What is a Responsibility Assignment Matrix And How to Create One
Projects often falter not from lack of talent or resources, but from unclear responsibilities and misaligned expectations. When deadlines loom and stakeholders grow anxious, the difference between success and failure often comes down to one fundamental question: Does everyone know exactly what they’re supposed to do?
The Responsibility Assignment Matrix (RAM) addresses this critical need for clarity in project execution. It transforms vague roles and loose accountability into clear, actionable responsibilities. By establishing who owns what, who decides what, and who needs to know what, RAM helps teams move from confusion to confidence, turning project plans into delivered results.
What is the Responsibility Assignment Matrix (RAM)?
The Responsibility Assignment Matrix (RAM) is an essential project management tool designed to clarify roles and responsibilities within a project. At its core, RAM serves as a blueprint for project execution by categorizing stakeholders into defined roles. These roles are Responsible, Accountable, Consulted, and Informed, commonly referred to as the RACI matrix. By employing a RAM, project managers can effectively delegate tasks, enhance team communication, and reduce ambiguity in project workflows.
RAM’s primary value lies in its ability to facilitate clear communication and role demarcation among team members. By outlining who is Responsible for task execution, who holds the ultimate Accountable authority, who should be Consulted for input, and who ought to be Informed of progress, the matrix ensures that all bases are covered. This structure simplifies task management and helps prevent project delays by ensuring that everyone understands their duties and expectations.
In project management practices, a well-developed RAM boosts efficiency by establishing transparent pathways for delegation and consultation. It also serves as a helpful guide for integrating cross-functional team dynamics, which are vital in collaborative workspaces. Difference Between Responsibility Assignment Matrix and RACI Matrix
In project management, both the Responsibility Assignment Matrix (RAM) and the RACI matrix serve as frameworks to define clear roles and responsibilities. However, they differ in their approach and application, necessitating a distinct understanding for effective project implementation.
- Ready to use
- Fully customizable template
- Get Started in seconds
Roles and Responsibilities Explained
The Responsibility Assignment Matrix (RAM), an integral tool for project management, demystifies and assigns specific roles among team members, ensuring efficiency and clarity. The key components, known as the RACI model, divide responsibilities as follows:
Responsible:
This role entails the individual(s) who physically perform a task or activity. They are the action-takers who ensure the deliverables are executed. For instance, developers who are coding the features outlined in a project are tagged as responsible.
Accountable:
Crucial to the project’s success, the accountable individual is the decision-maker. They oversee the completion of work by the responsible parties, ensuring standards and timelines are met. In web development, a product manager often holds this role, signing off on a sprint before it is released.
These are the subject-matter experts whose opinions are sought during a task’s lifecycle. They offer guidance and feedback, ensuring insightful integration into the project. A legal consultant might review compliance documentation, providing essential advice to the project leads.
Individuals in this category need to be kept in the loop about major project updates and decisions, though they do not directly contribute to task completion. Stakeholders, such as business owners, often fall into this group, ensuring higher-ups are aware of project progress and outcomes.
Assigning clear roles is paramount to avoiding project delays and confusion. A well-implemented RAM facilitates timely communication, ensuring everyone understands their responsibilities in the broader project ecosystem. Task mismatches or overlaps can hinder productivity, but with Roles and Responsibilities , such issues can be preemptively addressed. Furthermore, using tools like Creately’s templates enhances team understanding and engagement with precise role allocation, leading to a well-oiled project management process.
By effectively utilizing a RAM, teams can synchronize efforts, maintain accountability at every project stage, and achieve a harmonious workflow. This structured approach not only defines expectations clearly but also empowers team members to contribute to the project’s success confidently.
Types of Responsibility Assignment Matrix
The versatility of a Responsibility Assignment Matrix (RAM) allows it to be customized to fit the specific needs of various projects. Below, we explore a few prominent types of Responsibility Assignment Matrices that can be utilized in diverse scenarios:
Functional RAM (F-RAM):
This type is ideal for projects where tasks align closely with specific departmental functions. It leverages the expertise of functional leaders, ensuring tasks are executed within the domain knowledge, enhancing precision and efficiency.
Projectized RAM (P-RAM):
Employed in projects where focus shifts to specialized skills required for a specific project. Roles are tightly aligned with project goals rather than functional departments, allowing teams to tackle unique challenges effectively.
These variations in RAM frameworks demonstrate the flexibility in aligning matrices to the unique demands of projects, making them invaluable tools for project managers striving for clarity and efficiency in responsibility assignments.
How to Create a Responsibility Assignment Matrix
Creating a Responsibility Assignment Matrix (RAM) is an essential aspect of effective project management. It provides clarity and direction by mapping out roles and responsibilities across team members, thereby optimizing collaboration and accountability. Here’s a step-by-step guide to creating a RAM:
1. List Project Activities
The foundation of an effective RAM begins with a thorough breakdown of project activities. This step requires careful analysis of the project scope to identify all significant components, deliverables, and ongoing tasks. Work with project stakeholders to ensure no critical activities are overlooked. Break down larger activities into manageable components while keeping them substantial enough to avoid micromanagement.
Define project phases with clear start and end points
Identify major deliverables that represent significant project outcomes
List critical milestones that mark important project transitions
Include key operational tasks required for project execution
Document ongoing support activities and maintenance requirements
Specify quality control and validation activities
Add project management and coordination tasks
2. Identify Team Members
A comprehensive understanding of your project team is crucial for accurate responsibility assignment. This step involves mapping out all individuals and their roles within the project context. Consider both direct team members and those who may have periodic involvement. Document their positions, departments, and general areas of expertise to facilitate appropriate responsibility assignments.
List project managers and their specific areas of oversight
Include team leaders responsible for different project components
Document technical staff members and their specializations
Identify support personnel who provide auxiliary services
Add department representatives who need involvement
Note external resources and contractors
Specify backup personnel for critical roles
Include subject matter experts who may provide specialized input
3. Define Responsibility Types
A clear definition of responsibility types ensures consistent assignment and understanding across the project team. Unlike more complex matrices, RAM focuses on straightforward responsibility levels that clearly indicate who does what. Each type should be clearly defined and understood by all team members to prevent confusion or overlap.
Primary Responsibility
Full ownership of task completion
Authority to make decisions
Accountability for outcomes
Direct reporting obligations
Secondary Responsibility
Backup support for primary owner
Shared task execution
Collaborative decision-making
Regular involvement
Support Role
Assists primary and secondary owners
Provides specific expertise
Limited decision-making authority
Task-specific involvement
Optional Involvement
As-needed participation
Advisory capacity
No direct responsibility
Periodic consultation
4. Create the Matrix Structure
The matrix’s visual organization is crucial for usability and clarity. Create a clear, easy-to-read format that allows quick identification of responsibilities and relationships. The structure should facilitate both detailed review and quick reference, with clear headers and consistent formatting throughout.
