Select your style for Master thesis planning

Academia Insider

A PhD timeline for finishing quickly [Free Gantt Download]

Navigating the labyrinthine journey of a PhD program is no small feat.

From the day you step into your graduate program as a bright-eyed doctoral student, you’re immediately thrust into a complex weave of coursework, research, and milestones.

By the second year, you’ve transitioned from coursework to research, laying the groundwork for your dissertation—a pivotal component in your scholarly endeavour. 

Come the third year, you face the critical oral examination, a hurdle that could make or break years of hard work.

But how does one streamline this multifaceted journey? The answer lies in a well-planned PhD timeline.

This blog serves as an invaluable guide for any PhD student looking to complete their doctoral studies efficiently, walking you through each milestone from coursework to graduation.

How to Begin with the PhD Timeline Planning?

Planning your PhD timeline is an essential first step in your PhD program.

Success in any PhD program depends, to a large extent, on effective time management and keeping track of progress through a thoughtfully crafted PhD timeline. 

Start with outlining all your major requirements:

  • coursework,
  • dissertation,
  • and the expected time needed for each task.

I also highly recommend factoring in failure time – give yourself a little bit of wiggle room for when things, invariably – go wrong. 

It’s crucial to remain realistic about the time you can commit daily or weekly while keeping long-term goals in mind.

Regular check-ins on your PhD timeline and supervisor will help you stay on track and allow you to adapt if necessary.

Adjustments may be needed as you progress through your PhD program, but having a timeline as a guide can make the journey less daunting and more achievable. 

Elements to include in a 3-year PhD timeline

The initial stage in this timeline typically involves coursework, often lasting one year, where the student engrosses themselves in advanced study in their chosen field.

Once the coursework is done (USA PhDs), they focus on proposing, conducting, and presenting their initial research.

By the end of the second year, most students should have a clear direction for their dissertation, a core component of the PhD process.

In this third and final year of the PhD timeline, the student focuses primarily on completing their dissertation, which involves collecting data, analyzing results, and organizing their research into a substantial, original, and cohesive document that contributes to contemporary knowledge in their field.

Regular reviews and modifications of the PhD timeline may also be necessary to accommodate various unpredictable circumstances, thus making this timeline both a guide and a flexible workplan.

It is a significant tool in successfully navigating the maze of becoming a PhD holder. 

Create Your PhD Timeline for a 3 year completion

Creating a timeline for a 3-year PhD program requires careful planning, as you’ll have multiple milestones and tasks to complete.

This timeline may vary depending on your specific field, institution, or country, but here is a general outline you can use as a starting point:

Year & QuarterActivity/MilestoneDescriptionOutcome/Output
Admission & OnboardingFormalities for joining the program, including orientation.Official start of the program.
Initial Literature ReviewFamiliarize yourself with the existing research in your field.Foundation for your research.
CourseworkComplete required or optional courses.Credits/Education
Research Proposal OutlineDevelop a draft outline for your PhD proposal.Outline for proposal
Coursework & SeminarsContinue with coursework and attend relevant seminars.Credits/Education
Meet with AdvisorDiscuss research interests and outline.Feedback for refinement
Complete Research ProposalFinalize your research proposal with your advisor’s input.Approved Proposal
Ethics Approval (if needed)Submit proposal for ethics approval if required.Ethics Clearance
Year & QuarterActivity/MilestoneDescriptionOutcome/Output
Data CollectionStart gathering data according to your proposal.Initial Data
Intermediate ReviewReview progress with advisor.Feedback for refinement
Data AnalysisStart analyzing the collected data.Preliminary Findings
Draft ChaptersStart writing initial chapters of your thesis.Draft Chapters
Further AnalysisConduct additional analysis if necessary.Refined Findings
Publish/ConferenceConsider publishing initial findings or presenting at a conference.Paper/Presentation
Complete Data CollectionFinish gathering all necessary data.Finalized Data
Update Thesis DraftUpdate your thesis draft with the complete analysis.Updated Draft
Year & QuarterActivity/MilestoneDescriptionOutcome/Output
Thesis WritingFocus primarily on writing your thesis.Near-final draft
Peer ReviewHave peers or mentors review the thesis draft.Feedback for refinement
Thesis SubmissionFinalize and submit your thesis for review.Submitted Thesis
Defense PreparationPrepare for your thesis defense.Defense Presentation
Thesis DefenseDefend your thesis in front of a committee.Committee’s Decision
Revisions (if needed)Make any revisions recommended by the committee.Final Thesis
Final SubmissionSubmit the finalized thesis.PhD Thesis
GraduationComplete any remaining formalities.PhD Awarded

Free Gantt chart excel template

Here is a free template you can modify for your own research:

Example Gantt chart for a USA PhD

Here are some common steps involved in completing a PhD, which I’ll use to create the Gantt chart:

PhD timeline USA PhD Gantt Chart

  • Orientation and Coursework (Semester 1) : Familiarization with the university, department, and coursework.
  • Coursework (Semester 2) : Continued coursework and possible teaching/research assistantships.
  • Select Advisor and Research Topic : Usually done towards the end of the first year or the beginning of the second year.
  • Preliminary Research : Initial research and literature review.
  • Complete Coursework (Semester 3) : Wrap up any remaining required courses.
  • Research Proposal : Develop a full research proposal including methodology.
  • Qualifying Exams : Exams to transition from a Ph.D. student to a Ph.D. candidate.
  • Begin Research : Start of actual research based on the approved proposal.
  • Conduct Research : Data collection, experiments, and analysis.
  • Intermediate Review : A review to assess the progress of the research.
  • Write Papers : Start writing papers and possibly publishing in journals.
  • Finalize Research : Final experiments and data analysis.
  • Write Dissertation : Writing the actual Ph.D. dissertation.
  • Dissertation Defense : Defending the dissertation before the committee.
  • Graduation : Completing all requirements and graduating.

Example Gantt chart for a UK, European and Australian PhD

For Ph.D. programs outside the United States, especially in Europe and some other parts of the world, students often go straight into research without the need for coursework. Here are some common steps for such programs:

PhD timeline UK PhD Gantt Chart

  • Orientation : Familiarization with the university and department.
  • Select Advisor and Research Topic : Usually done at the beginning of the program.

Wrapping up

The journey to earning a PhD is complex and demanding, filled with academic milestones from coursework to research to dissertation writing.

The key to a smooth and efficient doctoral journey lies in well-planned time management—a structured PhD timeline.

This blog serves as an invaluable guide, offering detailed tips for planning out each academic year in both U.S. and international PhD programs. It emphasizes the importance of starting with an outline of major requirements and factoring in “failure time” for unforeseen challenges.

For those looking to navigate their PhD journey in three years or beyond, having a flexible but comprehensive timeline can be the compass that guides them successfully through the academic labyrinth.

Whether you’re just starting out or already deep into your research, the principles and strategies outlined here can help streamline your path to that coveted doctoral hood.

thesis gantt chart example

Dr Andrew Stapleton has a Masters and PhD in Chemistry from the UK and Australia. He has many years of research experience and has worked as a Postdoctoral Fellow and Associate at a number of Universities. Although having secured funding for his own research, he left academia to help others with his YouTube channel all about the inner workings of academia and how to make it work for you.

Thank you for visiting Academia Insider.

We are here to help you navigate Academia as painlessly as possible. We are supported by our readers and by visiting you are helping us earn a small amount through ads and affiliate revenue - Thank you!

thesis gantt chart example

2024 © Academia Insider

thesis gantt chart example

Gantt Chart for a Research Project Proposal: Step-by-step guide

unnamed.png

In project management, there are few tools as effective and illuminating as the Gantt chart . This simple yet powerful visual tool is invaluable for anyone overseeing a complex task, including research project proposals. It is particularly beneficial in the early stages of a project, where meticulous planning is required to ensure that all elements of the project are understood, accounted for, and scheduled appropriately. Therefore, whether you're an academic researcher, a project manager in a corporate setting, or even a student planning your thesis, understanding how to create and use a Gantt chart can be a significant asset.

What is a Gantt Chart and what is it used for?

A Gantt chart, named after its creator, Henry Gantt, an American mechanical engineer and management consultant, is a type of bar chart that visually represents a project schedule. It was first developed in the early 20th century and has since become a staple in project management across various fields and industries. Today, it's used by project managers in sectors like construction, software development, research and development, and more.

At its core, a Gantt chart consists of two main components: tasks and time. The tasks related to the project are listed on the vertical axis, while the horizontal axis represents time. Each task is represented by a horizontal bar, the length of which corresponds to the duration of the task.

Make your own Gantt chart in Gleek .

Gantt charts are incredibly useful for planning and scheduling projects, tracking progress, and managing dependencies between tasks. They provide a clear visualization of the project timeline and help to identify potential bottlenecks and overlaps. This makes them an ideal tool for coordinating teams, allocating resources, and keeping stakeholders informed.

The versatility of Gantt charts solves numerous problems faced by project managers. They simplify complex projects by breaking them down into manageable tasks and visualizing their sequence and duration. This can help in avoiding over-scheduling, underestimating deadlines, and mismanaging resources.

Whether you're a seasoned project manager or a student working on a research proposal, mastering the use of Gantt charts can significantly streamline your project planning process and enhance your team's productivity.

Components needed for Research project proposal diagram

Creating an effective research project proposal diagram requires several key components. These elements provide a comprehensive overview of the project, including its timeline, tasks, and significant milestones.

Project Stages: Each stage of your research project should be clearly defined. This can include the literature review, methodology development, data collection and analysis, results compilation, proposal drafting, peer review, and final edits.

Timeline: The timeline provides a visual representation of the project's duration. It should outline the start and end dates of the project, as well as the estimated completion time for each stage.

Tasks: Each task within the project stages should be clearly outlined. This includes what needs to be done, who is responsible for it, and when it should be completed.

Milestones: Milestones mark significant achievements or phases in your project. These can help track progress and ensure that the project is moving forward as planned.

Dependencies: Dependencies show the relationship between different tasks. It's crucial to highlight how the delay in one task can impact others.

Status: The status of each task and stage helps monitor the project's progress. It can indicate whether a stage is completed, in progress, or yet to start.

Notes/Comments: Any additional information, observations, or feedback about the project can be included here. This could be insights gained during the research, changes made to the project plan, or issues that have arisen.

By incorporating these components into your diagram, you can create a well-structured, transparent, and efficient project proposal.

Creating a Research project proposal Gantt chart using the Gleek App

Step 1: launching gleek and selecting 'new diagram'.

First, launch Gleek.io in your web browser. Once you're in, select 'New Diagram' from the options available. In the diagram type, choose 'Gantt'.

choose-gantt.png

Step 2: Defining Research Goals

The research project initiates with an active phase dedicated to defining research goals, which commenced on December 15, 2023, lasting for a week. This phase involves brainstorming, outlining objectives, and establishing the research's overarching scope.

gc-proposal-1.png

Step 3: Literature Review Phase

Transitioning to the next stage, we have the completed 'Literature Review' phase spanning two weeks. This phase entails an in-depth analysis, sourcing relevant publications, synthesizing existing knowledge, and aligning it with the predefined research goals.

gc-proposal-2.png

Step 4: Methodology Design Phase

Progressing to the 'Methodology Design' phase, currently active for three weeks, this stage intricately structures the research approach. It involves designing methodologies, frameworks, and strategies based on insights gleaned from the literature review, ensuring a robust research plan.

gc-proposal-3.png

Step 5: Data Collection Phase

Following the planning stages is the critical 'Data Collection' phase, slated for four weeks. This phase involves meticulously gathering and assembling primary data, employing various methodologies such as surveys, experiments, or interviews, aligning with the established research framework.

gc-proposal-4.png

Step 6: Data Analysis Phase

Post-data collection, the active 'Data Analysis' phase spans three weeks. This phase engages in thorough data examination, statistical analysis, and deriving insights from the accumulated information. It involves identifying patterns, correlations, or trends relevant to the research objectives.

gc-proposal-5.png

Step 7: Results Compilation Phase

Subsequently, the 'Results Compilation' phase consolidates and organizes the analyzed data over two weeks, presenting it in a coherent format. This phase involves preparing comprehensive reports, graphs, or summaries, showcasing the findings derived from the data analysis stage.

gc-proposal-6.png

Step 8: Drafting Proposal Phase

Advancing further, the active 'Drafting Proposal' phase, extending over three weeks, involves crafting the research proposal. It includes outlining the research problem, detailing methodologies, and structuring a cohesive proposal aligned with the project's objectives.

gc-proposal-7.png

Step 9: Peer Review Phase

Upon completion of the draft, the two-week 'Peer Review' phase gathers insights and constructive feedback from peers or subject experts. It involves peer evaluations, discussions, and recommendations aimed at refining and enhancing the proposal's quality.

gc-proposal-8.png

Step 10: Final Edits

Finally, the one-week active 'Final Edits' phase focuses on meticulous revisions, addressing feedback, and ensuring the proposal's completeness, accuracy, and compliance with set standards. This stage includes proofreading, formatting, and polishing the final document.

gc-proposal-9.png

Step 11: Proposal Submission Milestone

The 'Proposal Submission' milestone, set for May 15, 2024, marks the conclusive stage, signifying the submission of the crafted and refined research proposal for evaluation and potential implementation.

gc-proposal-10.png

Hurray, You Did It!

And there you have it! Your Research Project Proposal Gantt Chart is now complete.

gc-proposal-11.png

This comprehensive diagram, with its clearly defined stages, tasks, timeline, dependencies, resources, and status, provides a holistic view of your research project. It not only serves as a visual representation of the entire project but also acts as a roadmap guiding you from the initial brainstorming phase to the final proposal submission. Utilizing such a diagram can greatly enhance your project planning and execution, ensuring all aspects are considered, dependencies are taken into account, and milestones are tracked. It fosters better coordination, communication, and understanding among team members, leading to more efficient and effective project management.

About Gleek.io

Gleek.io is a powerful tool that can further enrich your project planning needs. It's an intuitive app designed to help you visualize complex ideas, processes, and systems through various types of diagrams. Whether you need to create a flowchart, UML diagram, or even a Gantt chart like the one we've just built, Gleek.io makes the process straightforward and hassle-free.

With its keyboard-centric approach, Gleek.io allows you to create diagrams faster than traditional drag-and-drop tools. You can quickly jot down your ideas and see them evolve into structured diagrams in real-time, making it an ideal tool for brainstorming sessions, project planning, and presentations.

In conclusion, Gleek.io is more than just a diagramming tool. It's a platform that enables you to visualize your thoughts, communicate complex ideas simply, and manage your projects more effectively. Give it a try for your next project and experience the difference it can make!

Related posts

Beyond Traditional Planning: Top Gantt Chart Alternatives in 2024

Gantt chart critical path explained

Visual project management: Gantt Charts vs. Timelines explained

Pert vs. Gantt Charts: Choosing your project's blueprint

back to all posts

Banner

How to write a Research Proposal: Creating a Gantt chart

  • Components of a research proposal
  • Useful videos
  • Common mistakes to avoid
  • Sage Research Methods LibGuide This link opens in a new window
  • Managing sources
  • Request a literature search
  • Research proposal - examples
  • Creating a Gantt chart
  • Free Apps for Research
  • Academic writing

What is a Gantt chart

Some University departments require students to create a Gantt chart to represent a schedule for the research project. The Gantt chart shows the timelines of the various steps of the project including their dependencies and any  resources needed . In other words, the chart depicts when an event is supposed to take place in your project by providing an outline regarding the order in which the various tasks  need to be performed .

An example of a Gantt chart.

thesis gantt chart example

Gantt chart on Moodle

How to create a Gantt chart - videos

  • << Previous: Research proposal - examples
  • Next: Free Apps for Research >>
  • Last Updated: Apr 30, 2024 1:02 PM
  • URL: https://libguides.unisa.ac.za/research_proposal

Banner Image

Library Guides

Dissertations 1: getting started: planning.

  • Starting Your Dissertation
  • Choosing A Topic and Researching
  • Devising An Approach/Method
  • Thinking Of A Title
  • Writing A Proposal

Planning Your Time

The dissertation is a large project, so it needs careful planning. To organise your time, you can try the following:  

Break down the dissertation into smaller stages to complete (e.g., literature search, read materials, data collection, write literature review section…). 

Create a schedule. Working backwards from your deadline, decide when you will complete each stage. 

Set aside time to regularly work on the dissertation. 

Consider what times of day you are most alert and what makes a suitable space to study. 

Identify a specific task to work on. 

If overwhelmed, try to identify one task that needs doing rather than focusing on the larger project. 

Leave time to redraft, proof-read, format, and complete the reference list. 

Gantt Charts

As the dissertation project involves certain processes to take place simultaneously, rather than in a sequence, you can use a Gantt chart to organise your time.  

