SDLC V-Model – Software Engineering

The V-model is a type of SDLC model where the process executes sequentially in a V-shape. It is also known as the Verification and Validation model. It is based on the association of a testing phase for each corresponding development stage. The development of each step is directly associated with the testing phase. The next phase starts only after completion of the previous phase i.e., for each development activity, there is a testing activity corresponding to it. 

Table of Content

V-Model Design

Importance of v-model, principles of v-model.

  • When to Use of V-Model?
  • Advantages of V-Model

Disadvantages of V-Model

The V-Model is a software development life cycle (SDLC) model that provides a systematic and visual representation of the software development process. It is based on the idea of a “V” shape, with the two legs of the “V” representing the progression of the software development process from requirements gathering and analysis to design, implementation, testing, and maintenance.

  • Requirements Gathering and Analysis : The first phase of the V-Model is the requirements gathering and analysis phase, where the customer’s requirements for the software are gathered and analyzed to determine the scope of the project.
  • Design: In the design phase, the software architecture and design are developed, including the high-level design and detailed design.
  • Implementation: In the implementation phase, the software is built based on the design.
  • Testing: In the testing phase, the software is tested to ensure that it meets the customer’s requirements and is of high quality.
  • Deployment: In the deployment phase, the software is deployed and put into use.
  • Maintenance: In the maintenance phase, the software is maintained to ensure that it continues to meet the customer’s needs and expectations.
  • The V-Model is often used in safety: critical systems, such as aerospace and defence systems, because of its emphasis on thorough testing and its ability to clearly define the steps involved in the software development process.

software-Testing-Tutorial-SDLC-V-model

SDLC V-Model

The following illustration depicts the different phases in a V-Model of the SDLC.

Verification Phases :

It involves a static analysis technique (review) done without executing code. It is the process of evaluation of the product development phase to find whether specified requirements are met.

There are several Verification phases in the V-Model:

Business Requirement Analysis:

This is the first step of the designation of the development cycle where product requirement needs to be cured from the customer’s perspective. in these phases include proper communication with the customer to understand the requirements of the customers. these are the very important activities that need to be handled properly, as most of the time customers do not know exactly what they want, and they are not sure about it at that time then we use an acceptance test design planning which is done at the time of business requirement it will be used as an input for acceptance testing.

System Design:

Design of the system will start when the overall we are clear with the product requirements, and then need to design the system completely. This understanding will be at the beginning of complete under the product development process. these will be beneficial for the future execution of test cases.

Architectural Design:

In this stage, architectural specifications are comprehended and designed. Usually, several technical approaches are put out, and the ultimate choice is made after considering both the technical and financial viability. The system architecture is further divided into modules that each handle a distinct function. Another name for this is High-Level Design (HLD).

At this point, the exchange of data and communication between the internal modules and external systems are well understood and defined. During this phase, integration tests can be created and documented using the information provided.

Module Design:

This phase, known as Low-Level Design (LLD), specifies the comprehensive internal design for every system module. Compatibility between the design and other external systems as well as other modules in the system architecture is crucial. Unit tests are a crucial component of any development process since they assist in identifying and eradicating the majority of mistakes and flaws at an early stage. Based on the internal module designs, these unit tests may now be created.

Coding Phase:

The Coding step involves writing the code for the system modules that were created during the Design phase. The system and architectural requirements are used to determine which programming language is most appropriate.

The coding standards and principles are followed when performing the coding. Before the final build is checked into the repository, the code undergoes many code reviews and is optimized for optimal performance.

Validation Phases :

It involves dynamic analysis techniques (functional, and non-functional), and testing done by executing code. Validation is the process of evaluating the software after the completion of the development phase to determine whether the software meets the customer’s expectations and requirements. 

So, V-Model contains Verification phases on one side of the Validation phases on the other side. The verification and Validation phases are joined by the coding phase in a V-shape. Thus, it is called V-Model.  There are several Validation phases in the V-Model:

Unit Testing:

Unit Test Plans are developed during the module design phase. These Unit Test Plans are executed to eliminate bugs in code or unit level.

Integration testing:

After completion of unit testing Integration testing is performed. In integration testing, the modules are integrated and the system is tested. Integration testing is performed in the Architecture design phase. This test verifies the communication of modules among themselves.

System Testing:

System testing tests the complete application with its functionality, inter-dependency, and communication. It tests the functional and non-functional requirements of the developed application.

User Acceptance Testing (UAT):

UAT is performed in a user environment that resembles the production environment. UAT verifies that the delivered system meets the user’s requirement and the system is ready for use in the real world.

Design Phase:  

  • Requirement Analysis: This phase contains detailed communication with the customer to understand their requirements and expectations. This stage is known as Requirement Gathering.
  • System Design: This phase contains the system design and the complete hardware and communication setup for developing the product.
  • Architectural Design: System design is broken down further into modules taking up different functionalities. The data transfer and communication between the internal modules and with the outside world (other systems) is clearly understood.
  • Module Design: In this phase, the system breaks down into small modules. The detailed design of modules is specified, also known as Low-Level Design (LLD).

Testing Phases:  

  • Unit Testing: Unit Test Plans are developed during the module design phase. These Unit Test Plans are executed to eliminate bugs at the code or unit level.
  • Integration testing: After completion of unit testing Integration testing is performed. In integration testing, the modules are integrated, and the system is tested. Integration testing is performed in the Architecture design phase. This test verifies the communication of modules among themselves.
  • System Testing: System testing tests the complete application with its functionality, interdependency, and communication. It tests the functional and non-functional requirements of the developed application.
  • User Acceptance Testing (UAT): UAT is performed in a user environment that resembles the production environment. UAT verifies that the delivered system meets the user’s requirement and the system is ready for use in the real world.