Select appropriate software tools for matrix creation and maintenance
Design vertical activity listing grouped by project phase
Create horizontal team member listing organized by department
Include clear column and row headers
Add department and role information
Implement consistent formatting for easy reading
Consider color coding for visual clarity
Include space for notes and clarifications
5. Assign Responsibilities
This critical step involves matching team members with activities based on their skills, availability, and authority levels. Each assignment should reflect both the needs of the task and the capabilities of the team member. Ensure balanced distribution of responsibilities while maintaining clear lines of accountability.
Designate primary responsibilities with clear markers
Assign secondary responsibilities to ensure backup coverage
Indicate support roles where additional assistance is needed
Mark optional involvement for consultative roles
Verify every activity has appropriate coverage
Balance workload across team members
Consider dependencies between activities
Account for team member capacity and availability
6. Review and Validate
Thorough review ensures the matrix accurately reflects project needs and team capabilities. Conduct structured reviews with stakeholders to verify assignments, identify gaps, and resolve potential conflicts. This step is crucial for gaining team buy-in and ensuring the matrix will be an effective project management tool.
Schedule review sessions with key stakeholders
Verify all activities have appropriate coverage
Check for balanced workload distribution
Confirm team member availability and capacity
Address any gaps or overlaps in responsibility
Document team agreement and acceptance
Incorporate feedback from review sessions
Finalize responsibility assignments
7. Distribute and Maintain
Implementation of the RAM requires clear communication and ongoing maintenance. Establish processes for distribution, updates, and regular reviews to ensure the matrix remains current and useful throughout the project lifecycle. Create clear protocols for handling changes and maintaining version control.
Share final matrix with all team members
Establish regular review intervals
Create update procedures
Track changes and modifications
Maintain version control system
Document change history
Set up accessibility protocols
Schedule periodic reviews
Create backup and archive procedures
Establish change approval process
Embracing these steps ensures that the Responsibility Assignment Matrix not only maps roles accurately but also fosters a collaborative environment, driving project success and reducing miscommunication risks.
For further visual assistance, consider exploring the Matrix Org Chart Template that can help visualize the responsibility distribution effectively, keeping alignment with project goals and organizational structure.
Helpful Resources
Create a work breakdown structure.
A hierarchical decomposition method that breaks down project deliverables into smaller, more manageable components.
Free RACI Model Template
A responsibility assignment framework that defines four key roles in task completion and decision-making processes.
Kanban Board Software
Kanban boards provide real-time visualization of work progress through distinct stages of completion.
When Should a Responsibility Assignment Matrix be Created?
A Responsibility Assignment Matrix (RAM) should be created at the beginning of a project and maintained throughout its lifecycle. It is an essential tool for project planning and execution, and should be developed as one of the first steps in the project management process.
The ideal time to create a RAM is during the project initiation and planning phases, for the following reasons:
Establish Clarity from the Start:
Creating a RAM early on helps set clear expectations and responsibilities from the very beginning of the project. This prevents confusion, overlapping work, and gaps in accountability as the project progresses.
Support Project Planning:
The RAM serves as a crucial input to other project planning artifacts, such as the work breakdown structure, project schedule, and resource planning. Defining roles and responsibilities upfront makes these downstream planning activities much more effective.
Facilitate Team Formation:
When a new project team is assembled, the RAM helps onboard members by clearly delineating their roles and expectations. This promotes faster team cohesion and productivity.
Manage Changing Scope:
As project scope evolves over time, the RAM can be updated to reflect new responsibilities and assignments. Maintaining a current RAM ensures the project stays on track despite changes.
Enable Monitoring and Control:
The RAM provides a framework for monitoring project progress and controlling task completion. Project managers can easily track whether work is being done as expected based on the assigned responsibilities.
Support Handoffs and Knowledge Transfer:
When team members join or leave the project, the RAM serves as a reference to quickly understand who is accountable for what, facilitating a smooth transition.
While the RAM is most critical during project initiation, it should be reviewed and updated regularly throughout the project lifecycle. This ensures the matrix remains an accurate and useful tool for managing responsibilities and facilitating project success.
Why a Responsibility Assignment Matrix is Essential for Project Success
Clarity and accountability.
A Responsibility Assignment Matrix serves as the cornerstone of project role definition, eliminating ambiguity and confusion that often plague complex projects. By clearly delineating who is responsible for each task and deliverable, RAM creates a transparent framework where every team member understands their precise role and obligations. This clarity extends beyond simple task assignment – it establishes clear decision-making pathways, enables efficient performance tracking, and ensures that accountability is maintained throughout the project lifecycle. When challenges arise, team members can quickly identify the appropriate person to address issues, reducing response time and improving project efficiency.
Enhanced Cross-Functional Collaboration
The implementation of RAM transforms how cross-functional teams interact and coordinate their efforts. By providing a clear structure for inter-departmental collaboration, a Responsibility Assignment Matrixffectively breaks down traditional organizational silos that often impede project progress. Team members from different departments gain a comprehensive understanding of how their work impacts others, leading to more effective communication and coordinated effort. This enhanced collaboration reduces redundant work, minimizes misunderstandings, and creates a more cohesive project environment where resources and knowledge are shared efficiently across departmental boundaries.
Risk Management and Mitigation
Responsibility Assignment Matrix serves as a powerful risk management tool by establishing clear ownership of potential project risks and their associated mitigation strategies. Through explicit responsibility assignment, potential gaps in resource allocation or skill coverage become immediately apparent, allowing for proactive resolution before they impact project delivery. The matrix ensures that risk responses have clear owners, establishing structured escalation procedures when issues arise. This systematic approach to risk management significantly reduces the likelihood of missed deliverables and strengthens quality control measures across the project lifecycle.
Operational Efficiency
The implementation of RAM dramatically streamlines project operations by optimizing decision-making processes and resource utilization. Clear responsibility assignments reduce the need for excessive meetings and expedite issue resolution by eliminating confusion about who should address specific challenges. The matrix provides a framework for efficient workflow management, enabling better capacity planning and resource allocation. This improved operational efficiency translates directly into enhanced productivity and more effective use of project resources.
Team Empowerment
A Responsibility Assignment Matrix creates an environment of empowerment by providing team members with clear understanding of their authority and responsibilities. This clarity enables confident decision-making within defined parameters and increases job satisfaction through reduced role ambiguity. Team members can better plan their career development as they understand the full scope of their responsibilities and can identify areas for growth. The resulting increase in engagement and morale leads to higher productivity and better project outcomes.