A Gantt chart is a bar chart which shows the schedule for a project. The project is broken down into key tasks/elements to be completed. A start and finish date for each task/element of the project is given. Some tasks are scheduled at the same time or may overlap. Others will start when a task has been completed. 

To produce a Gantt chart, you can use Word, Excel (see example in the attachment) or an online planner.

  • Tom's Planner . There's  an example  for you to use to complete your plan. 
  • Excel:  example of Gantt Chart in Excel . This is an example of a Gantt chart which can be used to generate a plan of work (timeline) for your dissertation. You can download and edit it as you please. The chart has been created by the University of Leicester. 

Gantt chart using Excel

Research Data Management

This video helps you to understand the importance of research data management and how you can plan, organise, store, preserve, and share your data.

  • Link to video on Research Data Management
  • Feedback Form Please give us feedback on our videos!
  • << Previous: Thinking Of A Title
  • Next: Writing A Proposal >>
  • Last Updated: Aug 1, 2023 2:36 PM
  • URL: https://libguides.westminster.ac.uk/starting-your-dissertation

CONNECT WITH US

  • Link to facebook
  • Link to linkedin
  • Link to twitter
  • Link to youtube
  • Writing Tips

How to Create a Research Timeline for Your Thesis

How to Create a Research Timeline for Your Thesis

  • 5-minute read
  • 21st May 2023

Beginning a dissertation can feel both thrilling and overwhelming. One of the best things you can do to prepare for the exciting journey of doing a dissertation is to design a comprehensive timeline as your guide. Here we will take you step by step through creating your thesis timeline and provide some example templates, so you’ll be well-prepared to begin your dissertation work.

Reasons for Creating a Timeline

There are many benefits to crafting a detailed dissertation timeline. In addition to helping with time management and meeting crucial deadlines, your timeline will also help you stay motivated by reviewing the tasks you have completed as you progress. A thorough timeline will be valuable during your dissertation proposal and useful if you are applying for grants or other additional funding.

Ste0ps for Creating a Timeline for Your Thesis:

  • Research and record all requirements and deadlines.

Before you write out your timeline, ensure you know all of your program’s requirements and deadlines. Academic institutions often require you to complete your dissertation within a specified timeframe.

There are likely several recommended or mandatory deadlines for approval of certain items by your adviser (and possibly the rest of your committee members). Gather all these dates beforehand so you can allot an appropriate amount of time to meet your deadlines.

It will be beneficial to meet with your adviser to understand when you are expected to complete the major phases of your dissertation work and to confirm that there aren’t any other requirements or deadlines that you may not be aware of.

  • List all of your tasks and bundle them into phases.

Now that you’ve assembled your dates, working backward from your deadlines is a good rule of thumb. List all of the required tasks that must be completed to meet each milestone, from coming up with your research questions to writing each chapter of your dissertation .

Even though your list will be unique to your research project, it can help to refer to a thesis checklist . It’s also helpful to assemble tasks into different phases (e.g., dissertation proposal, research recruitment). Grouping tasks into phases gives anyone looking at your timeline a quick overview of your research plan.

  • Organize your tasks into a schedule and assign task deadlines.

Now it’s time to build your timeline. There are many different free templates available online, from straightforward lists of deliverables to colorful options with room for notes and customization.

Find this useful?

Subscribe to our newsletter and get writing tips from our editors straight to your inbox.

A popular organizational approach for thesis timelines is a Gantt chart , which is a type of bar chart often used in project management in which the length of the bar corresponds to the time the task will take. The best choice for you will depend on the specifics of your research study and personal preferences. Whichever option you select, make sure you can easily edit and revise it as need be.

Sanity-Saving Tips:

●  Pay attention to your work style. Some people are more productive when writing in short bursts, while others write better after taking time to get into the zone. Some people choose to start writing parts of their thesis while still conducting research, while others prefer to focus on one phase at a time. Set yourself up for success by reflecting on what type of schedule will help you create the best quality work.

●  Schedule breaks. Almost everyone will work better after a well-deserved break. Make sure to schedule regular breaks into your timeline, as well as provide enough time to sleep, eat well, and do anything else you need to do to safeguard your well-being. 

●  Always have a plan B. Your dissertation is an extensive endeavor with many moving parts. It’s impossible to anticipate and plan for every conceivable event, but it’s helpful to expect something may occur that will cause a deviation from your original timeline. Perhaps study recruitment takes longer than you expected, or one of your committee members gets sick and you have to postpone your dissertation proposal. After you draft your timeline, check that it is not so strict that any disruption will cause a total derailment of your plan. Aim to strike a balance between goals that will inspire you to progress steadfastly and have some leeway in your timeline for the inevitable curveball that life will throw at you somewhere along the way.

Following these three steps will help you draft a timeline to steer the course of your dissertation work: research and record all requirements and deadlines; work backward from your dissertation deadline and assemble your task lists; and organize your tasks into a timeline.

Don’t forget to include ample time for editing and proofreading your dissertation . And if you are interested in any help from us, you can try a sample of our services for free . Best of luck in writing your dissertation!

Share this article:

Post A New Comment

Got content that needs a quick turnaround? Let us polish your work. Explore our editorial business services.

9-minute read

How to Use Infographics to Boost Your Presentation

Is your content getting noticed? Capturing and maintaining an audience’s attention is a challenge when...

8-minute read

Why Interactive PDFs Are Better for Engagement

Are you looking to enhance engagement and captivate your audience through your professional documents? Interactive...

7-minute read

Seven Key Strategies for Voice Search Optimization

Voice search optimization is rapidly shaping the digital landscape, requiring content professionals to adapt their...

4-minute read

Five Creative Ways to Showcase Your Digital Portfolio

Are you a creative freelancer looking to make a lasting impression on potential clients or...

How to Ace Slack Messaging for Contractors and Freelancers

Effective professional communication is an important skill for contractors and freelancers navigating remote work environments....

3-minute read

How to Insert a Text Box in a Google Doc

Google Docs is a powerful collaborative tool, and mastering its features can significantly enhance your...

Logo Harvard University

Make sure your writing is the best it can be with our expert English proofreading and editing.

Get started

  • Project management
  • CRM and Sales
  • Work management
  • Product development life cycle
  • Comparisons
  • Construction management
  • monday.com updates

How to use a Gantt chart for a research project

thesis gantt chart example

Using a Gantt chart for a research project can give all stakeholders a better understanding of timelines and the resources needed for each task.  With all project activities neatly laid out within a timeline and every minor detail accounted for, a Gantt chart provides your team with the framework for successful project operations.

In this article, we’ll discuss a Gantt chart and how you can use it in a research project to maximize efficiency and promote greater transparency. We’ll also share how you can use monday.com’s project management Work OS to simplify the management of any research project further.

What is a Gantt chart?

A Gantt chart is a bar chart popularized in the early 1900s by Henry Gantt. It lets you establish a detailed project plan according to when you need each task completed.

If done correctly, a Gantt chart creates a realistic time frame for a project by establishing a start date for the whole project and each task. Then, you can pair these start dates with an estimation of how long the task will take, broken down by days, weeks, or months.

What makes a Gantt chart unique is that it establishes dependency relationships between all relevant tasks, which can help you better understand necessary workflows.

For example, let’s say you’re creating a research proposal. One of your tasks is to promote awareness and garner support for the proposal on social media. However, before you can do that, you need to create informational materials you can distribute and have the proposal outline ready for viewing. Since these necessities are clearly outlined in the Gantt chart, you can plan your project timeline accordingly.

How can you use a Gantt for research projects?

Research projects are vast undertakings that require a lot of your time, effort, and brain power. Sometimes it’s easy to get sidetracked or confused about what comes next in your research or how you should put it together.

A clear understanding of objectives and deadlines can help you organize even the most complex research project undertakings. Even better, a Gantt chart provides clear step-by-step instructions with dependency relationships marked to ensure every team member understands their responsibilities.

A Gantt chart ensures all research project team members clearly understand objectives, deadlines, and task dependency relationships.

Best practices for planning and scheduling a research project

Understanding the best practices for planning and scheduling a research project can help you get the most out of your Gantt chart . A few best practices include:

  • Have a clear goal : Before sitting down to plan your research project, ask yourself some crucial questions. What are you trying to achieve? Why are you trying to achieve it? When do you need to complete it?
  • Use scheduling tools : Use task and resource scheduling tools when possible to reduce the risk of human error.
  • Get the team involved :  Gather your team together for a brainstorming session, if possible, when developing a list of tasks required to meet your final objective.
  • Consider dependency relationships :  Consider the dependency relationships between objectives carefully and be realistic about time frames. Ensuring your team has enough time to successfully and thoroughly complete each task from the beginning sets your research project up for success.
  • Identify potential issues : Identify risks and potential roadblocks in your schedule and have a backup plan for each to ensure a steady workflow with minimal pushbacks.
  • Consider resource requirements : Consider the resources necessary to complete each task. Remember to include work hours as resources and schedule each team member appropriately to achieve objectives in the desired time frame.
  • Plan for reporting : Assign specific times, or interval periods, for progress reports and compare these with your initial estimations. If these reports show alterations are necessary, don’t be afraid to make changes.
  • Identify KPIs :  Before the research project begins, identify key performance metrics and track them as you go to define your success clearly. You may find using a relevant tool or platform the easiest way to track performance metrics.

Having the right tools can increase efficiency, decrease downtime, and ensure objective deadlines are not only met but exceeded.

Managing research projects on monday.com

monday.com’s robust project management Work OS makes managing research projects easier by:

  • Centralizing projects from start to finish : Our Work OS lets you centralize all projects from conception to completion, with customizable dashboards that show you the information you deem most important. Quickly assess risks, bottlenecks, and roadblocks to keep your research project moving forward.
  • Streamlining project workflows : Streamline workflows by automating routine tasks and assigning teammates to the work they’re most qualified for. Then, track individual and project-wide progress in real-time with regular task updates. Use color coding to make task management even more straightforward.
  • Enabling communication across teams :  Our Work OS promotes communication between project members and across different teams, so all stakeholders know where things stand at all times. You can share documents, leave notes, and work together in real-time for more effective communication that allows you to exceed every deadline and meet every objective.

monday.com can provide your team with a Gantt chart view to make project management easier. Get started with monday.com’s powerful Work OS by building a research project workflow from scratch or try a few of our other templates for managing research projects easier.

Related templates

A basic Gantt chart can help you plan your research project in detail. On monday.com, you can add a Gantt View to any type of project board. Below are some of our recommended templates from our Template Center that you can use to fine-tune other essential aspects of your research project.

Keyword power tools template

Our  Research Power Tools Template uses a Gantt chart format to help you visualize project timelines, manage project resources, and monitor each phase of your research projects from one platform.

Publication and journals template

Our  Publications and Journals Template is an excellent tool for content publishing companies. You can use our template to:

  • Manage your publication process: Our template enables whole-process management from submission to approval. Easily track article status and monitor writer workload to ensure you meet publishing deadlines.
  • Visualize your publishing pipeline: Customizable dashboards allow you to receive a high-level overview of all current and upcoming articles and where they stand.
  • Track individual contributions: Ensure each writer meets minimum contributions and isn’t given too large a workload by tracking individual contributions.

By now, you should have a working idea of Gantt charts and how they increase transparency and efficiency in project management. However, if you still have questions, we’ve answered a few FAQs below.

How do you create a dissertation in a Gantt chart?

To create a Gantt chart for a dissertation, you should first understand your timeline and deliverables. Once you’ve written these down, create detailed task lists of how you’ll accomplish each deliverable and consider dependency relationships between each. Finally, use the Gantt chart to outline your dissertation from start to finish.

What should be in a dissertation timeline?

In a dissertation timeline, you should include the following:

  • Role assigning (if applicable)
  • Research tasks
  • Experiments, social or scientific (if applicable)
  • Data collection and analysis
  • First draft completion
  • Submission to the advisor (first) and dean (at completion)

How do you create a Gantt chart in Word?

You can create a Gantt chart in Microsoft Word by:

  • Opening a new Word document
  • Change the document orientation from vertical to horizontal
  • Insert a bar graph into your document
  • Make format alterations as necessary to make the graph look like a Gantt chart
  • Insert information and customize as necessary

Any team can increase transparency in their research projects with monday.com

Using a Gantt chart to create a detailed project timeline can help increase transparency and promote greater efficiency in your organization’s research projects.

When you pair a Gantt chart with monday.com’s robust project management system, you have the tools you need to meet deadlines, complete objectives, and exceed expectations.

Send this article to someone who’d like it.

  • How it works

researchprospect post subheader

Dissertation Gantt Chart – A Visual Way to Track your Dissertation Progress

Published by Ellie Cross at January 26th, 2023 , Revised On October 9, 2023

A dissertation Gantt chart is an essential tool for any student completing a doctoral degree. The chart helps you to organise and track your progress, ensuring that you complete your dissertation on time and with the required quality. 

The Chart Includes the Following Key Elements: 

  • Title of the Dissertation
  • Target Date for Completion
  • Estimated Time to Complete (ETC)
  • Actual Time to Complete (ACT)
  • Changes Made to ETC or ACT from the Original Plan
  • Summary of Major Accomplishments or Difficulties encountered during the project

Features of Gantt Chart 

The following are the key features of a dissertation Gantt Chart:

  • It has a timeline that shows the progress of the project.
  • It contains tasks and deadlines for each phase of the project.
  • It allows you to track resources and costs associated with the project.
  • It provides an overview of how much work remains to be done in each project phase.
  • It can help you to make informed decisions about when to take specific actions on the project.

How to Create a Custom Dissertation Gantt Chart?

When writing a dissertation , it is important to keep track of the progress and deadlines. One way to do this is to create a Gantt Chart. This guide will show you how to make a Gantt Chart for your dissertation. 

  • Decide what tasks need to be completed and when they need to be completed. The goal is to have everything on the chart in order by the deadline.
  • Start by creating a table or graph to represent your project’s timeline. This will help you to easily see where tasks are located and how much time they will take.
  • Next, add in each task’s duration (in hours and minutes), as well as the associated resources that will be needed for completion (e.g., research materials, software).
  • Finally, allocate specific days and times for each step of your project based on the information in your timeline table. This will help you stay organised and on track!
  • Assign each task a colour based on its importance. For example, green tasks should take less than an hour, and blue tasks should take more than an hour but at most two hours.

Gantt Chart Templates

There are many different Gantt Chart templates available online, so choosing one that best suits your needs is important.

Some popular templates include the Pareto chart and the Venn diagram. Both of these charts offer a variety of options for customisation, so you can create charts that look exactly the way you want them to. Additionally, both charts can easily be converted into graphs using GraphPad Prism.

If simplicity is key, then the line graph may be a better option. This chart offers minimal customisation options but allows you to clearly see trends and patterns in your data.

Hire an Expert Writer

Orders completed by our expert writers are

  • Formally drafted in an academic style
  • Free Amendments and 100% Plagiarism Free – or your money back!
  • 100% Confidential and Timely Delivery!
  • Free anti-plagiarism report
  • Appreciated by thousands of clients. Check client reviews

Hire an Expert Writer

The Importance of the Gantt Chart

Gantt charts are valuable as a student, and even if you are a university graduate, they can help you. Along with making good grades, as recommended by the university, you have to strive to take full advantage of the use of your projects. Brainstorming with your classmates can be a productive way to accomplish this objective. You need to use Gantt charts for your projects for several reasons.

It Helps Provide a Visual Outlook 

A Gantt chart helps you handle your workflow by providing a detailed graphical representation. Gantt charts allow you to see all the tasks that must be completed, the amount of time needed, and task overlap. This will allow you to keep better track of goals and deadlines, which will be useful in ensuring you are on time to complete everything.

Solve Challenges Easily

A Gantt chart allows you to determine even better how to avoid issues and get the job done faster. You can see the result of the tasks that have been completed if you want to perceive the resources rightly to make the project run smoothly and quickly.

Evaluate Time

Effective task planning with the Gantt chart will help you organise and finish the projects efficiently. In addition, it will make it easier to see the actions you must complete before beginning others.

Ease of Communication

The Gantt chart will help you keep your group and sponsors notified of the modifications to your timetable. That’s why it’s crucial to have a regular update if your schedule changes. This means you can even use and provide available resources effectively.

Oversee a Project

The Gantt chart is crucial to the success of a project because that is how it assists in directing its activities through scheduling, assigning, and monitoring tasks. The horizontal chart makes it easy to see the projects’ progressions. You also always get to know what’s happening within any ongoing tasks.

Ease your Brain’s Memory

Gantt charts can help you reclaim your mind space by easing the selection of content you need to remember. Then, all you have to do is focus on accomplishing and acting on your current priorities. Team members can also see the course of the project’s tasks.

