Lakanal House fire: A tragedy waiting to happen?

    The fire had broken out at 16:15 BST in flat 65. Resident Jade Spence alerted the fire brigade before leaving the building. The location of the fire at Lakanal House was visible from the outside ...

  5. Lakanal House fire

    The Lakanal House fire occurred in a tower block on 3 July 2009 in Camberwell, London. Six people were killed, and at least twenty injured, ... As in the case of the Grenfell Tower fire eight years later, residents were advised to remain in their homes in the event of a fire. The inquest concluded that substandard renovations had removed fire ...

  6. Special investigation

    When Lakanal House was built in the 1950s, building standards were stricter: the walls of buildings had to provide one hour's fire resistance and combustible materials were effectively banned. But when the building was refurbished under the Decent Homes Programme in 2007, the applicable standard was the lower Class 0.

  7. Lakanal House: 'Missed opportunities to make tower safe'

    Narrative verdicts into the victims' deaths at Lakanal House in Camberwell in July 2009 were returned. ... She had previously asked about how to escape in the case of a fire. Smoke and flames also ...

  8. PDF Grenfell Tower fire

    Grenfell Tower fire

  9. PDF Lakanal House Case Study Training Package

    Lakanal House Case Study Training Package - explanatory narrative notes 13t" February 2019 ¯ Display case st udy slide Opening Narration: ... The case study is supported with a separate 'Training Guide' which is followed by the Officer delivering the training session, The case study training package was launched in April 2014 ...

  10. PDF Report to the Secretary of State by the Chief Fire and Rescue Adviser

    1.1 The fire at 16.19 hrs on 3 July 2009 at Lakanal House, Sceaux Estate, Camberwell, London was by any measure a tragic event. The fire resulted in the loss of six lives; 15 residents and a firefighter were injured and London Fire Brigade were required to assist a further 40 residents to safety. Along with loss of life and injuries, over 90

  11. PDF Lakanal House Case Study Timeline Handout

    Lakanal House Case Study babcock Timeline Handout trusted to deliver This is a timeline of some key events. It is intended as supporting material to the presentation and to offer a guide to how the incident progressed. Unknown exact times (soft times) are indicated by BAB00000065 0001

  12. Lakanal House fire: A tragedy waiting to happen?

    Lakanal House fire: A tragedy waiting to happen? Close. After months of evidence, questions are raised whether a fire in a south London tower block which claimed six lives was a tragedy waiting to ...

  13. After the fire: Seven years on from Lakanal House and what have we

    And it could easily hit other London councils too. It is seven years since the fatal fire at Lakanal House in Camberwell, south London, which claimed the lives of three young women and three children. The first legal case arising from the tragedy was concluded at the start of March this year. Southwark Council pleaded guilty to four offences ...

  14. Lakanal House fire, London

    Six people were killed and at least 20 injured, including a firefighter, at Lakanal House after a blaze, caused by a faulty TV on the ninth floor, spread through the 14-storey building. The London Fire Brigade sent 18 fire engines to the incident, and firefighters rescued a number of residents trapped in their flats.

  15. Investigation of Lakanal House Fire

    During the Universities' Research Excellence Framework exercise in 2014, I was invited to consider my own journalistic output on the Lakanal House as an impact case-study. I thought it might be possible to illustrate from this body of work how it remains possible to use investigative techniques to maintain audience interest in a story of ...

  16. Government 'shut down' investigation into Lakanal House fire less than

    The Lakanal House fire killed six people, including three children, when it spread across several floors of the south London tower block on 3 July 2009. The BRE, which was contracted by the government to investigate the impact of real-world fires, delivered a preliminary report to government on 16 July.

  17. Investigation of Lakanal House Fire

    A narrative of the fire at Lakanal House - 3rd July 2009. Spanning 4 years (2009 - 2013) from the immediate aftermath through to the inquest and verdict. In the wake of the recent fire at Grenfell Tower, the information found here might provide an insight...

  18. Lakanal House fatal fire: the price of failure

    The inquest into the fatal fire at Lakanal House says a failure to involve building control and adhere to fire guidelines during refurbishment work was a contributory factor. Elaine Knutt reports. At the 12-week Lakanal House inquest, the emails, minutes and memoranda of the Decent Homes refurbishment that upgraded the south London 1960 block ...

  19. High Rise Fire-fighting: Lakanal House 2009

    Events. At 16:20 on 3 July 2009, a fire broke out in one of the flats of Lakanal House. London Fire Brigade responded with a total of eighteen fire engines attending the incident. The seat of the fire is thought to have been in a flat on the ninth floor. London Fire Brigade rescued a number of people from the flats.

  20. Lakanal House Coroner Inquest

    The inquest into the Lakanal House fire in the London borough of Southwark on 3 July 2009 began on 14 January and ended on March 28 2013. Verdicts and Coroner's recommendations. Verdicts into the deaths of six people and the Coroner's recommendations. Inquisition and narrative verdict - Catherine Hickman;

  21. Lakanal House Verdict: Deaths Were Avoidable

    Lakanal House Verdict: Deaths Were Avoidable. The jury in the inquest into the 2009 Lakanal House high-rise flats fire returned their damning narrative verdicts on the deaths of six people last week. The Southwark Council, the London Fire Brigade, and 999 Operators were all heavily criticised for the events that led to the deaths of Catherine ...

  22. PDF Lakanal House

    In the case of the Lakanal fire there was early detection by the occupant of flat 65 and the intervention was by that occupant making a 999 call to the London Fire Brigade (LFB) (16:18, (D+0)). ... The PDA as listed for Lakanal House was suitable for an initial response to a property fire in this type of building. There are instructions to make ...

  23. HHS Announces Cost Savings for 64 Prescription Drugs Thanks to the

    White House Domestic Policy Advisor Neera Tanden will announce the cost savings on these life-saving drugs in a keynote address on the Biden-Harris Administration's focus on lowering costs today at the Center for American Progress. "Without the Inflation Reduction Act, seniors were completely exposed to Big Pharma's price hikes. Not anymore.

  24. PDF GEORGE, TOM (Director of Operations)

    The Lakanal House Case Study is a CBT package which was delivered to you and other senior officers by Tim Cutbill, I here in 169 Union Street. I have copied the Background/Context for the creation of the training as set out in the TCAP. I have also asked Babcock