Project Control and Monitoring
A Responsibility Assignment Matrixsignificantly enhances project oversight capabilities by providing a clear framework for progress tracking and performance monitoring. Project managers can easily track milestone completion, resource utilization, and deadline adherence through the lens of assigned responsibilities. This improved visibility enables more effective status reporting and budget control, allowing for timely interventions when projects deviate from planned parameters. The matrix serves as a foundation for establishing clear performance metrics and ensuring consistent project delivery.
Stakeholder Management
Effective stakeholder management is greatly enhanced through RAM implementation. The matrix clearly defines communication channels and information flow patterns, ensuring that all stakeholders receive appropriate updates and are engaged at the right level. This structured approach to stakeholder management leads to better expectation management, improved client satisfaction, and more effective vendor relationships. Clear responsibility assignments for stakeholder communication reduce the risk of mixed messages and ensure consistent engagement throughout the project lifecycle.
Implementing a Responsibility Assignment Matrix within collaborative workspaces can further smooth workflows and support dynamic project environments. The framework allows for efficient task execution while balancing diverse team inputs. Retrospective Meetings can be a great way to uncover insights and foster better collaboration
Common Pitfalls to Avoid
Implementing a Responsibility Assignment Matrix (RAM) can transform project management by creating clarity and structure. However, some common mistakes can hinder its effectiveness. Here’s how to avoid them:
Lack of Clarity:
Ambiguities in role definitions can lead to confusion. Ensure all team members understand their roles and responsibilities clearly within the RAM framework.
Overcomplication:
A RAM should be straightforward. Avoid including unnecessary details that complicate its purpose. Keep it streamlined for efficient communication.
Static Assignments:
Projects evolve, and so should your RAM. Regularly update role assignments to adapt to changes in project scope or personnel.
Missed Stakeholder Alignment:
Failing to engage stakeholders throughout the RAM process can result in oversight. Ensure ongoing collaboration and buy-in from all parties involved.
Tool Over-Reliance:
While templates and software tools can aid RAM creation, relying solely on them without input from your team may lead to gaps. Encourage regular discussions to complement these tools.
Avoid these pitfalls to harness the full potential of a RAM, ensuring that it remains a key resource for achieving seamless project outcomes.
How Creately Enhances Visual Project Management for Seamless Collaboration and Execution
Creately offers a comprehensive visual platform that transforms traditional project management workflows into dynamic, interactive processes. Here’s how Creately empowers teams to plan, manage, and collaborate effectively:
1. Visual Task Tracking for Clear Progress Monitoring
Creately makes task tracking intuitive by offering visual tools such as Kanban boards, Gantt charts, timelines, and flow diagrams. Teams can break down complex projects into manageable tasks and milestones, making it easier to see where things stand at any given moment. The visual approach ensures that tasks, deadlines, and progress are clear and accessible, helping teams stay on track while preventing bottlenecks.
2. Simplified Role and Responsibility Assignment
Creately simplifies the process of assigning roles and responsibilities using templates like the Responsibility Assignment Matrix (RAM) and RACI charts. Project managers can clearly define who is responsible, accountable, consulted, and informed (RACI) for every task. This ensures that all team members understand their roles, fostering accountability and reducing misunderstandings about who owns each task.
3. Common Workspace to Share and Manage Progress
Creately provides a centralized workspace where team members can easily share and manage all project-related materials. This workspace acts as a single source of truth, allowing teams to store diagrams, documents, and updates in one place. The shared environment ensures that everyone has access to the latest project information, avoiding confusion from outdated versions or fragmented files across different platforms.
4. Real-Time Collaboration for Faster Decision-Making
Creately’s real-time collaboration features enable team members to work together, regardless of location. Multiple users can simultaneously edit diagrams, add comments, and update progress. This immediate feedback loop encourages rapid decision-making and problem-solving, significantly reducing the time it takes to respond to issues or changes in project scope. Teams can brainstorm, strategize, and plan in real time, ensuring faster project delivery.
5. Customizable Visual Templates for Diverse Project Needs
Creately offers a wide variety of customizable templates, allowing teams to tailor their project management approach to their unique needs. Whether you need a work breakdown structure (WBS), flowcharts, mind maps, or specific methodologies like Agile or Waterfall, Creately’s visual templates help structure projects in the most effective way. This flexibility allows teams to visualize complex processes and workflows, leading to better planning and execution.
6. Integration with Other Tools for a Unified Workflow
Creately integrates seamlessly with other popular tools like Google Workspace, Slack, and Jira, ensuring that project management remains cohesive across platforms. Teams can link their visual diagrams with tasks, milestones, or communications in other tools, creating a unified project ecosystem that keeps everyone aligned and reduces duplication of work.
By fostering a workspace where ideas, tasks, and updates flow seamlessly, Creately enhances both individual accountability and collective productivity. This not only improves project outcomes but also nurtures a culture of collaboration and innovation within teams. As projects continue to evolve in complexity, having a platform that adapts to diverse needs and simplifies task management will become an indispensable asset. Creately is more than just a tool—it’s a strategic partner in transforming how teams work together to achieve success.
AcqNotes. “Responsibility Assignment Matrix (RAM) - AcqNotes.” AcqNotes, 20 July 2017, acqnotes.com/acqnote/careerfields/responsibility-assignment-matrix.
Malsam, William. “How to Make a Responsibility Assignment Matrix for a Project (Template Included).” ProjectManager.com, 10 June 2021, www.projectmanager.com/blog/responsibility-assignment-matrix .
Six, Ten. “What Is a Responsibility Assignment Matrix (RAM) in Project Management?” Ten Six Consulting, 11 Apr. 2024, tensix.com/what-is-a-responsibility-assignment-matrix-ram-in-project-management/.
FAQ about RAM
What is a responsibility assignment matrix (ram) in project management, what can a responsibility assignment matrix (ram) eliminate.
A RAM eliminates several common project management challenges:
- Role ambiguity and confusion about task ownership
- Duplicate efforts and redundant work
- Communication gaps and information silos
- Decision-making bottlenecks
- Unclear escalation paths
- Resource allocation conflicts
- Accountability issues
How does a RAM differ from other project management tools?
Unlike other project management tools:
RAM focuses specifically on responsibility assignment rather than scheduling or task management
- It provides a clear framework for decision-making authority
- It explicitly defines different levels of involvement for each task
- It helps balance workload and authority across the team
Chiraag George is a communication specialist here at Creately. He is a marketing junkie that is fascinated by how brands occupy consumer mind space. A lover of all things tech, he writes a lot about the intersection of technology, branding and culture at large.
Related Tools and Resources
Join over thousands of organizations that use Creately to brainstorm, plan, analyze, and execute their projects successfully.
Home › Blog › The Complete Guide to the Responsibility Assignment Matrix
By Bradford R. Glaser
The Complete Guide to the Responsibility Assignment Matrix
- November 1, 2024
Learn how to streamline your projects using the Responsibility Assignment Matrix to define roles clearly, improve communication, and boost team efficiency.