Reduces Cost

A Gantt chart is beneficial if you want to cut down on costs. Equipped with this, you can appreciate the tasks that have been carried out and stay up to date on what needs to be completed. As a result, you will remember essential deadlines and thus save more money on expenses.

The Benefits of Using a Dissertation Gantt Chart

No one knows the feeling of sitting in front of a blank whiteboard, trying to figure out how to write a dissertation . The process can seem daunting and overwhelming, but using a Gantt Chart can make the entire process much easier.  

A Gantt Chart is simply a chart that helps you plan and track your tasks. It can be used for any project but is especially helpful when writing a dissertation. You can track your progress by breaking down your work into specific dates and tasks. 

You will be able to see exactly where you are in progress. A Gantt Chart can provide a visual representation of your progress, which can help motivate you to complete your work on time.

Do you lack time and want someone to write your dissertation for you? Do you want to save money on your dissertation? Are you looking for someone to help with the grant chart process? Check out ResearchProspect! They can help you find the perfect person to create your dissertation.

 You can trust these professionals to deliver top-notch work. Moreover, they offer affordable rates and a range of customisation options. So if you’re looking for an affordable and reliable writing service, look no further than ResearchProspect.

Frequently Asked Questions

What is dissertation gantt chart.

A dissertation Gantt Chart is a visual timeline or project management tool that outlines key research tasks, deadlines, and dependencies to help plan, track, and manage the progress of a dissertation project efficiently.

You May Also Like

Did you fail your exams and have to resit for them? Don’t panic, and follow our guide to achieve high grades in the resitting exam.

Here are a few ways you can make use of online social media networks for gathering data and conducting research for your dissertation project.

Use LaTeX for dissertations due to its precise formatting control. However, familiarity and collaboration are needed before deciding.

USEFUL LINKS

LEARNING RESOURCES

researchprospect-reviews-trust-site

COMPANY DETAILS

Research-Prospect-Writing-Service

  • How It Works

The Research Whisperer

Just like the thesis whisperer – but with more money, how to make a simple gantt chart.

In every grant application, I want to see a simple visual guide (a Gantt chart ) that shows what you are planning to do. It is the perfect time to plan your project clearly. It shows the assessors that you have thought about your research in detail and, if it is done well, it can serve as a great, convincing overview of the project.

Clearly, these charts are hard to do. If they were easy, more people would do them, right?

Here are five steps to create a simple guide to your research project.

1. List your activities

Make a list of everything that you plan to do in the project. Take your methodology and turn it into a step-by-step plan. Have you said that you will interview 50 people? Write it on your list.  Are you performing statistical analysis on your sample?  Write it down.

A list of research tasks: have a meeting, do desk audit looking at three key elements (code, plain language and machine readable) plus maybe a fourth element - icons, do some testing and write a report.

Check it against your budget. Everything listed in the budget should also be listed on your uber-list? Have you asked for a Thingatron? Note down that you will need to buy it, install it, commission it… What about travel? Write down each trip separately.

2. Estimate the time required

For each item on your list, estimate how long it will take you to do that thing. How long are you going to be in the field? How long will it take to employ a research assistant? Realistically, how many interviews can you do in a day? When will people be available?

Initial meeting: about 3 weeks to find a time. Desk audit: 4 months. Draft key elements: about 1 week each. Testing: about 1 week each, but can start organising as soon as first element is drafted. Write up: 2 months. Final report: no time, really – just need to find a time to meet.

Generally, I use weeks to estimate time. Anything that takes less than a week I round off to a week. Small tasks like that will generally disappear from the list when we consolidate (see Step 4). Then I group things together into months for the actual plan.

3. Put activities in order

What is the first thing that you are going to do?  What will you do next? What will you do after that?

In the comments, Adrian Masters provided some great questions to help with this stage: What do I need to do by when? What do I need from others & when? How do I check that I am still on track?

One by one, put everything in order. Make a note of any dependencies; that is, situations where you can’t do one thing until another is started or finished. If the research assistant is going to do all the interviews, then the interviews can’t start until the research assistant is hired.

Where possible, you should eliminate as many as possible dependencies. For example, if you can’t find a decent research assistant, you will do the fieldwork yourself (but that might mean that work will be delayed until you finish teaching). It isn’t a necessary step to getting your time-line in order, but it is good project management practice.

In the comments, Amy Lamborg pointed out that you might want to work backwards . If you have a fixed end date, you might want to “…build back towards the project start date, then jiggle everything until it fits !” If you want an example of this, have a look at the post “ Work backwards “. It is about writing an application, but the principle of starting with the fixed end date and working backwards still applies.

4. Chunk it up

Now that you have an ordered list, and you know how long everything will take, you need to reduce the list without losing any specificity. At the same time, if you are combining tasks, you might want to add a bit of time as a contingency measure.

Meet with partners: 3 weeks. Review data protection regimes: 4 months. Draft three key elements: 3 months. Test three key elements: 3 months, with some overlap. Analyse test results and report: 3 months.

How you divide up your time depends on your project. If it is only one year long, you might list items by month. If your project is three years long, then you might list items by quarter. If you are planning over five years, you might break it down to six-month periods.

5. Draw me a picture

If you use project management software to manage your project, and you are comfortable with it, then use it to produce a summary of your project, too.

Most project management software (e.g. like Microsoft Project) will allow you to group activities into summary items. Chunk your tasks into major headings, then change the time interval to your months, quarters, half-years, or whatever you have chosen to use.

Or you can just draw it up with word-processing software (which is what I always do), spreadsheet software, or even hand-draw it.

Example of a Gantt chart

Frankly, I don’t care – as long as it ends up in your application!

Also in the ‘simple grant’ series:

  • How to write a simple research methods section .
  • How to make a simple research budget .

Share this:

62 comments.

This is useful. I’m writing my first SERIOUS research proposal for my PhD. Obviously not something I’ve ever done before so all advice is greedily welcome.

My best advice – write something quickly and then get someone else to look at it. I’m a big fan of quick iterations to get started.

Your readers might be interested in Tom’s Planner ( http://www.tomsplanner.com ). It’s a very easy tool to help you create a schedule or project plan (and there is a free version). On our blog we have a bunch of guest blogs about planning your thesis or dissertation with a template and example to help you get started.

The free version is a farce you cannot print, export or do anything but view it online. So don’t waste time with this product it is not a real proof of concept.

Sometimes, when the chunks are too big, you end up failing to understand what’s in those chunks, then your estimate ends up WAY off when you realize the extra work you didn’t consider might go into a give task.

That looks like a useful technique for getting the right information together for a Gantt. I’d be interested in any techniques for step 5. It’s something I’ve done recently as part of my first year PhD report and I wrote about how I produced my Gantt chart here: http://phdtools.blogspot.com/2011/08/creating-gantt-charts.html

I can’t imagine many people use MS project to manage their entire PhD (I could be wrong?) therefore it seems a bit excessive to use it just for a Gantt chart. Equally I find Excel plots look a bit naff and it’s difficult to show linkages between items.

“I’m not looking for a tool to perform PERT or CPM or do resource levelling for me.”

Absolutely! I just want to plug in my info and get a simple image out. How hard is that?

I’m not a big fan of big-iron project management tools either. More time seems to go into managing the information than getting actual work done.

I do think that most group projects that are going to last twelve months or more could do with a simple project management tool, though. I’m a bit of a fan of Basecamp , even if it doesn’t draw Gantt charts.

Of course, everybody has to understand the tool and want to use it, which is a different matter.

Thanks for the post.

I’m currently trying my hand at project management software, but I seem to find it easier to simply write down stuff in a piece of paper before committing it to electronic format. Anybody else has the same issue?

Absolutely, Carlos. As someone who has managed a big project that included spending a lot of time wrangling MS Project, I’m a big fan of just scribbling it down on paper and then mocking it up in MS Word.

[…] How do you create a Gantt chart?  The best advice we have seen is at the useful Research Whisperer blog, where they list 5 steps to creating your very own Gantt Chart in the post ‘How to make a simple Gantt chart’.  […]

Excellent introduction to project planning. I’ve seen recent examples of project managers jumping into MS Project without this level of thinking, with predictable results.

Questions that should help (and which you would need to answer anyway when asked by seeking funding or approval) include: What do I need to do by when? What do I need from others & when? How do I check that I am still on track?

Build those answers into the simple paper approach above, and you’ll have covered the critical project basics (activities, resources, dependencies, scheduling, milestones and checkpoints)

Like Liked by 1 person

Thanks, Adrian.

I liked your questions so much, I added them into the original post. 🙂

An Excel bar chart is pretty much all you need to create a Gantt chart. Unless of course you intend to explore resourcing and costs.

Your info really helped me by doing my D.T ( Design Technology) homework. Thank You 🙂 Eirene Masri From Jordan, Amman

Thanks for your comment. It made me smile. 🙂

I haven’t been to Jordan for a very long time, but I had a great time when I was there.

[…] that you are going to do?  What will you do next? What will you do after that? In the comments, Adrian Masters provided some great questions to help with this […]

Thanks for this particular piece of ‘whisper’… I was in a dire need of a ‘quickie’ method to make a simple Gantt Chart. 😀

Cheers, Yan London

No worries, Yan. Happy to help.

[…] Jonathan. “How to make a simple Gantt Chart” The Research Whisperer. 13 September […]

I have just gone through.Iam also planning to undertake a phd programme and would want to recieve guild as i make progress using gantt Chart

Reblogged this on Queer Fear: Alternative Gothic Literary and Visual Cultures and commented: Stumbled across this useful piece on the use of Gantt charts in research projects. I realise this may seem rather common knowledge to scientists but as a Arts and Humanities-based person I found it gave useful insights for new researchers.

Thanks, Hanoconnor.

I suspect that there are plenty of science people who don’t get any formal training in this, either.

good job. very helpful

[…] Read More At: https://theresearchwhisperer.wordpress.com/2011/09/13/gantt-chart/ […]

This is my first time using a Gantt chart in research paper.. hmm. thanks for the info. 🙂

Gantt charts are really useful. Thanks for posting this information about gantt charts. This is a very informative post and very helpful, too.

Thanks Jonathan. I have just completed my first Gantt chart for my Doctorate in Health. I was beginning to get a bit jumpy about some of the very involved instructions I had found previously so your ‘idiots guide’ was really helpful.

No worries, Ade.

Happy to help. Good luck with your doctorate.

I have been using a Gantt chart to plan and track my doctorate since I began last year. It’s just an Excel spreadsheet but suits my purposes, very simple. One thing I’ve found useful us to mark all the highlighted cells bright blue initially, for ‘future action’. Each week, I update that week’s column to green (completed) or red (overdue). This gives me good feedback not only about where I need to change the priorities on my current ‘to do’ list, but is a very satisfying display of how much I’ve already done.

I love Excel, postgradpanda. I reckon that seeing the blue change to green would be very satisfying.

Thanks for this.

[…] https://theresearchwhisperer.wordpress.com/2011/09/13/gantt-chart/ […]

Thanks for this. It helped me alot for doing our work schedule in research for short allotted time.

Ohh Thank God Jonathan for that!! you have no idea how much you saved my life.. I was having a real hard time planning my first ever research proposal Loved it alot.. Looking forward for much guidance along the path!!!

Sruti… (From a far far away land.. INDIA)!! 🙂

Thanks, Sruti

Happy to help.

Sruti was right. It’s very helpful to me as well. Saves me a lot of trouble. Keep it up Jonathan.

No worries, Paul

Are you a commercial representative for Ganttic, or did you link to them because you like them? Just wondering.

[…] published a short article about doing research in academia. Some of their articles are mundane (How to make a simple Gantt chart), whereas others are more esoteric (Hashing it over) and heartfelt (Academic […]

[…] out your timeline and your budget. Working up a Gantt chart for your project will force you to think about how long different phases of the project will take. This is important […]

list any six elements that go into the format of a research report?

Hi abukamara

I don’t have a set list. It depends who your audience is, and what sort of report you are writing.

I’m usually helping people to write grant applications, where the format is set by the funding agency. They make it pretty simple, really – they generally tell you exactly what they want.

[…] logframe analysis is well worth reading, while the Research Whisperer explains how to make a simple Gantt chart. And Mind Tools overviews a range of project scheduling tools as does this from MIT. Over at […]

[…] take you three or maybe three-and-a-half years. However, PhDs in my area rarely follow the sort of gantt chart anybody approving funding, ethics clearance or candidature milestones might approve. A tangent I […]

[…] How to make a simple Gantt chart – Jonathan O’Donnell. […]

Jonathan, i suppose that you should try more intuitive service) My experience in project management tells me there are a lot of comlicated tools such as MS Project. After years of searching and trying (Wrike, Liquid Planner, Smartsheet) i start using GanttPRO, especially because of its simplicity and high visibility. So try GanttPRO to facilitate workflow.

[…] O’Donnell, J 2011, How to make a simple Gantt chart, The Research Whisperer, weblog, 13 September, viewed 23 April 2017, < https://theresearchwhisperer.wordpress.com/2011/09/13/gantt-chart/&gt ;. […]

[…] research design is important. Following the steps outlined in O’Donnell’s (2011) blog How to make a simple Gantt Chart, I constructed this graph and a risk matrix to ensure that my time was used efficiently. […]

[…] Other tips on Gantt charts, including how to make one manually: https://theresearchwhisperer.wordpress.com/2011/09/13/gantt-chart […]

Thanks Jonathan! I am a grant writer, and your post is a great reminder that I should probably make a timeline visually appealing, like your hand-made Gantt. I’m going to do it!

I wanted to point out that for a grant funded project (which often has a specified end date by which the money must be spent), I often find myself making a timeline backwards. That is, I start creating the timeline from the specified end date, and then ask myself the questions that Adrian Masters posed: What do I need to do by when? What do I need from others & when? I build back towards the project start date, then jiggle everything until it fits!

BTW, did you know that in your text descriptions of the example timeline, the time is in weeks, but in your Gantt chart the time is in months? I have a feeling that you really meant for these to match….

Like Liked by 2 people

Thanks, Amy

This article has been viewed over 150,000 times, and you are the first person to point out the weeks / months issue. I’ve fixed it now (although it is a bit of a bodge).

I agree with the backwards process, so much so that I wrote a post about it: Work backwards . It is about the grant writing process, but the principle is the same.

This particular instance was one of those rare times when I truly didn’t have an end date, and could work out the actual time the project would take (surprise – it took longer).

I’ve added a bit into the post about working backwards. Thanks for that.

Proofreading touchdown? You just made my day! Thanks for this, and for Research Whisperer in general. I am probably not really your intended audience, but I get a lot of value from all the posts. You-all do good work!

[…] Research Whisperer. (2016). How to Make a Simple Gannt Chart.[online] Available at: https://theresearchwhisperer.wordpress.com/2011/09/13/gantt-chart/ [Accessed 14 Mar. […]

[…] O’Donnell, J 2011, ‘How to make a simple Gantt chart’, The Research Whisperer, 13 September, viewed 13 April 2018, < https://theresearchwhisperer.wordpress.com/2011/09/13/gantt-chart/&gt ;. […]

[…] you know how to make a simple Gantt […]

[…] How to make a simple Gantt chart: This article provides steps on making a Gantt chart (generally, not specific for PhD). […]

[…] “How to Make a Simple Gantt Chart,” by Jonathan O’Donnell on The Research Whisperer […]

[…] analysis of all their blog search terms. His analysis  showed lots of people were looking for how to make a simple Gantt Chart. Jonathan’s excellent analysis left me wondering: what do readers think is ‘high value […]

If your university has the Microsoft suite of programs Viso (I think it is called) is easy to learn the basic functions to make a Gantt and the nice thing is that when you change a date the program moves the bars for you so fewer errors 🙂 winning.

Thanks, Wendy. Good advice.

[…] complex, messy, and not as linear as suggested by the timeline of activities we outline in project Gantt charts. During my doctorate, there were twists and turns as I made decisions around which literature to […]

[…] webinars should I register for? What about grants? Reading groups? Mentoring? How exactly does a research GANTT chart work (or does it)? How can I get research and writing done without sacrificing my entire summer on […]

[…] my various projects. This method was originally inspired by two academic Gantt chart enthusiasts (one, two). However, I found that the traditional way of setting up a gantt chart (with the projects on […]

Leave a comment Cancel reply

This site uses Akismet to reduce spam. Learn how your comment data is processed .

' src=

  • Already have a WordPress.com account? Log in now.
  • Subscribe Subscribed
  • Copy shortlink
  • Report this content
  • View post in Reader
  • Manage subscriptions
  • Collapse this bar
  • How It Works

Our templates enable you to start planning straight away and help you get things done

Research project plan.

Writing and planning a research project such as a dissertation paper, especially for a first-timer can be a real pain in the neck to get started with. So many things to consider, read and write that you just can't see the end of it all. Our advice? Keep calm (as they would say on 9gag) and think of the whole thing as a series of tasks, like in any other project. And this is where we come in. With Tom's Planner you can schedule your dissertation project with just a few clicks, giving you a clear overview of what needs to be done (and when) in smaller, more manageable steps. Not so scary anymore, is it?

Be sure to check out our blog as well, where you'll find lots more useful tips and tricks about writing and scheduling dissertations.

Help With Dissertation Planning

So we have established that that creating a timeline for your research project is essential. Some people make their Gantt chart in Excel, but using Tom's Planner is a lot more flexible and intuitive. Our research project plan example has all the main stages and sub-stages pre-set and grouped in advance for you, all you need to do is insert the actual tasks and set them to the right time and duration. So even if you are doing this for the first time, you will instantly see that it's probably a good idea to get your dissertation proposal approved before reading 14 books on the subject. Good to know, that.

Effortless planning with our research project plan example

Planning a research project such as a dissertation is really simple if you think about it. Unlike in project management, most of the tasks come one after the other, not in the same time, making it a lot easier to see through. On the other hand, most of the tasks need to be performed by none other than yourself, so there's really no one else to control. You can make things even easier by moving the tasks about when needed or adding comments and icons to them. Feel like rewarding yourself after a completed chapter? Add a little cake icon at the end of the box for extra incentive. Yum!

Sharing made easy

Making a good impression on your tutor (so he will accept the proposal you botched together last night) and keeping him happy throughout the process is vital for your success. That's why we made sure that Tom's Planner great for sharing, online or offline. Show him the research project timeline you created in Tom's Planner (watch him get blown away), keep him informed in real time on your progress, wherever you are, or export the schedule to the desired format in case of personal consults. Schedule your dissertation project the easy way: with Tom's Planner. Be sure to check out our blog as well, where you'll find lots more useful tips and tricks about writing and scheduling dissertations.

Examples & Templates:

Join 178,117 customers and have your first gantt chart live today.

Or, sign up with: Google

Creating awesome Gantt charts for your PhD timeline

Featured blog post image for Creating awesome Gantt charts for your PhD timeline

It’s a common scenario: you have never heard about Gantt charts. Then, when writing a PhD application or planning your PhD timeline for the upcoming years, someone suggests: You should include a Gantt chart! No need to worry. Here is all you need to know about Gantt charts for your PhD timeline.

What are Gantt charts?

A Gantt chart is a visual representation of a project schedule and a widely used tool in project management.

Gantt charts are named after Henry Gantt. He lived from 1861-1919 and developed these types of charts as part of his work as a management consultant.

Why are Gantt charts frequently used for PhD timelines?

Gantt charts are frequently used to illustrate PhD timelines because doing a PhD essentially means creating, managing and implementing a project with many components over several years.

Furthermore, Gantt chart PhD timelines allow PhD students to track their progress. They can also help PhD students to stay on track with their work.

You may also like: How to develop an awesome PhD timeline step-by-step

What information is included in Gantt charts for PhD timelines?

Of course, every PhD project is unique. This uniqueness should be reflected in your Gantt chart. For instance, your Gantt chart PhD timeline will look different if you write a PhD based on articles or if you write a monograph .

For a PhD based on published articles, different bars in a Gantt chart PhD timeline could for example represent individual papers. For a monograph, it may be smarter to focus on research stages.

How do you create a Gantt chart for your PhD timeline?

Creating a phd timeline gantt chart in microsoft excel.

However, why go through all the hassle when you can simply download a template? You can use Microsoft’s own free Gantt project planner template and adjust it to your PhD project.

Creating a PhD timeline Gantt chart in Microsoft PowerPoint

Manually creating a PhD timeline Gantt chart in PowerPoint is a bit easier than in Excel. Therefore, I will explain the process here.

A standard bar chart will appear on your slide and a small Excel table with open next to it. The first column in the Excel table is called Categories . You can replace categories with the PhD tasks that you want to display. For instance, Literature Review, Interviews, Transcribing and Analysis. You can add more categories or delete existing ones by removing a row in the small Excel table.

In the example below, I decided to plan PhD tasks for a year. Thus, 1 means January, 2 means February, 3 means March and so forth. The length of tasks is also indicated in months:

One more thing I did was changing the value of the axis, because I want to illustrate the months of a year. Thus, it was a bit weird that the horizontal axis started with 0 and ended with 13 while I needed 1-12 to indicate each month of a year. You can simply change this by clicking on the axis. On the righthand side, Format Axis will appear. Go to Axis Options , Bounds , and enter 1 for Minimum and 12 for Maximum .

Creating a PhD timeline Gantt chart in a Microsoft Word

Looks familiar? Yes! From here, it is basically the same process as editing the bar chart in PowerPoint.

Creating a PhD timeline Gantt chart with an online tool

Phd timeline gantt chart templates, best gantt chart template for phd timelines in microsoft excel.

A great way to create a detailed Gantt chart in Microsoft Excel is by using Microsoft’s free Gantt project planner template . The level of detail and functionality exceeds those of simple, manually created Gantt charts. This makes this type of Gantt chart especially useful to track detailed PhD progress.

Best Gantt chart template for PhD timelines in Microsoft PowerPoint

Best gantt chart template for phd timelines in microsoft word, phd timeline gantt chart examples, gantt chart phd timeline example in microsoft excel, gantt chart phd timeline example in microsoft powerpoint, gantt chart phd timeline example in microsoft word.

Using a weekly Gantt chart template from TemplateLab mentioned above, an example PhD timeline with weekly tasks and objectives could look, for instance, like this:

Master Academia

Get new content delivered directly to your inbox, 10 reasons not to do a master's degree, 9 smart questions to ask a professor about graduate school, related articles, asking for a recommendation letter from a phd supervisor, 24 popular academic phrases to write your abstract (+ real examples), how to benefit from chatgpt as an academic, 10 tips on how to use reference management software smartly and efficiently.

  • Dissertation
  • Dissertation Gantt Chart

Dissertation Gantt Charts

Organize Your Dissertation Tasks Properly with Template.net’s Free Printable Dissertation Gantt Chart Templates. Choose from Professional Document Samples Online that Come with Premade Project Tasks, Details, Bars, Start and End Dates, Length of the Week, and Quarterly Goals that You can Edit to Your Proper Specifications.

Free Dissertation Gantt Chart Template, Printable, Download

Whether for project or postgraduate education degrees, get professionally-written dissertation Gantt charts from Template.net’s free printable Gantt chart templates. Choose from fillable template examples for research proposals, PhD research, dissertation timelines, and project management that come with original content and simple outlines that are easily editable using our document editor tool. All template samples are downloadable for free and printable on any compatible printing devices.

Customize Dissertation Gantt Chart Online for Free and Download

Customize dissertation Gantt chart examples online to your specifications including the plan and timeline by replacing or editing the pre-written content to your own requirements. Choose your Gantt chart template to help your dissertation as a PhD student for a master thesis university requirement, a construction project, marketing plan, or geography dissertation requirement. All templates are downloadable for free using PDF file format.

Frequently Asked Questions

Who uses a dissertation gantt chart.

In most cases, the users of dissertation gantt charts are postgraduate and masters students. However, there are also professionals and companies that utilize such a document, especially for their project management or research activities. 

What details that I should include in my dissertation Gantt chart?

1. Company or student complete name 2. Company or student address 3. Dissertation project or thesis title  4. Deliverables or activities 5. Timeline 6. Remarks  

What are the advantages of utilizing a dissertation Gantt chart?

1. Provides better communication among team members 2. Provides clarity of the goals and objectives 3. Guides users to the right timeline of the deliverables  

Who is the inventor of the Gantt chart?

Henry Laurence Gantt invented the gantt chart, and it is considered one of the innovative techniques in project management during the 1920s. 

How do you prepare a dissertation?

1. Create a dissertation gantt chart 2. Set your goals and objectives 3. Research your assigned topic 4. Brainstorm with team members 5. Present your dissertation   

Get Access to World's largest Template Library & Tools

  • Access to 1 Million+ Templates & Tools
  • Unlimited access to Design & Documents AI editors
  • Professionally Made Content and Beautifully Designed
  • Instant Download & 100% Customizable

Get your demo today

thesis gantt chart example

Creating a Gantt Chart for Your Research Project Proposal

thesis gantt chart example

Crafting a successful research proposal demands careful planning. However, managing intricate projects with numerous tasks and deadlines can be challenging.

This is where the Gantt charts come into play. These powerful project management techniques offer a visual roadmap for your research proposal, transforming your intricate plan into a clear and concise document. By incorporating a Gantt chart, you not only streamline the planning process for yourself but also strengthen your proposal by demonstrating a meticulously structured and achievable project.

Let's explore the power of the Gantt chart for crafting robust research proposals and a step-by-step guide on how to create one. 

Understanding Gantt Charts and their Application in Research Proposals

Gantt charts , developed by Henry Gantt, an American engineer and project management consultant, are powerful visual tools for project management. They represent project tasks as horizontal bars on a timeline, showing their duration and dependencies. This simple format provides a comprehensive overview of your research proposal development process.

In research proposals, Gantt charts are invaluable because they:

Visualize the Project Lifecycle: Understand the sequential steps involved, from literature review to data analysis and final edits.

Manage Task Dependencies: Identify tasks reliant on others' completion (e.g., data collection after finalizing research methodology).

Optimize Resource Allocation: Allocate essential resources, like software or equipment, to specific tasks within the timeline.

Crafting a Gantt Chart with Rework

Now that you understand the core functionality of Gantt charts, let's explore how to create one specifically for your research proposal. Here, we'll leverage the features of Rework.com , a comprehensive project management platform that streamlines the process.

Rework transcends the limitations of basic Gantt charts, offering functionalities that empower a more streamlined research proposal creation process. Here's how it empowers you:

Seamless Integration:  Rework seamlessly integrates task management, workflow design, and progress tracking – all crucial aspects of building a strong research proposal.

Intuitive Interface:  No technical expertise is required! Rework's user-friendly interface allows you to create and customize Gantt charts effortlessly.

Real-Time Collaboration:  Facilitate effective teamwork and communication among your research team directly within the platform.

Streamlined Workflows:  Design clear and concise workflows for each research stage, outlining tasks, deadlines, and responsible team members.

To showcase the power of Rework, let's take a brief look at what a research proposal Gantt chart might look like on the platform.

Frame 17193

Each stage would then be broken down into specific tasks, with clear deadlines and assigned team members.

This level of organization and transparency not only strengthens your proposal but also paves the way for a smooth and efficient research journey.

Step-by-Step Guide: Constructing Your Research Proposal Gantt Chart

Having grasped the power of Gantt charts and the functionalities offered by Rework.com, let's embark on the exciting journey of building your research proposal Gantt chart! Here's a step-by-step guide to navigate the process:

1. Define Your Research Goals

This initial step lays the foundation for your entire project. Clearly outline your research topic, objectives, and desired outcomes. Having a well-defined objective will guide you in structuring the subsequent stages.

2. Break Down the Project into Stages

Identify the key stages involved in completing your research, such as literature review, data collection, data analysis, and proposal writing.

3. List Tasks Within Each Stage

Now, delve deeper into each research stage and meticulously list all the specific tasks that need to be completed. For instance, the "literature review" stage might involve tasks like identifying relevant academic databases, searching for articles, and summarizing key findings.

4. Estimate Task Durations

Allocate estimated timeframes for completing each individual task within your research stages. Consider factors like the complexity of the task and the resources available.

5. Identify Task Dependencies

Analyze the sequence of your tasks and pinpoint any dependencies. Remember the data analysis example? It can't begin until the data collection stage is complete. Mapping these dependencies in your Gantt chart ensures a smooth and logical workflow.

6. Utilize Rework's Features

Leverage the user-friendly interface of Rework to effortlessly create your Gantt chart. Input your research stages, tasks, and estimated durations. Rework will translate this information into a clear visual representation of your project timeline.

7. Assign Team Members

If you're working with a team, utilize Rework's functionalities to assign specific tasks to individual team members. This promotes accountability and ensures everyone is on the same page.

8. Track Progress & Make Adjustments

Monitor progress within Rework, identify any potential roadblocks that might arise, and be prepared to adjust your plan as needed. The flexibility of Rework allows you to adapt your Gantt chart to maintain optimal project flow.

By following these steps and utilizing Rework’s capabilities, you'll craft a robust research proposal Gantt chart. This visual roadmap not only streamlines your research journey but also presents a structured plan to potential funders or reviewers, increasing your proposal's success rate.

Advanced Techniques for Optimizing Your Research Proposal Gantt Chart

To elevate your Gantt chart's effectiveness, consider these advanced strategies:

Conditional Formatting:  Implement conditional formatting within your Rework Gantt chart. This functionality allows you to utilize color coding to visually distinguish completed tasks from those nearing deadlines or overdue.

Task Annotations:  Move beyond simple task listings – enrich them with context for increased clarity and professionalism. Utilize Rework's functionalities to add detailed annotations directly within your Gantt chart for each task. These annotations can incorporate specific instructions, relevant resources, or crucial reminders for team members.

Rework Reporting:  Rework extends beyond Gantt chart creation; it empowers you to analyze project progress with robust reporting tools. Generate comprehensive reports that offer valuable insights into task completion rates, resource allocation, and overall project health. By identifying areas needing improvement or potential roadblocks early on, you can proactively adjust your plan and optimize research execution.

Crafting a compelling research proposal is crucial, but it doesn't have to be overwhelming. With Rework's intuitive interface and powerful features, creating a professional Gantt chart tailored to your proposal is straightforward. By leveraging Gantt charts, you'll showcase a well-structured and achievable project, increasing your proposal's impact and securing funding. Ready to streamline your research journey? Start building your Gantt chart with Rework today!

thesis gantt chart example

Cut costs with Rework. Do more with less.

thesis gantt chart example

Logo

How to Create and Use a Gantt Chart for PhD Studies

Gantt chart

A Gantt chart is a common tool used in the project management field. It is used for schedule planning of a project and its tasks and activities. It shows the tasks, their start and end dates, and the duration needed to complete them.

A PhD is a project and may last from as few as three years to as long as six years depending on the university and department a student is enrolled in.

In order to successfully complete a PhD program, one needs to plan when each of the tasks will be completed from the word go. A Gantt chart is very useful in doing this.

A PhD student can create one comprehensive Gantt chart or several smaller Gantt charts for each of the major deliverables.

This article discusses a Gantt chart for a general PhD program that has both coursework and dissertation components.

Benefits of a Gantt chart for planning PhD studies

Steps involved in creating a gantt chart for phd studies, how to effectively use the phd gantt chart, final thoughts on the phd gantt chart.

Creating a Gantt chart at the beginning of PhD studies has the following benefits:

  • It is easy to create. A student can use the traditional pen-and-paper method or existing digital tools or softwares to create a Gantt chart.
  • It is easy to read. The visual presentation of the Gantt chart makes it easy for the student to read and know what is expected of him at any point in time.
  • A Gantt chart makes it easy to monitor progress of PhD studies. The user can choose to use different colors for tasks that have already been completed, tasks that are close to completion, and tasks that require more time and effort to complete.
  • It forms the basis for monthly, weekly, and daily planning of the PhD studies. Depending on how detailed a student wants to go in terms of planning, the Gantt chart comes in handy when writing out the monthly, weekly and even daily plans.

Step 1: List all the deliverables expected of your PhD program. In this example, the PhD program has the following requirements:

  • Coursework, divided into 4 modules each lasting 2 weeks. All 4 modules need to be completed within the first year of study.
  • A comprehensive written exam at the end of the fourth module.
  • An oral exam once a student passes the written exam.
  • Submission of a concept note.
  • Submission of a research proposal once a student passes the oral exam.
  • Writing a business management case study.
  • Three journal papers.
  • At least two conference papers.
  • A dissertation.

Step 2: For each of the requirements listed above, note the start and end dates. For the above example, the PhD program lasts a minimum of 3 years and a maximum of 6 years. Assuming the minimum of 3 years (beginning January 2021), the activities’ start and end dates are as follows:

Year of studyTasks/activitiesStart and end dates
Year 1Module 1January 2021
Module 2April 2021
Module 3July 2021
Module 4October 2021
Concept noteJune 2021
Comprehensive examNovember 2021
Year 2Proposal defenseMarch 2022
Business management case studyApril – June 2022
Journal article 1 submitted to a journalJune 2022
Data collection and cleaning for dissertationJuly – September 2022
Data analysisOctober – November 2022
First conference paper presentedNovember 2022
First draft submittedDecember 2022
Year 3Second conference paper presentedMarch 2023
Two journal articles submitted to journalsMay 2023
Revision and finalization of manuscriptJanuary-October 2023
PhD vivaNovember 2023

Step 3: Using the above information, create the Gantt chart using Microsoft Word, Powerpoint or Excel.