In project management, success often depends quite heavily on a clear idea of who’s responsible for what. You might find a tool called a Responsibility Assignment Matrix – or RAM – that can be really useful. It helps you to gather together all the tasks and then define the roles within your team clearly.
If this is clear, you can prevent any common misunderstandings. It makes sure that your project remains on course – it keeps everything quite smooth and easy!
If you get a good grasp of RAM, then your team can become more efficient. You’ll likely see improvements in communication as well – this post guides you through RAM. It explores the main parts and explains all the perks it has.
So, let’s just jump in and see what RAM is all about!
Recommended event from HRDQ-U
Join accountability expert Linda Galindo to learn what is accountability at work, what it’s not, and how it can give your organization a much-needed makeover that will result in higher retention rates, improved morale, fewer errors, stress reduction, and better overall performance. Using real-life examples and a three-step model, Linda will demonstrate how anyone can instill and apply the mindset of personal accountability in their everyday work life.
What Is a Responsibility Assignment Matrix?
If you want to explain and communicate the roles and some more responsibilities within an expert project team, a Responsibility Assignment Matrix, usually called a RAM or a RACI matrix, is a project management tool that’s worth mentioning. It’s especially handy because it makes sure that everyone knows their specific duties – this improves communication and accountability at every step throughout the project !
Roles are defined in four categories in this matrix: “Responsible,” “Accountable,” “Consulted,” and “Well-informed.”
- The one who actually completes the job at hand is often labeled “Responsible.”
- The person who takes ultimate responsibility for the job’s success and makes key decisions is also labeled “Accountable.”
- People who give you useful plans and expertise are often in the “Consulted” category.
- People marked as “Well-informed” are kept up to date on various progress and results.
The RAM is structured as a simple matrix. Tasks are listed along one main axis, and team members or roles are listed along the other. At each intersection, a letter (R, A, C, I) suggests the level of responsibility for that job – this setup provides a clear visual representation of who’s involved in each job and what their specific role really is.
In a website design project, just to give you an example, you might see the RAM listing tasks like designing the homepage or writing some content. Particular team members or leaders are assigned as “Responsible” or “Accountable.” In a pitch deck, the RAM outlines who’s tasked with compiling data, which may lead to quick completion and expert analysis, and who’s “Well-informed” about progress.
The RAM is specific because it focuses purely on roles and responsibilities specific to an expert project, not to mention organizational charts and all those standard role descriptions. Organizational charts illustrate proper hierarchy within an organization, while a RAM gives a complete overview of tasks instead of just showing reporting lines. Standard role descriptions are too general and not fully customized to individual projects. But a RAM actually outlines exact tasks and responsibilities – this cuts back on potential confusion.
If you want to remove confusion and downtime, RAM is helpful here too. It defines roles and makes sure that everyone quietly knows their part in the project timeline. It improves communication and accountability as well. The project management process can become way more efficient . A RAM has a well-structured strategy for planning , allowing you to really execute and watch project tasks – to make successful project management .
How to Create a Responsibility Assignment Matrix
If you want to get started, then you should list all the project tasks and your deliverables – that means recognizing every such activity that matters to reach the project’s goals. After you list your tasks, then find all the project stakeholders. You should include your internal team members and also add any external partners and customers involved .
When you define roles , it helps when everyone is involved.
When you define the scope of the project, it matters. To completely learn about what the project will need, you should communicate with the stakeholders you need to talk to and those who make decisions. If you define the project’s goals and scope, everyone will be on the same page – and you minimize misunderstandings.
After creating a clear scope, you should choose roles and responsibilities. You should outline each project role and choose who will be “responsible,” “accountable,” “consulted,” and then “well-informed” for each job. The “Responsible” person completes the job, while the “Accountable” individual makes sure that the job is completed. “Consulted” people may give you opinions, and people who are “Well-informed” are basically kept updated on the progress.
Assign stakeholders to each job role based on their roles. Stay around so there’s only one “Accountable” person per job to prevent confusion and keep being clear and accountable within the project .
Review and validate the matrix with your team members next. Hold review sessions to make sure everyone closely learns about their roles and responsibilities. Validate the matrix closely to make sure no assigned roles are then ignored and that everyone comprehensively learns about them as well.
You have to update the RAM. As the project evolves, you should review and update the RAM to closely reflect any basic changes in your scope , team composition, or responsibilities to keep the matrix accurate and deeply relevant throughout the project’s lifecycle.
Before you create the matrix, make sure all your stakeholders can learn about their full responsibilities and also the project’s goals. Try not to overload any single team member with too many tasks. Keep non-stop communication and ensure stakeholders agree on the final RAM.
Challenges in creating a RAM can then come from miscommunication or vague roles. To overcome these challenges , welcome open dialogue and real collaboration with the team members. Input from all your team members will help you build a RAM that soon covers all bases!
The RACI Model Components
Every single part of an expert project matters a lot because it makes sure that everything runs smoothly. Let’s check out each role and why they matter for the success of any project you’re mixed up in.
The “Responsible” individual or team refers just to the people who manage the work. They roll up their sleeves and then get the actual tasks or your deliverables done. When you learn about who’s “Responsible,” it matters because now it clears up any confusion about who should do what, so you leave no room for misunderstandings.
We then have the “Accountable” person – this person owns the job. They stay around to make sure everything is completed the right way and delivered on time, so they take final responsibility for this outcome. When you have one person in this role, it then avoids conflicts and makes decision-making easy and clear.
People who are “Consulted” matter because their input is needed to complete the job well. In most cases, they’re experts or stakeholders who give useful feedback .
The “Well-educated” people are just those who need updates on the job’s progress or important results. They don’t directly contribute but are kept up-to-date for transparency or handling expectations. When you keep these people “Well-educated,” it matters to maintain good communication and avoid surprises later.
Project managers love the RACI model because it has clear roles and such a structure. It helps teams stay away from overlap and can fill any responsibility gaps by defining roles – it cuts back on all misunderstandings and improves efficiency – this model is flexible , so you can effortlessly fit all kinds of projects, whether small or large.
In a software development project, just to give you an example, the developer is “Responsible” for coding a feature. The project manager is “Accountable” for the project’s success. The UX designer is “Consulted” for design expertise and then the client is “Well-educated” about the project’s progress – this setup surely makes sure everyone knows their role and contribution to the project’s success that way.
In the same way, in a marketing campaign, the content writer is honestly “Responsible” for creating strong copy. The marketing manager is the one “Accountable” for the campaign’s success. On the other hand, the graphic designer is “Consulted” to really align visuals with goals, and the sales team is perhaps “Well-educated” about launch details – this being very clear makes sure everyone or each person knows where they ultimately stand and how they can fit into the big picture.
Common Mistakes with RAMs and How to Avoid Them
If you try to put a Responsibility Assignment Matrix in place, you might see that the teams often manage the common stumbling blocks. One regular hiccup is that the matrix is usually more tricky than it needs to be. If you think that adding more facts will improve its effectiveness, it can just give you unnecessary confusion. It’s good to keep things easy and simple.
If you stay around when everything is crystal clear, then every team member will know exactly what their roles and responsibilities are. A simple RAM is easier to learn about and it’s also easier to manage. When you’re clear, it’s good.
Another issue that crops up is usually a lack of flexibility. A RAM shouldn’t be a rigid or static document. As projects change and evolve, your RAM should too. If you follow a matrix that does not adapt, it risks becoming irrelevant as the project moves forward.
If you welcome your team to be open to changing the RAM as the project slowly progresses, this flexibility lets you respond faster and more efficiently to changes that may come up.
One more common problem is that you don’t update the RAM frequently enough. If you set it up at the beginning of a project and then suddenly forget about it, it’ll cause outdated information and misaligned responsibilities. It’s good to review and update your RAM to ensure it accurately reflects the latest state of the project. When you keep it updated, it makes sure everyone stays on the same page and helps avoid misunderstandings.
If you welcome your team or try to schedule regular check-ins to review the RAM, it’s a good practice. These sessions don’t have to be long. But they’re each a big ingredient when it comes to accuracy. If you talk about any changes in the project scope or team structure during these reviews, adjust that RAM accordingly – this proactive strategy helps you keep the matrix relevant and very useful.
From my experience, a well-maintained RAM can slowly improve team coordination and it can help you achieve the success of a project. It can be a clear guide for everyone involved whenever you need it and minimizes the chances of tasks falling through the cracks. You want to create and build a RAM that serves your team well.
Maximize Your Team’s Efficiency
If you think about the process through the Responsibility Assignment Matrix, it can become clear that the roles and responsibilities can change how a team works. Projects run much smoother, and communication improves naturally when everyone knows their specific role. When you’re clear, it helps to prevent confusion. But it also improves accountability, which can change the game in any project setting.
If you think about the benefits of a structured strategy for assigning tasks, it can minimize the chances of tasks being ignored. It makes sure everyone is lined up with the project’s goals, and this alignment is a big part of maintaining momentum and desired results. The Responsibility Assignment Matrix can be worth mentioning as a reference point.
It helps to resolve any disputes and keeps the project on track. It’s an easy yet useful tool that can improve team collaboration and efficiency.
Now, on the topic of accountability, the Accountability Now! From Top to Bottom webinar by Linda Galindo has helpful plans. She explores how “accountability” can change organizations by improving retention, which can boost morale and improve performance. Participants will learn about helpful definitions of your “accountability,” along with a helpful checklist to look at behaviors and the worth of clear agreements.
Galindo introduces a three-step model for putting personal accountability in your work. She uses real-life examples to show how this mindset can cut back on errors, lower stress, and create a positive work environment. You can access this on-demand webinar for strategies to become a true catalyst for “accountability” in your organization.
Think about how these plans can also apply to your projects. Lessons learned from a Responsibility Assignment Matrix and “accountability” can give you more successful results. Creating an environment where everyone knows their role and feels “responsible” for their contributions – this strategy improves project success and can give you a positive and productive work culture.
What are your thoughts on this? How might these strategies help you and your team try to complete your goals? We would love to hear from you, so let us know in the comments!
Brad Glaser is President and CEO of HRDQ, a publisher of soft-skills learning solutions, and HRDQ-U, an online community for learning professionals hosting webinars, workshops, and podcasts. His 35+ years of experience in adult learning and development have fostered his passion for improving the performance of organizations, teams, and individuals.
Recommended training from HRDQstore
Check out our top-selling training materials on this topic.
Boost engagement and productivity with Accountability Experience! This powerful assessment and workshop helps employees build positive relationships, improve personal productivity, and reduce stress by fostering accountability. Managers will learn to set clear expectations and encourage accountability at all levels, leading to greater clarity, minimized conflict, and enhanced results. Close the gap between expectations and delivery, and create a more engaged, efficient workplace!
Your email address will not be published. Required fields are marked *
Share your comments with visitors to this page.
Save my name and email in this browser for the next time I comment.
HRDQ-U FREE Membership
Subscribe today to receive access to additional resources only available to our members. Watch all product demonstration events, listen to our full library of podcasts, receive the HRDQ-U newsletter and be first to hear about promotions and sales.
View All Membership Plans
Subscribe to HRDQ-U
Sign up to be notified of upcoming live webinars, in-depth workshops, podcasts, blog posts, promotions and much more. Stay ahead of the curve and subscribe for FREE today !
- 827 Lincoln Ave. #B-10 West Chester, PA 19380
- [email protected]
- +1-610-279-2002
- +1-800-633-4533
What Is A RACI Chart? How This Project Management Tool Can Boost Your Productivity
Updated: Jun 4, 2024, 2:46pm
The RACI chart has long been a popular tool amongst project managers around the world. Also referred to as the RACI matrix, it’s used to clarify employee roles and responsibilities for each task, milestone and decision that takes place throughout a project.
The chart is designed to ensure clear communication and smooth workflows across all parts of a team. RACI charts can help prevent that sinking feeling when a major decision-maker comes at the end of a project and complicates things with a large number of changes because they weren’t consulted throughout the project.
Featured Partners
From $8 monthly per user
Zoom, LinkedIn, Adobe, Salesforce and more
On monday.com's Website
Yes, for unlimited members
$7 per month
Slack, Microsoft Outlook, HubSpot, Salesforce, Timely, Google Drive and more
On ClickUp's Website
$10 per user per month
Salesforce, Adobe, Miro, Netsuite, Quickbooks, SAP
On Wrike's Website
Yes, for one user and two editors
$9 per user per month
Google Drive, Slack, Tableau, Miro, Zapier and more
On Smartsheet's Website
What Is a RACI Chart?
A RACI chart, also called a RACI matrix, is a type of responsibility assignment matrix (RAM) in project management. In practice, it’s a simple spreadsheet or table that lists all stakeholders on a project and their level involvement in each task, denoted with the letters R, A, C or I. Once these roles are defined, assignments can be attributed to the roles and work can begin.
R, A, C, I stands for:
Responsible
Accountable.
Here’s what each designation means:
Responsible designates the task as assigned directly to this person (or group of people). The responsible person is the one who does the work to complete the task or create the deliverable. Every task should have at least one responsible person and could have several.
Responsible parties are typically on the project team and are usually developers or other creators.
The accountable person in the RACI equation delegates and reviews the work involved in a project. Their job is to make sure the responsible person or team knows the expectations of the project and completes work on time. Every task should have only one accountable person and no more.
Accountable parties are typically on the project team, usually in a leadership or management role.