The following are useful resources for creating a Gantt chart using:

  • Microsoft Powerpoint: https://www.youtube.com/watch?v=wp0vr6OkW8Y
  • Microsoft Excel: https://www.youtube.com/watch?v=00s5efQWrgU&t=10s
  • Microsoft Word: https://www.youtube.com/watch?v=F90RdA5X4G0

The Gantt chart created from the above data is shown below. The chart was created using Microsoft Powerpoint.

PhD Gantt chart

Step 4: Once the Gantt chart is complete, print it out and hang it on the wall of your study room/area. This serves as a constant reminder of the tasks that need to be done at any point in time, as well as of the progress that has been made so far.

The greatest strength in using the Gantt chart for PhD studies lies in its ability to help one plan ahead. Using the Gantt chart above as an example, the user can plan as follows:

  • At the beginning of every month, look at what is required of you. For instance, the student above needs to complete module one of the coursework and at the same time start working on proposal writing.

The student can plan for module one in advance by going through the course structure and expected readings, and reading in advance before the start of the module so that he is able to follow and understand what is being taught. If there are pre- and post-module exams, the student can also prepare for them in advance.

Preliminary tasks for proposal writing can include: discussing your proposed topic with your supervisor, and searching for and quick review of literature to identify the gap that your topic will be addressing. All these can be done in the first month before the actual proposal writing starts.

  • The Gantt chart can help you identify the skills that are required for the successful completion of your dissertation. For instance, the student above is expected to write a Business Management case study by June of year 2.

If the student does not have case study writing skills, he can start looking for courses that teach case study writing and complete them way before the deadline for the case study. Same case for skills such as preparing and writing a journal paper, writing a conference paper, data analysis using softwares such as Stata, SPSS, NVivo etc.

  • The Gantt chart can help you plan for academic-related events such as conferences.

In the example provided above, the student is expected to attend two scientific conferences (in November of year 2 and March of year 3) and make presentations.

The student can start looking for conferences related to his field that are held during the proposed times and mark the key dates and requirements of the conferences (for instance, abstract submission deadlines, abstract submission guidelines, registration deadlines etc).

  • The Gantt chart can help you create monthly and weekly plans for longer tasks such as proposal writing.

In the above sample Gantt chart, proposal writing and defense spans a period of 15 months. By March of the second year, the student is expected to defend his proposal. This may seem like such a long period of time but in reality it is not. This is because it is not the only task that the student will undertake during this period. As a result, it is easier to focus on the tasks at hand and forget about the tasks that seem to have adequate time.

Proposal writing is a daunting task and requires constant reading and updating. To ensure that the student submits his proposal in time, he can create monthly and weekly plans for the task. An example of monthly planning for the proposal writing is provided in the table below:

MonthTasks
Month 1 – 3Literature search and review
Month 4Write chapter 1
Month 5Share chapter 1 with supervisor for review
Month 6Address comments
Month 7 – 8 Write chapter 2
Month 9 Share chapter 2 with supervisor for review
Month 10 Address comments
Month 11 – 12Write chapter 3
Month 13Share chapter 3 with supervisor for review
Month 14 Address comments and finalize the proposal
Month 15Defend your proposal

The monthly plan is based on assumptions, for instance, that the supervisor will review the document within the scheduled timeframe. This may or may not hold, depending on the supervisor.

It is therefore important to allow ample time for such factors that are out of your own control in order to ensure that the task is completed by the deadline.

The monthly plans can further be broken down into weekly (and even daily) plans, for instance:

  • Number of papers to read per week (day).
  • Number of words to write per week (day).
  • How many citations and bibliographies to insert (update) every week (day).
  • Number of additional articles to search and add to your library each week etc.

Each of these tasks contributes to the overall proposal writing and make the task completion easier and faster than waiting for the last few months to do it all at once.

A PhD is a medium- to long-term project depending on how long it takes to finish. It therefore requires effective and careful planning from the start of the program to ensure that each deliverable is completed within the stipulated time. The Gantt chart is an easy-to-create, and easy-to-use planning tool that can be used by all PhD students. Not only does it save the student time but it also gives him peace of mind knowing the progress of each and every task required.

Grace Njeri-Otieno

Grace Njeri-Otieno is a Kenyan, a wife, a mom, and currently a PhD student, among many other balls she juggles. She holds a Bachelors' and Masters' degrees in Economics and has more than 7 years' experience with an INGO. She was inspired to start this site so as to share the lessons learned throughout her PhD journey with other PhD students. Her vision for this site is "to become a go-to resource center for PhD students in all their spheres of learning."

Recent Content

SPSS Tutorial #12: Partial Correlation Analysis in SPSS

Partial correlation is almost similar to Pearson product-moment correlation only that it accounts for the influence of another variable, which is thought to be correlated with the two variables of...

SPSS Tutorial #11: Correlation Analysis in SPSS

In this post, I discuss what correlation is, the two most common types of correlation statistics used (Pearson and Spearman), and how to conduct correlation analysis in SPSS. What is correlation...

Gantt Chart Templates for Research Project Proposals

Are you a project manager with an upcoming research proposal to tackle? If so, there's no doubt that constructing a Gantt chart is essential for your success. Not only do they provide visibility into the timeline of any project, they also offer insights into resources and dependencies needed to achieve goals on time. We know how challenging it can be to create this type of complex chart manually, which is why we've compiled a list of our favorite Gantt charts templates specifically designed for research projects! Read on to learn more about each template and how incorporating them into your workflow will benefit you or your team.

Project Roadmap Gantt Chart Template

thesis gantt chart example

The Project Roadmap Gantt Chart Template by ClickUp is a must-have for any research proposal. This simple, clear template allows you to map out the entire project from start to finish in an easy-to-follow format. With this template, it's easy to visualize tasks and deadlines, resources required and dependencies between tasks. Plus, with its built-in integration with Google Sheets, you can easily and quickly share your project timeline with other stakeholders.

Try Template

Business plan gantt chart template.

thesis gantt chart example

If you're creating a research project proposal for a business, the Business Plan Gantt Chart Template by ClickUp is the perfect tool. This professional-looking template provides a visual representation of your timeline and includes key milestones to help plan your proposal. Not only can you track progress at each stage of the process, but it also allows you to easily adjust timelines if deadlines shift or resources become unavailable. It's the perfect solution for a business project proposal plan!

Project Deliverables Gantt Chart Template

thesis gantt chart example

Don't let your research proposal slip through the cracks! The Project Deliverables Gantt Chart Template by ClickUp is the perfect tool for managing deadlines and tasks associated with any project. This template helps you track progress at each stage of the process, ensuring that all deliverables are met on time and within budget. Plus, its intuitive design allows you to quickly make changes as needed, without sacrificing accuracy. Make sure your research project is a success with the Project Deliverables Gantt Chart Template!

Waterfall Project Management Proposal Gantt Chart Template

thesis gantt chart example

The Waterfall Project Management Proposal Gantt Chart Template by ClickUp is the perfect tool for any project manager. This template is specifically designed to help you manage complex tasks in a sequential manner, so that each task is completed one-by-one without any overlap. With this template, it's easy to plan out the timeline of the project, as well as tasks and resources needed throughout the process. Make sure your research proposal is a success with this template!

Construction Management Plan Gantt Chart Template

thesis gantt chart example

The Construction Management Plan Gantt Chart Template by ClickUp is the perfect tool for managing large-scale construction projects. This template helps you keep track of all tasks, resources and deadlines associated with a project from start to finish. Plus, its intuitive design makes it easy to adjust timelines as needed without sacrificing accuracy or detail. Make sure to present this during your next project proposal, to ensure success!

Related Templates

  • Project Proposal Whiteboard Template
  • Gantt Proposal Template
  • Creative Agency Proposal Template
  • Campaign Proposal Template
  • Marketing Proposal Template

One app to replace them all

24/7 support

Weekly updates

Secure and compliant

99.9% uptime

  • Affiliate & Referrals
  • Product Roadmap
  • On-Demand Demo
  • ClickUp University
  • Consultants
  • Gantt Chart
  • Native Time Tracking
  • Automations
  • Integrations
  • Kanban Board
  • vs Airtable
  • vs Basecamp
  • vs MS Project
  • vs Smartsheet
  • Software Team Hub
  • Activity Diagram (UML)
  • Amazon Web Services
  • Android Mockups
  • Block Diagram
  • Business Process Management
  • Chemical Chart
  • Cisco Network Diagram
  • Class Diagram (UML)
  • Collaboration Diagram (UML)
  • Compare & Contrast Diagram
  • Component Diagram (UML)
  • Concept Diagram
  • Cycle Diagram
  • Data Flow Diagram
  • Data Flow Diagrams (YC)
  • Database Diagram
  • Deployment Diagram (UML)
  • Entity Relationship Diagram
  • Family Tree
  • Fishbone / Ishikawa Diagram
  • Gantt Chart
  • Infographics
  • iOS Mockups
  • Network Diagram
  • Object Diagram (UML)
  • Object Process Model
  • Organizational Chart
  • Sequence Diagram (UML)
  • Spider Diagram
  • State Chart Diagram (UML)
  • Story Board
  • SWOT Diagram
  • TQM - Total Quality Management
  • Use Case Diagram (UML)
  • Value Stream Mapping
  • Venn Diagram
  • Web Mockups
  • Work Breakdown Structure

Gantt Chart for Thesis

exit full-screen

You can easily edit this template using Creately. You can export it in multiple formats like JPEG, PNG and SVG and easily add it to Word documents, Powerpoint (PPT) presentations, Excel or any other documents. You can export it as a PDF for high-quality printouts.

  • Flowchart Templates
  • Org Chart Templates
  • Concept Map Templates
  • Mind Mapping Templates
  • WBS Templates
  • Family Tree Templates
  • VSM Templates
  • Data Flow Diagram Templates
  • Network Diagram Templates
  • SWOT Analysis Templates
  • Genogram Templates
  • Activity Diagram Templates
  • Amazon Web Services Templates
  • Android Mockups Templates
  • Block Diagram Templates
  • Business Process Management Templates
  • Chemical Chart Templates
  • Cisco Network Diagram Templates
  • Class Diagram Templates
  • Collaboration Diagram Templates
  • Compare & Contrast Diagram Templates
  • Component Diagram Templates
  • Concept Diagram Templates
  • Cycle Diagram Templates
  • Data Flow Diagrams(YC) Templates
  • Database Diagram Templates
  • Deployment Diagram Templates
  • Entity Relationship Diagram Templates
  • Fishbone Diagram Templates
  • Gantt Chart Templates
  • Infographic Templates
  • iOS Mockup Templates
  • KWL Chart Templates
  • Logic Gate Templates
  • Mind Map Templates
  • Object Diagram Templates
  • Object Process Model Templates
  • Organizational Chart Templates
  • Other Templates
  • PERT Chart Templates
  • Sequence Diagram Templates
  • Site Map Templates
  • Spider Diagram Templates
  • State Chart Diagram Templates
  • Story Board Templates
  • SWOT Diagram Templates
  • T Chart Templates
  • TQM - Total Quality Management Templates
  • UI Mockup Templates
  • Use Case Diagram Templates
  • Value Stream Mapping Templates
  • Venn Diagram Templates
  • Web Mockup Templates
  • Y Chart Templates

Related Templates

Gantt Chart Starter Template

We use essential cookies to make Venngage work. By clicking “Accept All Cookies”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts.

Manage Cookies

Cookies and similar technologies collect certain information about how you’re using our website. Some of them are essential, and without them you wouldn’t be able to use Venngage. But others are optional, and you get to choose whether we use them or not.

Strictly Necessary Cookies

These cookies are always on, as they’re essential for making Venngage work, and making it safe. Without these cookies, services you’ve asked for can’t be provided.

Show cookie providers

  • Google Login

Functionality Cookies

These cookies help us provide enhanced functionality and personalisation, and remember your settings. They may be set by us or by third party providers.

Performance Cookies

These cookies help us analyze how many people are using Venngage, where they come from and how they're using it. If you opt out of these cookies, we can’t get feedback to make Venngage better for you and all our users.

  • Google Analytics

Targeting Cookies

These cookies are set by our advertising partners to track your activity and show you relevant Venngage ads on other sites as you browse the internet.

  • Google Tag Manager
  • Infographics
  • Daily Infographics
  • Popular Templates
  • Accessibility
  • Graphic Design
  • Graphs and Charts
  • Data Visualization
  • Human Resources
  • Beginner Guides

Blog Graphic Design 11 Gantt Chart Examples For Project Management

11 Gantt Chart Examples For Project Management

Written by: Bronwyn Kienapple May 10, 2023

gantt chart example

Slack pings, client emails, subcontractor texts… it’s enough to drive anyone crazy. Stop the communication madness and make a Gantt chart .

A Gantt chart lets you communicate your project timeline visually in an easy-to-understand way. Everyone’s in the loop, so you can get work done faster and easier.

Want to see Gantt chart examples, plus get tips on how to create professional Gantt charts that are professional, attractive and simple to understand?

Stick around or check out our Gantt chart templates to start customizing right away.

Click to jump ahead :

  • What is a Gantt Chart?

10 Gantt chart examples 

Why is a gantt chart important, benefits of using a gantt chart, what are the parts of a gantt chart, how to make a gantt chart, what is a gantt chart.

A Gantt chart is a timeline of a project. The top of the chart shows the time frame and the left side of the chart lists the project activities.

Here’s a Gantt chart example:

Daily Project Status Gantt Chart Template

Each activity listed on the left-hand side of a Gantt chart has a colored bar next to it.

The position and length of that bar depends on the activity’s timeline and duration: when it starts and when it ends.

  • For example, in the daily project status Gantt chart above, Activity 1 (Task 1) will take place from March 3 to 7 and then from March 10 to 13. The due date is Thursday of that week. Each week is color coded.

Here’s another example:

Simple Weekly Project Gantt Chart Template

In short, a Gantt chart shows:

  • What tasks need to be done to complete the project
  • When these tasks need to be done

Now that you know what a Gantt chart is, let’s look at a few examples to better understand its usability and versatility.

1. Gantt charts for project management

Retro Daily Project Gantt Chart Template

Gantt charts can be a helpful visual to include in project management plans .

Like the previous example, this retro daily project Gantt chart example breaks down project activities day by day.

It also breaks down who’s responsible for what project activity.

  • Sonya J. is responsible for it from September 3 to 14 (two weeks).
  • Amir K. is responsible for it from September 17 to 21 (one week). Julia F. is in charge of Task 1/Activity 1 from September 17 to October 2. Her red bar shows that the due date is Wednesday.

The magic of a Gantt chart is that it lets you set the order in which tasks should be completed.

And since Gantt charts are in an easy-to-understand timeline format, the task order is crystal clear.

Your team and/or clients won’t need to ask you again and again when Mark is supposed to be working on link building. Phew .

Project management: simplified.

This template would work especially well for consultants , as the client can get a visual representation of the team working on their project.

Putting faces to the names creates confidence in the client and helps build your reputation.

Pro Tip : Use Venngage’s collaboration features to add team members (like your client) to your account and share your Gantt chart seamlessly. Or better yet, edit and customize your gantt charts with your team in real time with our new real-time collaboration feature!

venngage collaboration feature

Get feedback and approvals faster within one channel, without having to juggle Slack messages, emails, or G Suite comments.

Corporate Weekly Project Gantt Chart Template

This corporate weekly project Gantt chart example is more traditional than the previous example. The focus is on the activities and their types, not the individual people.

The types of activities, such as engineering or marketing, are color coded.

  • For example, Task 3/Activity 1 is a marketing activity that will take place from the middle of week 3 to the middle of week 5. Julia K. is responsible for this activity.

Project Schedule Gantt Chart Template

This futuristic-looking Gantt chart example is perfect for teams who operate on the sprint system .

The template is divided into two-week sprints, but you can change this to a one week sprint (or longer) as needed.

The left hand side is divided by team and further divided by activity.

  • For example, the engineering team will do planning from the beginning of week 3 to the end of week 5.
Pro Tip : When you’ve finished editing your Gantt chart in Venngage, click “Share” in the top right corner of the editor to email or get a link to your design.

venngage share feature

Or click “Download” to download a PDF or PNG file to your hard drive (Premium and Business plans only).

Add your Gantt chart to your weekly team meeting presentation . Consultants can add them to their proposals or work plan templates  or integrate them into their project management tool .

2. Gantt Charts for Construction

Construction projects can suffer from “too many cooks in the kitchen” syndrome, making it really hard to meet deadlines.