Consulted people provide input and feedback on the work being done in a project. They have a stake in the outcomes of a project because it could affect their current or future work.
Project managers and teams should consult these stakeholders ahead of starting a task to get input on their needs, and again throughout the work and at the completion of a task to get feedback on the outcome.
Not every task or milestone needs a consulted party, but the project manager should consider all possible stakeholders when creating the RACI chart and include as many consulted parties as is appropriate. You should limit this to only necessary input, however. For example, one consulted party per affected team is generally considered best practice to avoid clogging the process with too much input.
Consulted parties may be individuals on the project team who aren’t working on a given task but whose work will be affected by the outcome. They’re also often teammates outside of the project team—even in different departments—whose work will be affected by the outcomes of the project.
Informed folks need to be looped into the progress of a project but not consulted or overwhelmed with the details of every task. They need to know what’s going on because it could affect their work, but they’re not decision makers in the process.
Informed parties are usually outside of the project team and often in different departments. They might include heads or directors of affected teams and senior leadership in a company.
When Should You Use a RACI Matrix?
The framework of a RACI chart is useful for almost any project, although some teams might find it more useful than others
For example, I know in creating this article that I’m the responsible party, because I’m doing the work of writing. My editor is accountable for assigning and reviewing the work. And they likely have consulted and informed others around them, such as a managing editor and an SEO specialist.
But this project is fairly simple. It only takes a few steps and includes a handful of stakeholders. A formal RACI chart comes in handy for complex and long-lasting projects that include lots of stakeholders, tasks and milestones, especially if work is overlapping.
For example, a company’s website redesign would require design, copy and development teams to work on tasks concurrently. Each task would affect work in sales, marketing, finance and business development. Structural changes, timelines and major costs would require input and approval from senior management.
Needs are easily overlooked and requirements dropped in such complex projects.
A project manager typically creates a RACI chart to avoid missing those important details and ensure clear communication throughout the project.
Using RACI with Other Project Management Methodologies
Agile is a very popular type of project management, especially for tech workers. While RACI is applicable to agile project management, schools of thought vary on whether it is necessary for an agile context.
Additionally, the Scrum and Scrumban project management methodologies build project ownership (accountability) into their framework and are designed to facilitate regular communication among project teams and outside stakeholders. That makes a RACI chart seem redundant for this method and possibly a poor use of a project manager’s time.
However, additional communication and clarification—in a systematic fashion—tend to be more of a benefit than a drawback for any project, so some SCRUM project managers find RACI useful for clarifying roles for individual projects or their overall process.
Example RACI Chart (and How To Use It)
To create a RACI chart, list all of a project’s tasks down the left-hand column and stakeholders across the top row. For each task, enter an R, A, C or I to assign a level of involvement for each stakeholder in each task.
For example, in the matrix above:
- The senior analyst is responsible for completing the work in the econometric model.
- The SVP finance is accountable for that task—they assign it to the senior analyst and review the work.
- The team will consult the SEO lead for input before and feedback after the task.
- The team will inform the project manager, head of design, sales director and senior management of the project’s progress.
Color coding tasks can be useful to see at a glance whether any team member is responsible for too many tasks within a project and to make sure you’ve assigned at least one Responsible and one Accountable party for each task.
Breaking the chart down by project phases also lets you see how many tasks anyone is responsible for within a certain timeframe, which can help distribute work evenly and avoid overwhelm.
Pros and Cons of RACI
From a project management perspective, things like more organization and clearer communication are generally better, so the benefits of using a RACI chart on a project far outweigh the drawbacks in most cases. With that in mind, teams should be cognizant of the initial time investment of creating a RACI chart and the rigidity of the roles.
- Maintain clear and open communication with all stakeholders.
- Avoid overwhelming team members with tasks or unnecessary information.
- Avoid “too many cooks” offering input on any task.
- Help stakeholders prepare for a project’s future impact on their work.
- You might spend time unnecessarily creating the chart for simple projects.
- Roles are rigid and might not fully illustrate a team member’s stake in a project.
You might see additional drawbacks using a RACI chart for your project if your team succumbs to some common pitfalls, including:
- Stakeholders will be confused if they don’t understand the differences among the terms, especially Responsible versus Accountable and Consulted versus Informed.
- It’s a formality and a waste of time if no one references it after approval.
RACI Matrix Alternatives
Some teams find the roles designated through the RACI model aren’t the right fit for their projects. You might find better options in these less common alternatives—all use a chart with tasks and stakeholders like RACI, but they use different terms in an attempt to more clearly define roles.
This alternative to RACI uses the RACI model plus S for Supportive. This is someone who participates in doing the work of a task by supporting the responsible parties.
This model designates stakeholders as:
- Communicate: These are the consulted and informed parties.
- Approve: This is the decision maker.
- Responsible: This person does the work.
- Support: These parties support the responsible person in doing the work.
This model simplifies CARS with just the Responsible, Approve and Support roles. It eliminates communication outside the project team, which would need to be accounted for another way in the project management method.
This model includes these roles similar to RACI:
- Drivers: The people who do the work.
- Approvers: The decision makers.
- Contributor: People who are consulted on the task.
- Informed: People who are informed of the project’s progress.
In this model, stakeholders are assigned these actions:
- Contribute: People who are consulted and who do the work.
- Lead: People who delegate work and manage a task.
- Approve: Decision makers.
- Monitor: People who are kept in the loop on a project’s progress.
Bottom Line
Projects can be complex, confusing and chaotic. That’s why we rely on team members with the project management skills necessary to reign in the disparate pieces of a project and focus directly on keeping them organized as a project progresses.
A RACI chart is one tool that helps project managers keep a project on track.
By listing all stakeholders and assigning a level of involvement for each task, the chart helps teams communicate clearly and keep the right people in the loop.
- Best Project Management Software
- Best Construction Project Management Software
- Best Project Portfolio Management Software
- Best Gantt Chart Software
- Best Task Management Software
- Best Free Project Management Software
- Best Enterprise Project Management Software
- Best Kanban Software
- Best Scrum Software
- Best Agile Project Management Software
- Asana Review
- Trello Review
- monday.com Review
- Smartsheet Review
- Wrike Review
- Todoist Review
- Basecamp Review
- Confluence Review
- Airtable Review
- ClickUp Review
- Motion App Review
- Monday vs. Asana
- Clickup vs. Asana
- Asana vs. Trello
- Asana vs. Jira
- Trello vs. Jira
- Monday vs. Trello
- Clickup vs. Trello
- Asana vs. Wrike
- What Is Project Management
- Project Management Methodologies
- 10 Essential Project Management Skills
- SMART Goals: Ultimate Guide
- What is a Gantt Chart?
- What is a Kanban Board?
- What is Gap Analysis?
- Work Breakdown Structure Guide
- Agile vs. Waterfall Methodology
- What is a Stakeholder Analysis
- What Is An OKR?
Best Georgia LLC Services In 2024
Best Illinois LLC Services In 2024
Best Hawaii LLC Services In 2024
Best Idaho LLC Services In 2024
What Is an SSID (Service Set Identifier)?
What Is a Hybrid Cloud? Definition, Pros And Cons
Dana Miranda is a Certified Educator in Personal Finance® who's been writing about money management and small business operations for more than a decade. She writes the newsletter Healthy Rich about how capitalism impacts the ways we think, teach and talk about money. She's the author of YOU DON'T NEED A BUDGET (Little, Brown Spark, 2024).
With over a decade of editorial experience, Rob Watts breaks down complex topics for small businesses that want to grow and succeed. His work has been featured in outlets such as Keypoint Intelligence, FitSmallBusiness and PCMag.
- Contact sales
Start free trial
How to Make a Responsibility Assignment Matrix for a Project (Template Included)
The most important resource you’ll employ to deliver the project is people. They have to fit into the schedule and maintain the project budget. Defining what their roles and responsibilities are when executing tasks and delivering on the project goals is an important part of controlling the project.
How can you coordinate all the people who are involved in a project so they know what they’re doing and don’t block others from doing what they are assigned? Using a responsibility assignment matrix can help. An assignment matrix gives your project a team that gets things done.
What Is a Responsibility Assignment Matrix in Project Management?
A responsibility assignment matrix (RAM) is a project management chart used to identify and define the various people and organizations and outline each of their roles in working on tasks or delivering a part of the project.
Project managers use an assignment matrix to clarify what cross-functional teams do within the boundaries of the project and its numerous processes. Sometimes a responsibility assignment matrix is required when responding to a request for proposal (RFP).
ProjectManager manages project information by allowing teams to attach files directly to tasks, and our unlimited file storage keeps important project documents at your fingertips anywhere, anytime. Commenting on tasks can save time and tagging others in the project team creates a communication process that avoids the pitfalls of redundancies or unnecessary meetings.
Types of Responsibility Assignment Matrix
Using a responsibility assignment matrix is important in project management as it clarifies roles and responsibilities among the project team. It helps ensure accountability, enhances communication and streamlines project execution . There is, however, more than one type of responsibility assignment matrix. Here are some examples of the more common ones.
RACI Matrix
A RACI matrix is a visual tool that defines four key roles and responsibilities of the project team. It determines who is responsible, accountable, consulted and informed, the definitions of which follow. Not only does this clarify roles, but enhances communication, increases accountability and provides efficiency in the project management process.
- Responsible: Notes who is responsible for executing the task, which is then assigned to them.
- Accountable: Notes who has decision-making authority and how that power is delegated throughout the project team.
- Consulted: Notes who can offer insight into the task, from team members to stakeholders.
- Informed: Notes who is updated on what in terms of progress and performance, as well as when and how this information is disseminated.
This creates a map of connections between activities and project team members. Depending on the size of the project, there can be several assignment matrices used for various project levels.
DACI Matrix
A DACI matrix is also used to clarify roles and responsibilities, but unlike the RACI matrix, this one is focused on who the decider or person who provides the final decision in the project is. It also identifies the people who are accountable for the task or deliverables, who are consulted during the decision-making process and who should stay informed on progress.
RASCI or RASIC Matrix
This variation on the RACI matrix stands for responsible, accountable, supportive, informed and consulted. It, like all responsibility assignment matrices, defines roles for the project team . It also enhances collaboration by highlighting who provides support, which fosters better teamwork and communication. This improves accountability as everyone knows what they’re responsible for.
CARS Matrix
The CARS matrix is a project management tool designed to clarify roles similarly to the other responsibility assignment matrix described above. It stands for contributor, which is the team responsible for specific tasks or deliverables; accountable, who is the person responsible for the successful completion of the task; review, the individuals who review the work done by the contributors and provide feedback; and, finally, support for those who support the contributors, which could be anything from resources, tools and expertise to assisting in the completion of tasks.
PACSI Matrix
Another responsibility assignment matrix is the PACSI matrix. This acronym stands for Performer, or the team member responsible for executing a specific task; accountable, again, the person accountable for that work’s successful completion; consulted, who is sought out during the decision-making process; supportive, those who provide support for the performers; and informed, who just need to stay updated on progress .
RACI-VS Matrix
A variation on the RACI matrix is the RACI-VS matrix. It’s the same as a RACI matrix but includes two other parts: validator and supportive. These are defined as the person or group responsible for validating the deliverables, ensuring they meet the required standards and specifications, for the former, and the latter being the individuals or teams that provide assistance or resources to help those responsible for completing the tasks.
RACI-Q Matrix
Another variation on the RACI matrix is this one, which is the same, except for the addition of a quality. This responsibility assignment defines who has the role of ensuring that the output meets the required quality standards for the project. This might include reviewing the work, conducting tests or providing feedback on deliverables.
Get your free
RACI Matrix Template
Use this free RACI Matrix Template for Excel to manage your projects better.
Why Create a Responsibility Assignment Matrix?
The assignment matrix identifies what everyone on the team is responsible for, which means not only what their duties are, but how they participate in the project. Some will have defined tasks, others will offer help with work, and some are designated as decision-makers. These groups all have an identity and function within the project to help guide it towards a successful end.
Clear communication leads to more efficient projects. An assignment matrix facilitates better communication between team members and provides transparency by creating a system to make sure everyone is updated and always on the same page. Belaboring communications can bog down a project with too many pointless meetings and confusing interactions in which people try to understand what they’re supposed to be doing. Using the responsibility assignment matrix helps, but having project management software that connects teams in real time is ideal.
When Should a Responsibility Assignment Matrix Be Created?
The responsibility assignment matrix would be created at the start of the project . You’d want to have everyone on the project team aware of where they stand in terms of their involvement before they start executing tasks.
As much as its use is a preventative measure, it can be used prescriptively. If you’re deep into the project and things are not moving as planned, there could be communication gridlock. If team members are not in the loop, or misconstrue what they’re supposed to be doing, using a responsibility assignment matrix might untie those knots in the communication channel.
If there’s a problem with leadership overruling suggestions on how to advance the project and this is seen as a problem, the roles and responsibilities of the project team likely need refining. The responsibility assignment matrix defines who has the authority to make decisions and using it or revisiting can determine if the right people are in that position.
In fact, any of the definitions might need reexamining at any phase in the project. Perhaps tasks are falling behind schedule. This could be because team members aren’t aware of what tasks they own. Anytime a delay occurs, returning to the assignment matrix is a good first step, even if you went through the process as you should during the planning stage of the project.