Gantt charts are a great way to keep construction projects on schedule and make sure clients, crew members and subcontractors are in the loop.

Dark Home Construction Project Gantt Chart Template

This construction project Gantt chart example will make sure everyone’s on the same page. The chart’s simple format makes it easy to see what activity is due when .

You can edit the Gantt chart as the project progresses.

  • For example, if an activity is taking longer than it should, extend the bar’s length and make that section red. That way, everyone is instantly aware of overtime and potential project delays.

Light Home Construction Project Gantt Chart Template

This construction project Gantt chart example is almost the same format as the previous one, but the dots represent two day intervals.

  • For example, demolition will run from Friday of week 1 to Friday of week 2 (six days).
Pro Tip : Venngage’s My Brand Kit tool lets you apply your brand colors to your Gantt chart template with one click. My Brand Kit also lets you include your logo and apply brand fonts.

For example, in the above template, using My Brand Kit would change the blue, yellow and green background color scheme to your brand’s color scheme. You can then click “shuffle” to cycle through the color combination options.

3. Gantt Chart Example for Project Proposals

New product in the works? Use this dark new product project Gantt chart example.

Product Project Gantt Chart Template

The far left hand column maps out the activities, while the far right column lists what department is responsible for each activity.

Product development typically involves multiple departments or teams of people. There may be no one project leader, or only multiple managers, on multiple teams.

A Gantt chart is the perfect way to manage tasks between multiple teams as all the information is in one place, in a crystal-clear format.

It eliminates confusion about dependencies i.e. who needs to finish what before another team can begin their task.

Pro Tip : You can also include the chart in your business report or presentation .  Download your finished Gantt chart as a PNG file (Premium and Business plans only). Choose a presentation template from our library. Once you’re in the editor, click the “Image Upload” tab to upload the Gantt chart and add it to your slides.

4. Gantt Chart Example for Business Plans

PowerPoint Gantt Chart

A business plan tends to contain a lot of information and can quickly become overwhelming to potential investors.

Visualizing schedules, research or data will help break up all the text and quickly communicate key deliverables.

Investors need to see that you have a concrete plan in place that will let you achieve your revenue goals. 

One strategy is to use a Gantt chart to visualize your business plan’s growth strategy or marketing plan .

Use the Gantt chart example above to plot your business strategy and major milestones. Edit the time frame on the bottom to plot out stages by quarter–over several years, if you like.

You can also include this Gantt chart in your project plan .

5. Gantt Chart Example for Consultants

Consultant Project Gantt Chart Template

Your client’s hired you to help them achieve their goals. But, let’s say they’re a new client and they need a little more reassurance that you, the consultant, is on top of things.

Show your client that you have a workable roadmap to success with a Gantt chart.

Edit the above Gantt chart example and divide tasks–between your team, any subcontractors and your client’s team.

Refer back to the chart during your weekly calls with the client to make sure you’re both on the same page.

If you’re overwhelmed by admin work, check out our job proposal templates , business proposal templates and consulting report templates and get important documents out the door a lot faster.

Find a hard time creating business proposals fast? Read our in-depth business proposal guide to whip up proposals quickly. 

They’ll also look plenty better than those Word documents you usually churn out!

Pro Tip : Love your Gantt chart’s layout and want to use it again for other consulting projects? Save it as a template in Venngage. That way, you can reuse it whenever you need to make a Gantt chart for another client.

Gantt charts are important because they make scheduling, planning and executing on projects easier. They also help a lot with general time management .

Projects often involve multiple stakeholders, activities and deadlines. Gantt charts visualize all these factors so that project managers and their teams can quickly understand who needs to do what and when .

This will help make sure each deliverable is completed on time.

Which in turn will prevent a snowball effect of missed deadlines, causing the  project price to go up and the completion date to be pushed back.

And no one wants that.

The benefits of a Gantt chart include:

  • Scheduling and planning projects and tasks
  • Plan work in sprints
  • Visualizing how projects and tasks evolve over time
  • Collaborate with your team
  • Comparing planned versus actual timelines

Gantt charts are incredibly versatile — they’re useful for multiple roles, such as:

  • Project managers
  • Marketing managers
  • Team leaders
  • Operations managers
  • Consultants

Gantt charts aren’t industry-specific, either. They’re a critical tool for anyone managing a long-term project that has lots of tasks and a complex schedule and that requires collaboration.

  • For example, the Gantt chart example below can be adapted for any project simply by changing the tasks and milestones:

Detailed Project Gantt Chart Template

Industries that can benefit from Gantt charts include:

  • Construction
  • Manufacturing
  • Product development
  • Engineering
  • Infrastructure
  • Oil and gas
  • Telecommunications
  • Professional services and consultants

Telecommuting has risen 140 percent since 2005, according to Globa l Workplace Analytics .

As this number continues to skyrocket, a Gantt chart becomes even more critical for team management and to effectively plan and track work as a team.

When you first look at a Gantt chart, it might seem overwhelming.

What do the bars or lines mean? How do they relate to the x and y axes?

But, on second glance you’ll see that the beauty of a Gantt chart is actually in its simplicity.

A Gantt chart only has three main parts:

  • Activities and/or tasks (left axis)
  • Milestones (top or bottom axis)
  • Activity and/or task bars

Take a look at this simple Gantt chart example:

Simple Weekly Project Gantt Chart Template

Not intimidating at all.

  • Tasks on the left axis
  • Milestones on the bottom axis
  • And bars that show when each task should begin and end

Of course, more complex projects, such as the construction of large urban infrastructures or complex software engineering services, require more complex Gantt charts.

The Gantt chart example below takes things a step further by dividing activities into smaller tasks.

  • For example, “Planning” is divided into: needs assessment, project agreement and site map.

This Gantt chart also lists (on the right) who’s responsible for each task.

The good news is that you can now create a Gantt chart with Venngage in five steps:

1. Choose a Template

Choices, choices. Open our Gantt chart templates gallery .

Then, select the template for you by:

  • Ex. Dark Home Construction Project Gantt Chart Template
  • Ex. Dark New Product Project Gantt Chart Template
  • Corporate Weekly Project Gantt Chart
  • Ex. Detailed Project Gantt Chart

Hover over the template you like and click “Create.”

2. Lay Out Your Timeline From Left to Right

Start by laying out the timeline of your from left to right, creating divisions by day, week, month, or quarter.

In this Gantt chart template, click the text box you want to edit and start typing.

venngage edit text feature for gantt chart

Or delete the days of the week and add months or quarters, instead.

Made a mistake? You can click “undo” in the top toolbar at any time.

To add a new column to the right, click “Resize” and increase the width of the custom page size. Try adding 200 more pixels and readjust as needed.

venngage resize feature for gantt chart

Then, drag and select all the orange icons to move them to the right at the same time.

Drag to select the entire dates section and click “copy” and move into place. Edit the dates.

venngage tool copy feature for gantt chart

Now, drag to extend the beige bars. Use the “snap to guide” feature to help you align everything perfectly.

venngage tool snap to guide feature for gantt chart

3. Add Tasks From Top to Bottom

Click the tasks and activities to edit the text. Use the top navigation bar to change the font style, size, color etc.

venngage tool add tasks gantt chart feature

If you need to add a new row, follow the same steps for adding a new column as above. Just adjust the height of the page size instead of the width. Then, copy the last row by dragging to select and pressing “copy.”

4. Adjust Each Bar Accordingly

Adjust each bar so it begins at the task’s start date and extend it to the end of the expected task deadline.

Click each bar to move it or drag it. The snap-to-guide feature will help you align the bar with the specific day of the week above.

Copy other bars with the right color and move them into place to extend the timeline of a task.

adjust gantt chart bar size venngage

You can also click the orange circles to assign each task to a different person–in the above Gantt chart template they’re indicated by initials.

5. Brand Your Gantt Chart

Brand your Gantt chart with one click by opening the My Brand Kit tab. Drag your logo into place.

Then, click a “My Brand Colors” palette to apply these colors to the entire template. Click “Shuffle” to scroll through different color combinations. Very cool.

brand your venngage gantt chart

Want a different type of design? Discover even more Gantt chart templates .

Pro Tip : Struggling to customize your Gantt chart just the way you want it? Venngage offers priority support via email, chat and phone and 1-on-1 consultations to Business plan members. Ask our designers for tips on how to present your idea visually — whether in a Gantt chart or a presentation, report, white paper etc.

What’s your number one struggle with managing projects right now? Let us know in the comments below!

You might also enjoy:

20+ Stunning Consulting Proposal Templates That Will Convert Prospects to Clients

20+ Page-Turning White Paper Examples [Design Guide + White Paper Templates]

Discover popular designs

thesis gantt chart example

Infographic maker

thesis gantt chart example

Brochure maker

thesis gantt chart example

White paper online

thesis gantt chart example

Newsletter creator

thesis gantt chart example

Flyer maker

thesis gantt chart example

Timeline maker

thesis gantt chart example

Letterhead maker

thesis gantt chart example

Mind map maker

thesis gantt chart example

Ebook maker

  • Sample Research

FREE 10+ Gantt Chart Research Proposal Samples in PDF

gantt chart research proposal image

According to the book “Mastering the Gantt Chart,” the use of the Gantt chart allowed for real progress and advancement in industrial management in the early 20th century. By using a simple and powerful graphical representation, a specific research or work project can be accomplished easily. In this article, we will discuss beneficial steps of creating a proposal for your Gantt chart  research , plus we have various downloadable proposal templates for you to use. Keep on reading!

Gantt Chart Research Proposal

Free 10+ gantt chart research proposal samples, 1. gantt chart timeline research proposal template, 2. gantt chart research project proposal, 3. sample paper research management proposal, 4. gantt chart research proposal, 5. gantt chart research proposal form, 6. market research proposal gantt chart, 7. gantt chart research plan proposal, 8. master research proposal gantt chart, 9. gantt chart research project proposal, 10. research project gantt chart template, 11. proposal for thesis gantt chart template, what is a gantt chart research proposal, how to create a gantt chart research proposal , 1. define specific goals, and objectives, 2. collect and evaluate data  , 3. explain your methodology and sequence activities, 4. indicate the estimated time, how do you create a gantt chart for a project, how do you write a one page proposal for a research paper, what is an example of a gantt chart, what makes a good gantt chart.

gantt chart timeline research proposal template

Size: 590 KB

gantt chart research project proposal

Size: 992 KB

sample paper research management proposal

Size: 589 KB

gantt chart research proposal

Size: 391 KB

gantt chart research proposal form

Size: 570 KB

market research proposal gantt chart

Size: 497 KB

master research proposal gantt chart

Size: 645 KB

research project gantt chart template

Size: 200 KB

proposal for thesis gantt chart template

A Gantt chart research proposal   is a useful document that comprises main goals, objectives, and methods or strategies established by the researchers in demonstrating the specific timeline and progress, or the essential tasks and time intervals of a particular project.

Being an effective researcher, you need to really learn and apply the significant process and skills, improve your skills, and fully develop a unique end product. In this matter, we suggest that you follow the steps below while freely using one of our templates in this article:

Before anything else, you need to identify the research problem, and define specific goals, and objectives in creating a research proposal for your thesis Gantt chart.  Be inspired by the words said by Henry Davod Thoreau: “If you have built castles in the air, your work need not be lost; that is where they should be. Now put the foundations under them.”  So, establish a solid foundation of your proposal by creating your goals.

The second step that you should do is collecting and evaluating important data for your proposal. The information you collected will help you to gain valuable information on how you can manage and structure your plan properly. Donato Diorio said: “Without a systematic way to start and keep data clean, bad data will happen.” To maintain order and harmony in your work, use some quality research and analysis methods on your data.

Then, you need to explain thoroughly the different kinds of methods and strategies that you are planning to use for your research study . An Indian actor named Ashish Vidyarthi said: “We make life difficult, and then we try to solve it. My methodology is to simplify things and share them with life examples.” Avoid setting up complicated methods but opt for simple yet effective ones. Also, make a clear list of activities that you need to include for your plan, and sequence them in the proper order.

You need to indicate an estimated time for each item or activity on the list of your research proposal. This will show some clarifications for your readers or evaluators to know if you have allocated enough time to finish your proposed research paper. 

To create a Gantt chart, you need to review the scope baseline, and create and sequence activities. Then, estimate your resources and time durations. Later on, you can develop a structured schedule.

Write a catchy title and compelling introduction and a resource review. Describe thoroughly the implementation of your methods. Predict your results. Discuss the possible effect of your results.

An example of a Gantt chart is a bar chart that portrays the beginning and end dates of various elements of a certain project such as resources, milestones, tasks, and dependencies.

A good Gantt chart should have a sufficient time duration or time frames which can be precisely estimated. Include a hierarchical list of goals or work divisions, with tasks and subtasks listed below them.

Therefore, writing a proposal for your Gantt chart research may not be an enjoyable task to you in the first place yet despite the difficulties, you eventually find them to be achievable, inspiring you to perform your best in completing your research work. For planning and scheduling projects, you need to be an expert in using a Gantt chart. So, we recommend that you get a proposal template today to work efficiently on your thesis research project! 

Related Posts

Free 10+ content validity samples & templates in pdf, free 10+ construct validity samples & templates in ms word | pdf, free 10+ code of human research ethics samples & templates in ms word | pdf, free 10+ biography research report samples and templates in pdf, free 10+ system documentation samples & templates in ms word | pdf, free 10+ process document samples & templates in ms word | pdf, free 10+ action research samples & templates in pdf, free 10+ longitudinal research samples & templates in pdf | ms word, free 10+ causal research samples & templates in ms word | pdf, free 10+ client discovery samples & templates in ms word | pdf, free 10+ null hypothesis samples & templates in ms word | pdf, free 9+ product knowledge samples & templates in pdf, free 10+ software documentation samples & templates in ms word | pdf, free 10+ exploratory research samples & templates in pdf | ms word, free 10+ experimental research samples & templates in ms word | pdf, free 10+ organizational knowledge samples & templates in ms word | pdf, free 10+ concurrent validity samples & templates in ms word | pdf, free 10+ resource tracking samples & templates in ms word | pdf, free 4+ clinical case study samples & templates in pdf.

Gantt Chart: The Key to Your Time Management

Regardless of whether you're coordinating a team or organizing your personal life, the Gantt chart is your indispensable tool for the successful implementation of your plans.

thesis gantt chart example

What is a Gantt chart?

What are gantt charts used for, differences between gantt charts and calendar views, advantages and disadvantages of using a gantt chart, what models of gantt charts are there, 5 tips for creating a gantt chart: how to keep an overview, (excel) template for a gantt chart, what tools are available for creating a gantt chart, example: when are gantt charts used, conclusion: efficient project management with gantt charts.

Imagine you're planning to open a cafe. You have to coordinate the renovation of the interior, the ordering of furniture, sourcing suppliers, hiring baristas, and advertising the opening - all within a certain timeframe. Or perhaps you're a student wanting to plan out your thesis. You need to juggle research phases, writing times, revisions, and submission deadlines, all while keeping track of individual tasks. One thing's certain: proper time management is essential.

A Gantt Chart helps you visualize your tasks, identify dependencies, and meet deadlines. With Gantt, you maintain an overview so your projects don't fail. A lack of overview is one of 12 typical reasons why projects fail . Whether you're coordinating a team or organizing your personal life, the Gantt diagram is your essential tool for successful implementation of your projects .

A Gantt chart is a visual representation of tasks, time spans, and dependencies in a project . Named after its inventor, Henry L. Gantt, this chart offers a clear overview of the timeline and scope of different tasks . In a Gantt Chart, tasks are represented as horizontal bars, showing their planned duration. These bars span across a timeline, making it immediately visible when tasks start and finish.

Gantt charts are an extremely versatile tool in project management . They are used to plan, coordinate, and monitor tasks . With a Gantt, you can visually represent when tasks should start and end, how they relate to each other, and what resources are required. These charts enable you to track the progress of a project, allocate resources efficiently, and meet deadlines. Whether in business, construction, IT or even in personal life, Gantt charts are indispensable , for planning and implementing projects successfully.

Team am arbeiten.jpg

Source: unsplash.com

Gantt charts and calendar views are two powerful instruments in the creation of a project plan , each with its own strengths and areas of application. While Gantt charts offer a visually appealing representation of tasks and their timing calendar views provide a clear record of appointments and events.

Gantt charts focus on the visualization of tasks as bars over a timeline , making dependencies and overlaps easily recognizable. In contrast, calendar views offer a daily, weekly, or monthly overview of planned events, which is particularly useful for keeping track of appointments and meetings.

While Gantt charts support deeper project planning with a focus on tasks and their timing coordination, calendar views offer a simpler way to organize and manage appointments.

The use of a Gantt chart offers a variety of advantages for effective project planning . Through the clear visual representation of tasks and their timing, a Gantt chart allows for easy identification of bottlenecks and dependencies .

This contributes to optimizing resource allocation and to meeting deadlines . It promotes clear communication within the team , as all participants have the same overview of project progress.

There are also disadvantages: The creation and updating of complex charts can be time-consuming. Also, Gantt charts can become confusing for particularly large projects if not meticulously planned and organized. Overall, however, the Gantt provides a valuable tool for enhancing the efficiency and organization of projects . With a balanced assessment, teams can optimally utilize the advantages of using a Gantt chart while managing potential challenges.

There are different models of Gantt charts , which can be adapted to different requirements and project scenarios. The traditional Gantt chart shows tasks in bar form along a timeline and visualizes start and end dates as well as duration.

An advanced variant is the resource Gantt chart, which additionally displays the resource assignment for each task, ensuring optimal resource distribution.

Another model is the network scheduling , which focuses on the sequence of activities and their logical dependencies. In the network plan, events and nodes are connected to depict the project flow. For agile projects, the Scrum Gantt chart is suitable, optimizing sprint planning and execution. It visualizes individual sprints and tasks within each sprint.

Each of these models offers unique advantages depending on the project type and complexity. Choosing the right Gantt chart model contributes to optimally support and improve project planning and execution.

Creating an effective Gantt chart requires careful planning and attention to some important aspects.

Here are 5 tips on how to create a Gantt chart:

Define clear project goals : Before you start creating your Gantt chart, you should define clear project goals. Identify the tasks, milestones, and dependencies that are important for your project. This will help you create a clear structure for your chart.

Arrange tasks : List all tasks and activities required for your project. Organize them in the order in which they need to be completed. You can also group tasks into groups or phases to increase clarity.

Set duration and dependencies : Determine the estimated duration and dependencies for each task. This information is essential for representing the schedule realistically and anticipating delays.

Create a Gantt chart : Use a suitable tool to create your Gantt chart. Enter tasks, start and end dates, and dependencies. Use bars to represent the duration of each task and make sure you design the schedule visually appealing and clear.

Update and Monitoring : A Gantt chart is a living document. Make sure to update it regularly to reflect the actual progress of the project. Monitor the project progress and adjust the chart when conditions change. This will allow you and your team to respond to problems early and effectively manage the project schedule.

Using an Excel Gantt chart template is a proven approach to optimize your project planning and tracking. These templates provide a user-friendly method to organize and visualize your tasks, milestones, and schedules.

In Excel, you can easily create a timeline by specifying start and end dates for your tasks. Using bars allows an intuitive representation of task length and overlaps. You can also define dependencies between tasks to ensure the order of activities is correctly considered. The ability to allocate resources and assign responsibilities helps to coordinate the entire project process.

Excel Gantt chart templates are available online and offer a good approach for creating clear project visualizations. However, when projects become more complex, a PM tool is the more efficient solution.

There are a variety of software solutions that can be used to create a Gantt chart. These include . and or privacy-compliant tools like . These tools offer advanced features such as task assignment, resource management, and progress tracking to plan and monitor complex projects more efficiently.

factro Gantt Chart.jpg

Source: factro.de

Gantt charts are versatile tools that can be effectively used in various areas and scenarios. Here are three examples of how Gantt charts can provide an overview of projects:

Event planning and event management: Organizing events requires accurate time scheduling and coordination of different activities. A Gantt chart allows event planners to clearly visualize the sequence of tasks such as booth installation, program preparation, guest registration, and decoration. Dependencies between the tasks can be identified to ensure smooth operations and avoid bottlenecks.

Software development and project management: In the IT industry, Gantt charts are an invaluable tool for planning software projects. Here they can illustrate task distribution, programming, quality assurance, and testing. These charts help in setting milestones, planning development cycles, and meeting deadlines, contributing overall to on-time delivery of software solutions.

Construction projects and civil engineering : Major construction projects require precise time and resource planning to be successfully completed. Gantt charts are used here to organize construction phases such as laying the foundation, building structure, installing facilities, and finishing interiors. The visual representation helps construction companies to keep track of the schedule, identify critical paths, and minimize bottlenecks. These examples illustrate how Gantt charts can be used as powerful tools in various sectors and project contexts to optimize the planning, coordination, and implementation of projects.

Gantt charts have established themselves as indispensable tools in project planning and tracking. Their visual representation of tasks, schedules, and dependencies greatly facilitates the coordination and monitoring of projects.

No matter what industry - from corporate projects to event planning - Gantt charts enable clear communication, optimal resource allocation, and timely action in case of changes. While some challenges persist in updating, the advantages outweigh them, and they remain an optimal tool for efficient project implementation.

Vivien-Jana Gaida

Vivien-Jana Gaida ist Content Marketing Managerin beim Software-Hersteller factro. Vivien recherchiert und schreibt für den factro Blog über aktuelle Tools und Trends. In ihren Artikeln teilt sie Fachwissen über die moderne Arbeitswelt, Digitalisierung, Projektmanagement- und Collaboration-Software.

Product categories mentioned in the article

Projektmanagement-Lösungen unterstützen Nutzer:innen bei der Verwaltung von Teamzielen und langfristigen Projekten sowie...

Examples

Gantt Chart Research Proposal

Proposal maker.

thesis gantt chart example

The #YouOnlyLiveOnce mindset thrives in the spirit of spontaneity and adventure. Although it can be fun, #YOLO will spell disaster outside the party scene. It is a terrible career and life advice that is equivalent to flushing your time and resources down the toilet. Smart and strategic project planning is the spine of every successful academic or business undertaking. Whether you are a student or a professional, you will benefit from mapping out your projects with Gantt charts and other progress-tracking illustrations. We have prepared the following pointers that will help you on your next big move.

21+ Gantt Chart Research Proposal Templates

Gantt charts are a useful productivity apparatus for project management. They are a bar chart derivative for task scheduling and progress tracking. The user plots the activity progress along the y-axis, with respect to the indicated time on the x-axis. The leftmost column contains the list of tasks while the top row displays project dates in uniform intervals. This chart is useful in visualizing the schedule of activities for your research proposals . When you use Gantt charts, you can monitor if your project goals are in sync with the actual work timeline.

1. Restaurant Gantt Chart Template

Restaurant Gantt Chart

  • Google Docs
  • Google Sheets

Size: A4 & US Letter Sizes

You see the potential of a trend in increasing the revenue for your restaurant. How do you convince the management that your plan will work? Other than persuasive and well-researched content, your market research plan should contain a feasible work timetable. A realistic schedule of activities ensures that your proposed project is not just theoretical and that investing in it would not be a waste of resources. A Gantt chart works best for project timelines because it makes the project’s progress easy to monitor and relay. Add this template to your market research proposal!

2. Free Excel Gantt Chart Template

Free Excel Gantt Chart Template 440x570 1

Size: A4 & US Sizes

The early Gantt charts were successful even before computers became mainstream in offices. Back then, you had to draw the charts manually. This means that when there would be revisions to the project proposals , you are required to recreate the entire diagram. The success of Gantt charts would not have survived the rigors of modern workspaces if there was no computer program for them. Fortunately, we have programs like Microsoft Excel and Apple Numbers where we can amend details without scrapping the entire chart. Get this free Gantt chart template now!

3. Free Progress Gantt chart with Events Template

Progress Gantt chart with Events Template 440x570 1

There would be times that our project advisers would need a quick update on the progress of our research study. Give them a fast rundown of the development with this Gantt chart template! It gives a quick overview of the pace of the activities through percentage. It has a simple interface simple and is easy to navigate. You can also use this template when you’re presenting the progress of a specific task and its subtasks. Are you worried that adding a new activity might overlap with your previous assignments? Avoid that with this downloadable template!

4. Free Yearly Project Management Gantt Chart Template

Yearly Project Management Gantt Chart Template 440x570 1

Research, especially when it is an individual project, will challenge a person’s organization and project management competence. You will need to complete one task before you can proceed to another in your methodology . If you lag on one of your tasks, there will be a domino effect, and you will fall behind schedule. Even though some research studies can take a whole year or more, people usually find themselves short of time. Do not fall prey to this by being committing to a realistic schedule. Get started with this yearly Gantt chart template!

5. Free Sales Activity Gantt Chart Template

Free Sales Activity Gantt Chart Template 440x570 1

Instead of just plotting your research activity progress with respect to project dates, you can also monitor how much of the work is done! Although this is a sales activity template, you can use the same format for your research proposal . Each task is listed in the first column, while the percentage measures the amount of work done. With this monitoring format, you can picture the development of your research and the momentum of the activities. Boost your productivity with this free Gantt chart template now!

6. Free Marketing Plan Chart Template

Marketing Plan Chart Template 440x570 1

With this Gantt chart template, make sure that you don’t fall behind your target deadlines again! The layout is specific down to the weeks of the month. You will be able to indicate at which week your research team started and completed the task. Did you hit the time allotted for each activity? The expected duration is placed next to the activity column for reference. You can use this template to present the schedule of events in your research proposal. The best part is that unlike other charts, you can keep updating this timeline during the entire project!

7. Free Basic Gantt Chart Template

Free Basic Gantt Chart Template 440x570 1

The construction of the  Hoover Dam  started in 1931 and finished ahead of schedule. During the planning and construction, engineers referred to Gantt charts to keep track of the progress. Today, the charts are useful in different fields that need progress-tracking and project forecasts. It is helpful in your research proposals because you can define the timeline of your research as well as continually update the document for revisions. It is a reliable organization tool that you shouldn’t be sleeping on. Make use of such convenience in your research proposal with this template!

8. Free Monthly Gantt Chart Template

Free Monthly Gantt Chart Template 440x570 1

Gantt charts are an indispensable tool for project management. It gives you a birds-eye view of the entire research progress. Are you running out of time? Which of the following tasks can you adjust the schedule for? You can refer to it when you need to add or modify the activities. Monitor your progress better from start to end with this editable template! The design looks professional, and it won’t clash with the formality of your document. The landscape orientation lets you include more details into your timetable.

9. Research Proposal Gantt Chart Template

Research Proposal Gantt Chart Template

Size: 35 KB

10. Qualitative Research Proposal Gantt Chart Template

Qualitative Research Proposal Gantt Chart Template1

Size: 42 KB

11. Research Proposal Timeline Gantt Chart Template

Research Proposal Timeline Gantt Chart Template

Size: 38 KB

12. Nursing Research Gantt Chart Template

Nursing Research Gantt Chart Template

Size: 34 KB

13. Marketing Research Gantt Chart Template

Marketing Research Gantt Chart Template

14. Thesis Proposal Gantt Chart Template

Thesis Proposal Gantt Chart Template

Size: 30 KB

15. Sample Proposal Gantt Chart Template

Sample Proposal Gantt Chart Template

Size: 37 KB

16. Medical Research Gantt Chart Template

Medical Research Gantt Chart Template

17. Dissertation Research Gantt Chart Template

Dissertation Research Gantt Chart Template

Size: 43 KB

18. Dissertation Proposal Gantt Chart Template

Dissertation Proposal Gantt Chart Template

19. Business Research Gantt Chart Template

Business Research Gantt Chart Template

Size: 33 KB

20. Ph.D. Plan Gantt Chart

TP Appendix Mikkel Brauer Johnsen 01

Size: 630 KB

Gantt charts are being used in doctoral dissertations as well. The attached PDF file is an example of a research timeline of a Ph.D. candidate. Most Gantt charts are in a landscape format to accommodate more content. The proponent structured his semestral schedule of activities in a monthly-basis. The designation of each main goal with different colors is smart. The chart shows that the proponent performed various activities under different goals per semester. Without a physical map, it is hard to picture the progress of his tasks. Like this Ph.D. candidate, organize your research endeavors with a Gantt chart!

21. Survey Planning Gantt Chart Sample

DPI Research Methods Session 2 Survey Planning Gantt Chart 508 2

Size: 262 KB

Surveys are one of the effective methods of obtaining relevant information to answer queries. Despite its practicality and capacity to provide reliable data, the method isn’t a one-step process. You wouldn’t want to spend your resources on information that isn’t worth its price. You have to make sure that you get the right answers. You have to test the survey design first to a few people. Then there is still data analysis and report of findings. Is this method suitable for your research given the time available? Gain a reliable foresight by including a Gantt chart for your research proposal! Refer to this sample chart for guidance!

22. Task Gantt Chart Template

Gantt Charts 2

Size: 286 KB

A crammed research paper is not a good research paper . In the academe, students are given due dates to fulfill parts or sections of their thesis. Manage your deadlines well by tabulate your tasks and progress. By doing so, you can budget your time and adjust your working pace. Supplement your school hustle with a Gantt chart! It can be as straightforward as this sample, but its rewards on your scholastic performance are priceless!

Twitter

Text prompt

  • Instructive
  • Professional

Generate a proposal for a new school recycling program

Compose a proposal for a school field trip to a science museum.

  • Agile project management
  • Gantt chart

What are Gantt charts?

An overview of Gantt charts and how they can help manage agile projects.

Eddie Meardon

Browse topics

Summary: A Gantt chart is a project management tool that illustrates work completed over a period of time in relation to the time planned for the work. A Gantt chart can include the start and end dates of tasks, milestones, dependencies between tasks, assignees, and more.

In the early part of the 20th century, Henry Gantt created charts that recorded the progress of workers to a task. It allowed supervisors to quickly see if production schedules were behind, ahead, or on track. Gantt charts revolutionized project management, helping to manage large construction projects like the Hoover Dam and the interstate highway network. While Gantt charts were initially written out on pieces of paper, with the rise of computers in the 1980s, Gantt charts became increasingly complex and elaborate. Today, Gantt charts are still one of the most widely used project management tools.

What is a Gantt chart?

A Gantt chart is a project management tool that illustrates work completed over a period of time in relation to the time planned for the work. It typically includes two sections: the left side outlines a list of tasks, while the right side has a timeline with schedule bars that visualize work. The Gantt chart can also include the start and end dates of tasks, milestones, dependencies between tasks, and assignees.

Today, Gantt chart tools are often referred to as roadmap tools. To keep up with the demands of modern software development, roadmap tools like Jira  include features like a collapsible task structure and resource management panels. This helps teams maintain a coherent project strategy despite the iterative nature of the software development process. Jira includes two roadmap tools to create Gantt charts for your projects: Timelines , which creates plans around Jira issues assigned to a team, and Plans , which does the same thing across teams and organizations.

Screenshot of Jira Basic Roadmaps

What is a Gantt chart used for?

Project managers use Gantt charts for three main reasons:

Build and manage a comprehensive project

Gantt charts visualize the building blocks of a project and organize it into smaller, more manageable tasks. The resulting small tasks are scheduled on the Gantt chart's timeline, along with dependencies between tasks, assignees, and milestones.

Determine logistics and task dependencies

Gantt charts can be employed to keep an eye on the logistics of a project. Task dependencies ensure that a new task can only start once another task is completed. If a task is delayed (it happens to the best of us), then dependent issues are automatically rescheduled. This can be especially useful when planning in a multi-team environment.

Monitor progress of a project

As teams log time towards issues in your plan, you can monitor the health of your projects and make adjustments as necessary. Your Gantt chart can include release dates, milestones, or other important metrics to track your project’s progress.

The benefits of using a Gantt chart

There are two main reasons Gantt charts are loved throughout the project management world. They make it easier to create complicated plans, especially those that involve multiple teams and changing deadlines. Gantt charts help teams to plan work around deadlines and properly allocate resources.

Project planners also use Gantt charts to maintain a bird’s eye view of projects. They depict, among other things, the relationship between the start and end dates of tasks, milestones, and dependent tasks. Modern Gantt chart programs, such as Jira with Timelines and Plans, synthesize information and illustrate how choices impact deadlines.

Gantt charts in waterfall vs. agile planning

Whether you like the waterfall or agile methodology , Gantt charts can be a powerful tool for either.

Waterfall and Gantt charts

The waterfall model of project planning follows a linear approach where stakeholder and customer requirements are collected at the beginning of the project. From that, project managers create a sequential project plan, complete with milestones and deadlines. Every piece of the project relies on the completion of preceding tasks. This is favored by teams that focus on process (such as construction or manufacturing) and less on ideation or problem-solving as the steps need to be planned out in advance.

Gantt charts are typically preferred by project managers using waterfall. They determine a project schedule by breaking projects into manageable chunks of work and assigning start and end dates. It’s also helpful in identifying important milestones in your project. Milestones are accomplishments that teams should achieve on or ahead of schedule. They are optional but recommended.