How to Create a Responsibility Assignment Matrix
The actual making of a responsibility assignment matrix is not as difficult as getting everyone on board with what their roles and responsibilities are.
Therefore, you want to include your team in the process, get their input and eventually buy in without spending too much time and energy on the process. Follow these steps to make sure everyone is in agreement and you’ll have a successful responsibility assignment.
- Identify all the participants involved in the project, from team members to stakeholders and everyone in between.
- List all deliverables associated with the project. Use a work breakdown structure to make sure you don’t miss any.
- Meet with team members on how to execute the tasks to create the deliverables. Every task needs to be discussed in terms of the team’s responsibility and authority.
- Draft the responsibility assignment matrix using a table with the project tasks listed on the left-hand column. Across the top add the name of everyone in the project.
- Where the tasks meet the project team member, assign whether they’re responsible, accountable, consulted or informed.
- When completed, share the responsibility assignment matrix with the project team and stakeholders and hold a meeting if necessary to make sure everyone understands their part in the project. If you’re working in a shared space, print out a copy and post it.
Responsibility Assignment Matrix Example
The best way to understand how a responsibility assignment matrix (RAM) works is to take a look at an example of how it could be used in a real-life scenario. For this responsibility assignment matrix example, we’ll use a RACI matrix , which is the most commonly used type of RAM.
For this example, let’s imagine the construction of an apartment complex . A real estate developer is building this multi-story building, which involves key stakeholders, such as the project manager, lead architect, lead engineer, general contractor, subcontractors and the legal team.
Let’s look at various parts of the project and define responsibilities. The project manager is responsible and accountable for planning but consults with the architect, engineer and legal team. The general contractor is kept informed during this process.
The legal team is responsible and accountable for site survey and land acquisition, while the project manager is consulted and the architect and engineer informed. The architect is responsible and accountable for the design process , with input from the project manager and engineer. The engineer is responsible and accountable for the structural design, consulting with the project manager and architect and keeping the general contractor informed.
While there are many more steps, such as permits, approvals, foundation and building frame construction, let’s jump ahead to the final approval and handover. At this point in the project , the project manager is accountable and responsible for this process, but the architect, engineer and general contractor are consulted and the legal team is kept informed.
Free Responsibility Assignment Matrix Template
Using a RACI template is a shortcut that sets up your team and the project for success. ProjectManager is more than an award-winning software that organizes tasks, teams and projects to streamline work and boost productivity, it’s also the online hub for all things project management.
Among the hundreds of blog posts, guidebooks and tutorial videos are dozens of free templates that can help you through every phase of your project’s life cycle . Using our free RACI template will help you guide all the project teams better, allowing them to know where they stand about the project and what their level of responsibility and accountability is.
Use it at the start of the project to avoid delays and untangle any communicative knots that are preventing the project from progressing as planned. To keep your project on track, download our free RACI template and get a head start on building a workable responsibility assignment matrix.
Best Practices When Making a Responsibility Assignment Matrix
Using our free RACI template is a good start, but you have to make sure you fill it in correctly. A responsibility assignment matrix is only as good as the effort put into creating it. Here are some best practices to apply when you’re in the process of building your assignment matrix.
- Involve the team: They’re the ones who will be executing the work. You want their input and buy-in to avoid any costly mistakes or time-consuming questions about what wasn’t made clear at the beginning of the project.
- Identify every single task: Identify all the tasks required to reach your final deliverable . Once you have that thorough list make sure that there is only one person on the team who is accountable.
- Update your RACI regularly: Make sure that each new one is marked as the most current version and is distributed to everyone on the team. There will be times when you’ll want to revisit the responsibility assignment matrix or personnel changes will require an edit.
- Share responsibility viably: One person shouldn’t have to shoulder the bulk of the responsibilities for the project and you want to give authority throughout the project team and not just among the very top management team.
- Optimize tasks: Managers can use the RACI matrix to see if too many team members have been assigned to a task. Maybe these workers could be spread out for greater productivity. There could be too many people listed as consulted, which slows down the process. The assignment matrix is endlessly useful.
How ProjectManager Helps You Manage Projects Better
ProjectManager is an online tool that connects everyone in real time to facilitate planning, monitoring and reporting on the project. It works to give everyone on the project team a job and the knowledge as to where they have authority and when to consult others, as well as defining the reporting process .
Let’s look at the people who are responsible, for example, the team who execute the project. Once invited into the software, you can share the project plan, assign them tasks, add detailed direction, add a deadline and tag for priority and more. The teams can then collaborate by attaching files and images to the tasks and commenting in real time to work better together.
Those who need to stay informed of the project can do so by also getting invited into the project and sharing plans and schedules with them. Stakeholders can stay updated with reporting features that can generate reports on project variance, cost, time and more with one click. Then share them as a PDF. Reports can even be quickly filtered to zero in on the data stakeholders are interested in.
The responsibility assignment matrix can help you reallocate your resources when things aren’t progressing as planned. Use our software to get further insight. The resource management features include a workload chart that’s color-coded so it’s easy to see who has too many tasks and who can take on more work. Then you can simply reallocate those resources from the workload page to help your team work more productively.
ProjectManager gets you organized and keeps your team focused on their tasks and stakeholders in the loop. Gain efficiencies throughout every aspect of your project’s life cycle with an online Gantt chart to schedule work and kanban boards, a visual workflow feature that provides transparency into production. All that and it’s on a collaborative platform to keep everyone connected. Try ProjectManager today for free.
Deliver your projects on time and on budget
Start planning your projects.
COMMENTS
Role distinction There is a distinction between a role and individually identified people: a role is a descriptor of an associated set of tasks; may be performed by many people; and one person can perform many roles. For example, an organization may have ten people who can perform the role of project manager, although traditionally each project only has one p…
The four components of a RACI matrix are Responsible, Accountable, Consulted, and Informed. Responsible refers to the individual(s) who completes the task, …
Simplified Role and Responsibility Assignment. Creately simplifies the process of assigning roles and responsibilities using templates like the Responsibility Assignment Matrix (RAM) and RACI charts. Project …
The responsibility assignment matrix is a project management style with four main roles: responsible, accountable, consulted and informed (this is also referred to as a RACI matrix).
A RACI chart is a project management tool that identifies roles and responsibilities for tasks within a project. Also known as a responsibility assignment matrix, it's used to plan roles and responsibilities in advance, so …
Roles are defined in four categories in this matrix: “Responsible,” “Accountable,” “Consulted,” and “Well-informed.”. The one who actually completes the job at hand is often labeled “Responsible.”. The person who …
Also referred to as the RACI matrix, it’s used to clarify employee roles and responsibilities for each task, milestone and decision that takes place throughout a project. The chart is designed...
A responsibility assignment matrix (RAM) is a project management chart used to identify and define the various people and organizations and outline each of their roles in working on tasks or delivering a …