Agile and Gantt charts

On the other hand, the agile model of project planning values flexibility and adaptability. Instead of creating a full timeline with set dates, agile teams break projects into smaller iterations (also known as sprints ). At the beginning of a sprint, a team plans their work against the goals of the project over the course of the next two weeks. Once that sprint is over, the accomplishments and developments from it help to create the plan for the next sprint.

A Gantt chart can show how changing one task has the potential to impact the plan or the product roadmap. For agile teams, this is essential since stakeholder feedback is a large part of the methodology.

How to use Gantt charts

Jira comes with two different roadmapping features, each with a slightly different focus. Jira's  Timelines is designed to track work assigned to a single team while Plans is designed for larger, cross-organization project planning.

Project-specific charts - Jira Timelines

A screenshot of a project specific Gantt chart in Jira Roadmaps | Atlassian Agile Coach

The screenshot above, taken from Timelines, shows a project-specific Gantt chart that is commonly used at the team level or within a single department. The chart shows how the team is tracking toward their goals, and the collapsible work breakdown structure allows project managers to get a bird's eye view on the crucial stories of the project. Jira offers a free project management template which includes Gantt charts.

High-level organization chart - Plans

Timelines offers quick and easy planning that helps teams better manage their dependencies and track progress on the big picture in real-time. These project or team-level roadmaps are useful for team-level planning of large pieces of work.

For planning, managing, and tracking work across multiple teams or even your entire organization, Plans empower teams at scale.

Screenshot of cross-team workflow within Jira Advanced Raodmaps

Programs designed with cross-team workflows offer more advanced tools like capacity management and automatic scheduling features to help create more complex plans. They also offer a variety of view settings to allow you to customize your Gantt chart to highlight a certain aspect of your plan when presenting.

In conclusion...

Modern Gantt chart software like Jira with Timelines and Plans are used by project managers and industry leaders to help organizations meet their goals. Whether planning a complex project or monitoring your company’s progress, Gantt chart tools like these are scalable and equally applicable to the portfolio, large solution, program, and team levels, as per SAFe® guidelines.

Learn more about how Timelines and Plans can help you plan your next project. You can try them out with a free trial of Jira .

Eddie Meardon is a Senior Content Designer for Atlassian's Plans team based in Sydney, Australia.

Learn how to use epics in Jira

Use these step by step instructions to learn how to use and create epics in Jira

What is Agile Product Management?

Product management is an organizational function that aims to maximize the value of a product by optimizing every step of the product lifecycle.

Search for: Search Button

  • How to make a Gantt Chart in Excel

Gantt chart for project management or event scheduling are possible in Excel. Here’s the step-by-step help plus a complete sample worksheet for our subscribers.

Start with a Table

Make a stacked bar chart, add duration series, categories in reverse order, time format / duration, hide unwanted bars with ‘no fill’, sample workbook.

Gantt chart can be widely used in project management for visualizing project schedules. They  break down a project or event into tasks or activities as horizontal bars on a timeline. Each bar signifies a task, its length denoting its duration, and its placement indicating its start and end times within the project’s timeline.  You can easily see the progress and also when tasks overlap or depend on earlier tasks.

Gantt Charts are possible in Excel though you won’t find them among the supplied charts.  We’ll explain how to make a Gantt Chart in Excel then a shortcut for Office Watch subscribers.

We’ll show how to convert a table (above) into a Gantt chart (below) that better shows how the events fit together and how long each lasts.

thesis gantt chart example

In the sample spreadsheet we have the “Start Time” and “Duration of the Activity”. The “End Time” is only for our reference and can be calculated from the Start Time and Duration .

thesis gantt chart example

Select the Event, Start Time and Minutes  and insert a bar chart. Navigate to the “Insert” tab and choose the “Stacked Bar” chart under the 2-D Bar.

thesis gantt chart example

As soon as the chart is inserted, Excel will automatically generate horizontal bars representing each task on the timeline.

thesis gantt chart example

Change the appearance of the chart by right-clicking on the chart and click the “Select data” option.

thesis gantt chart example

The Select Data pop-up will appear. Click the Switch Row/Column options to interchange the way your data is organized. This can sometimes be necessary to ensure your Gantt chart displays the information correctly.

After clicking this button, you may need to adjust other settings or formatting options to fine-tune your Gantt chart according to your project requirements.

thesis gantt chart example

This is how the interim chart should appear:

thesis gantt chart example

Now you can set up the Duration series, right-click on the Gantt chart, choose Select Data from the menu options, then click “Add” and select the Duration series. This will open the “Select Data Source” dialog box.

In the “Select Data Source” dialog box, click on the “Add” button. This will open the “Edit Series” dialog box.

thesis gantt chart example

In the “Edit Series” dialog box, enter the name for your Duration series in the “Series name” field. In the “Series values” field, select the range of cells in your spreadsheet that contain the duration data for your tasks.

Click “OK” to close the “Edit Series” dialog box.

thesis gantt chart example

Similarly, In the Edit option, select the Vertical axis values. The vertical axis is the minutes of the event

thesis gantt chart example

After all that the chart should look like the one below.

thesis gantt chart example

Right-click on the chart, go to Axis Options, and select the “Categories in reverse order” option.

thesis gantt chart example

You have the flexibility to select your preferred Time format under the number formatting.

thesis gantt chart example

Now Format the Axis options with the following inputs to get the desired Time duration:

thesis gantt chart example

The chart now resembles the one below:

thesis gantt chart example

Almost there — the Gantt chart is in place (the orange bars)  but with the additional (blue) bars to be hidden.

Select the blue bars in your Gantt chart and format them by setting the “Fill” option to “No fill” to remove any color. Next, remove the gridlines to declutter the chart. Delete the legends to streamline the visualization. Finally, you can add a chart title for clarity and completion if you feel the need.

Now, your Gantt chart is fully prepared and ready to use.

thesis gantt chart example

Office Watch subscribers can leap ahead by downloading the complete example worksheet.

It’s a standard Excel .XLS file ( no macros) with a complete working table plus chart.  Change the cells highlighted in yellow.

thesis gantt chart example

To quickly make a Gantt chart, just change the labels, start time and durations (the yellow cells) and the chart will change.

Add/delete rows to the table and the chart will adjust accordingly.

This download is available  EXCLUSIVELY to Office Watch subscribers.  The link to this and other special downloads is in each issue of  Office Watch  or  Office for Mere Mortals

Make better Excel Charts by adding graphics or pictures Auto updating your Excel Charts

About this author

' src=

Mayurakshi Mohapatra

Office 2021  - all you need to know . Facts & prices for the new Microsoft Office. Do you need it? Office LTSC is the enterprise licence version of Office 2021.

Office 2024 what's known so far plus educated guesses. Microsoft Office upcoming support end date  checklist.

Latest from Office Watch

  • HUGE news - Excel gets Regular Expression functions
  • Surprise! Microsoft recommends Windows 11
  • Goggles 🥽 emoji in Word, Excel, PowerPoint and Outlook
  • Beware the unexpected when copying an image from Word/Office
  • A $125 Billion lesson in why cloud backups are vital
  • How Word pastes into your document
  • Make monsters and pipes with the Terantopia font
  • Avoid the traps when adding Excel info into a Word document
  • Circle & Sphere calculations in Excel using Pi 𝜋
  • How to list all fonts in a Word document
  • Face with rolling eyes 🙄 emoji in Word, Outlook, Office
  • Glasses 👓 emoji in Word, Excel, PowerPoint and Outlook
  • Calendar extras added to new Outlook
  • Changes to PDFs made by Microsoft Office
  • It's official - Calibri beats Aptos in font poll
  • Vmware Workstation Pro is now free
  • A quiet month of security fixes for Microsoft Office
  • How Mark of the Web stops bad document infections
  • Introducing Reading Coach to enhance Reading Fluency with AI

IMAGES

  1. How to Create and Use a Gantt Chart for PhD Studies

    thesis gantt chart example

  2. Thesis Gantt Chart

    thesis gantt chart example

  3. 1: Gantt Chart of Tasks during this master thesis work

    thesis gantt chart example

  4. Correct Gantt Chart For Master Research Proposal Thesis Project Plan

    thesis gantt chart example

  5. Dissertation Timeline Gantt Chart Template in MS Excel, Google Sheets

    thesis gantt chart example

  6. Dissertation Gantt Chart Xls

    thesis gantt chart example

VIDEO

  1. Perfect Gantt Chart in Excel using PlanExcel

  2. How to Create a Gantt Chart in Tableau

  3. Why gantt charts don't work

  4. Gantt Chart

  5. Gantt Chart Software Project Management

  6. 8.6 Gantt charts (DECISION 1

COMMENTS

  1. Master thesis planning Gantt template

    Select your style for. Master thesis planning. You are a student about to become a postgraduate because you are currently focusing on your master thesis? You might need a little support when it comes to organizing your time and planning the various things you have to do? In this case, this template is made for you!

  2. A PhD timeline for finishing quickly [Free Gantt Download]

    Update your thesis draft with the complete analysis. Updated Draft: Year & Quarter Activity/Milestone Description Outcome/Output; Year 3, Q1: Thesis Writing: ... Example Gantt chart for a UK, European and Australian PhD. For Ph.D. programs outside the United States, especially in Europe and some other parts of the world, students often go ...

  3. Gantt Chart for a Research Project Proposal: Step-by-step guide

    At its core, a Gantt chart consists of two main components: tasks and time. The tasks related to the project are listed on the vertical axis, while the horizontal axis represents time. Each task is represented by a horizontal bar, the length of which corresponds to the duration of the task. Make your own Gantt chart in Gleek.

  4. How to write a Research Proposal: Creating a Gantt chart

    The Gantt chart shows the timelines of the various steps of the project including their dependencies and any resources needed. In other words, the chart depicts when an event is supposed to take place in your project by providing an outline regarding the order in which the various tasks need to be performed. An example of a Gantt chart.

  5. Gantt Chart for Dissertation

    The Gantt chart is one of the most important and useful tools for dissertation writing or even in project management. It enables the planner to develop a detailed schedule showing all the planned work, activities, milestones, and deliverables. The Gantt chart is not just a simple table with dates, but it is a graphical representation of a ...

  6. Dissertations 1: Getting Started: Planning

    To produce a Gantt chart, you can use Word, Excel (see example in the attachment) or an online planner. Tom's Planner. There's an example for you to use to complete your plan. Excel: example of Gantt Chart in Excel. This is an example of a Gantt chart which can be used to generate a plan of work (timeline) for your dissertation.

  7. How to Create a Research Timeline for Your Thesis

    Here we will take you step by step through creating your thesis timeline and provide some example templates, so you'll be well-prepared to begin your dissertation work. Reasons for Creating a Timeline. ... A popular organizational approach for thesis timelines is a Gantt chart, which is a type of bar chart often used in project management in ...

  8. PDF The University of Manchester Library My Learning Essentials

    Take a look at this example dissertation plan which takes the format of a Gantt chart: Managing your time Example dissertation plan Gantt charts can be created in Excel but there are some online tools that make it even easier. When creating your own Gantt chart, bear in mind, each stage can take varying lengths of time. ...

  9. How to use a Gantt chart for a research project

    You can create a Gantt chart in Microsoft Word by: Opening a new Word document. Change the document orientation from vertical to horizontal. Insert a bar graph into your document. Make format alterations as necessary to make the graph look like a Gantt chart. Insert information and customize as necessary.

  10. Dissertation Gantt Chart

    A Gantt chart helps you handle your workflow by providing a detailed graphical representation. Gantt charts allow you to see all the tasks that must be completed, the amount of time needed, and task overlap. This will allow you to keep better track of goals and deadlines, which will be useful in ensuring you are on time to complete everything.

  11. How to make a simple Gantt chart

    Learn how your comment data is processed. I want to see a simple project plan (Gantt chart) in every funding application. To make one, you need to: list all the activities in the project; estimate the time required for each activity; put the activities in order; merge any small tasks or similar, repetitive tasks and then draw it up.

  12. Gantt chart template Research

    Some people make their Gantt chart in Excel, but using Tom's Planner is a lot more flexible and intuitive. Our research project plan example has all the main stages and sub-stages pre-set and grouped in advance for you, all you need to do is insert the actual tasks and set them to the right time and duration.

  13. Creating awesome Gantt charts for your PhD timeline

    Manually creating a PhD timeline Gantt chart in PowerPoint is a bit easier than in Excel. Therefore, I will explain the process here. First, you need to open a blank PowerPoint slide. Then click on Insert (1.), then Chart (2.). A popup will appear.

  14. FREE Dissertation Gantt Charts Template

    Customize Dissertation Gantt Chart Online for Free and Download. Customize dissertation Gantt chart examples online to your specifications including the plan and timeline by replacing or editing the pre-written content to your own requirements. Choose your Gantt chart template to help your dissertation as a PhD student for a master thesis ...

  15. How to use a Gantt Chart to plan your dissertation research ST 2020

    A Gantt chart is often used in business for large and small scale projects to help everyone involved in the project stay on track, meet deadlines and avoid f...

  16. Creating a Gantt Chart for Your Research Project Proposal

    2. Break Down the Project into Stages. Identify the key stages involved in completing your research, such as literature review, data collection, data analysis, and proposal writing. 3. List Tasks Within Each Stage. Now, delve deeper into each research stage and meticulously list all the specific tasks that need to be completed.

  17. How to Create and Use a Gantt Chart for PhD Studies

    Steps involved in creating a Gantt chart for PhD studies. Step 1: List all the deliverables expected of your PhD program. In this example, the PhD program has the following requirements: Coursework, divided into 4 modules each lasting 2 weeks. All 4 modules need to be completed within the first year of study.

  18. Dissertation Proposal Gantt Chart Template

    With ClickUp's Gantt chart template, you can: Visually map out all the tasks and milestones involved in your dissertation proposal. Easily allocate time and resources to each task, ensuring efficient progress. Track your progress in real-time and make adjustments as needed. Collaborate with your advisor and team members, keeping everyone on the ...

  19. Gantt Chart Templates for Research Project Proposals

    The Project Roadmap Gantt Chart Template by ClickUp is a must-have for any research proposal. This simple, clear template allows you to map out the entire project from start to finish in an easy-to-follow format. With this template, it's easy to visualize tasks and deadlines, resources required and dependencies between tasks.

  20. Gantt Charts: What They Are and How to Make Them

    You can make a Gantt chart when you have a clear project scope and have finalised and approved the project charter with stakeholders. 2. Determine the tasks to complete the project. With your team, you can use the project charter to identify a comprehensive list of tasks and the order in which they should be completed.

  21. Gantt Chart for Thesis

    Use Creately's easy online diagram editor to edit this diagram, collaborate with others and export results to multiple image formats. You can easily edit this template using Creately. You can export it in multiple formats like JPEG, PNG and SVG and easily add it to Word documents, Powerpoint (PPT) presentations, Excel or any other documents.

  22. 11 Gantt Chart Examples For Project Management

    Gantt charts can be a helpful visual to include in project management plans. Like the previous example, this retro daily project Gantt chart example breaks down project activities day by day. It also breaks down who's responsible for what project activity. For example, Task 1/Activity 1 is color coded red.

  23. FREE 10+ Gantt Chart Research Proposal Samples in PDF

    10. Research Project Gantt Chart Template; 11. Proposal for Thesis Gantt Chart Template; What is a Gantt Chart Research Proposal? How to Create a Gantt Chart Research Proposal 1. Define specific goals, and objectives; 2. Collect and evaluate data 3. Explain your methodology and sequence activities; 4. Indicate the estimated time. FAQ

  24. Gantt chart: advantages, tips and examples

    (Excel) Template for a Gantt Chart. Using an Excel Gantt chart template is a proven approach to optimize your project planning and tracking. These templates provide a user-friendly method to organize and visualize your tasks, milestones, and schedules. In Excel, you can easily create a timeline by specifying start and end dates for your tasks.

  25. Gantt Chart Research Proposal

    21+ Gantt Chart Research Proposal Templates. Gantt charts are a useful productivity apparatus for project management. They are a bar chart derivative for task scheduling and progress tracking. The user plots the activity progress along the y-axis, with respect to the indicated time on the x-axis. The leftmost column contains the list of tasks ...

  26. Gantt Charts

    Summary: A Gantt chart is a project management tool that illustrates work completed over a period of time in relation to the time planned for the work. A Gantt chart can include the start and end dates of tasks, milestones, dependencies between tasks, assignees, and more. In the early part of the 20th century, Henry Gantt created charts that recorded the progress of workers to a task.

  27. Creating Gantt Charts in Excel Made Easy

    Add Duration series. Now you can set up the Duration series, right-click on the Gantt chart, choose Select Data from the menu options, then click "Add" and select the Duration series. This will open the "Select Data Source" dialog box. In the "Select Data Source" dialog box, click on the "Add" button. This will open the "Edit ...