Industrial Challenge:

As the industry has evolved, the technologies have become more complex, increasingly faster, and forever changing, however, there remains a set of basic principles and concepts that are as applicable today as when IT was in its infancy. 

  • Accurately define and refine user requirements.
  • Design and build an application according to the authorized user requirements.
  • Validate that the application they had built adhered to the authorized business requirements.

1. Early Defect Identification

By incorporating verification and validation tasks into every stage of the development process, the V-Model encourages early testing. This lowers the cost and effort needed to remedy problems later in the development lifecycle by assisting in the early detection and resolution of faults.

2. determining the Phases of Development and Testing

The V-Model contains a testing phase that corresponds to each stage of the development process. By ensuring that testing and development processes are clearly mapped out, this clear mapping promotes a methodical and orderly approach to software engineering.

3. Prevents “Big Bang” Testing

Testing is frequently done at the very end of the development lifecycle in traditional development models, which results in a “Big Bang” approach where all testing operations are focused at once. By integrating testing activities into the development process and encouraging a more progressive and regulated testing approach, the V-Model prevents this.

4. Improves Cooperation

At every level, the V-Model promotes cooperation between the testing and development teams. Through this collaboration, project requirements, design choices, and testing methodologies are better understood, which improves the effectiveness and efficiency of the development process.

5. Improved Quality Assurance

Overall quality assurance is enhanced by the V-Model, which incorporates testing operations at every level. Before the program reaches the final deployment stage, it makes sure that it satisfies the requirements and goes through a strict validation and verification process.

  • Large to Small: In V-Model, testing is done in a hierarchical perspective, for example, requirements identified by the project team, creating High-Level Design, and Detailed Design phases of the project. As each of these phases is completed the requirements, they are defining become more and more refined and detailed.
  • Data/Process Integrity: This principle states that the successful design of any project requires the incorporation and cohesion of both data and processes. Process elements must be identified at every requirement.
  • Scalability: This principle states that the V-Model concept has the flexibility to accommodate any IT project irrespective of its size, complexity, or duration.
  • Cross Referencing: A direct correlation between requirements and corresponding testing activity is known as cross-referencing.

Tangible Documentation:

This principle states that every project needs to create a document. This documentation is required and applied by both the project development team and the support team. Documentation is used to maintain the application once it is available in a production environment.

Why preferred?  

  • It is easy to manage due to the rigidity of the model. Each phase of V-Model has specific deliverables and a review process.
  • Proactive defect tracking – that is defects are found at an early stage.

When to Use of V-Model ?

  • Traceability of Requirements: The V-Model proves beneficial in situations when it’s imperative to create precise traceability between the requirements and their related test cases.
  • Complex Projects: The V-Model offers a methodical way to manage testing activities and reduce risks related to integration and interface problems for projects with a high level of complexity and interdependencies among system components.
  • Waterfall-Like Projects : Since the V-Model offers an approachable structure for organizing, carrying out, and monitoring testing activities at every level of development, it is appropriate for projects that use a sequential approach to development, much like the waterfall model.
  • Safety-Critical Systems: These systems are used in the aerospace, automotive, and healthcare industries. They place a strong emphasis on rigid verification and validation procedures, which help to guarantee that essential system requirements are fulfilled and that possible risks are found and eliminated early in the development process.

Advantages  of V-Model

  • This is a highly disciplined model and Phases are completed one at a time.
  • V-Model is used for small projects where project requirements are clear.
  • Simple and easy to understand and use.
  • This model focuses on verification and validation activities early in the life cycle thereby enhancing the probability of building an error-free and good quality product.
  • It enables project management to track progress accurately.
  • Clear and Structured Process: The V-Model provides a clear and structured process for software development , making it easier to understand and follow.
  • Emphasis on Testing: The V-Model places a strong emphasis on testing, which helps to ensure the quality and reliability of the software.
  • Improved Traceability: The V-Model provides a clear link between the requirements and the final product, making it easier to trace and manage changes to the software.
  • Better Communication: The clear structure of the V-Model helps to improve communication between the customer and the development team.
  • High risk and uncertainty.
  • It is not good for complex and object-oriented projects.
  • It is not suitable for projects where requirements are not clear and contain a high risk of changing.
  • This model does not support iteration of phases.
  • It does not easily handle concurrent events.
  • Inflexibility: The V-Model is a linear and sequential model, which can make it difficult to adapt to changing requirements or unexpected events.
  • Time-Consuming: The V-Model can be time-consuming, as it requires a lot of documentation and testing.
  • Overreliance on Documentation: The V-Model places a strong emphasis on documentation, which can lead to an overreliance on documentation at the expense of actual development work.

A scientific and organized approach to the Software Development Life Cycle (SDLC) is provided by the Software Engineering V-Model. The team’s expertise with the selected methodology, the unique features of the project, and the nature of the requirements should all be taken into consideration when selecting any SDLC models, including the V-Model.

Reference Book:

“Software Engineering: A Practitioner’s Approach” by Roger S. Pressman, published by McGraw-Hill Education, 2017.

Similar Reads

  • Software Engineering

Please Login to comment...

Improve your coding skills with practice.

 alt=

What kind of Experience do you want to share?

  • HestaBit.technologies
  • [email protected]
  • +44 7441 954088
  • A day @ HestaBit
  • Success Stories
  • Android app development
  • IOS app development
  • Hybrid app development
  • Web App Development
  • Staff Augmentation
  • Recruitment Process Outsourcing

V Model in SDLC – The Process, Implementation, Pros and Cons

In every software development life cycle, you get the flexibility to follow the processes at your convenience. And how do you do that? There are various approaches that can comply with your SDLC phases for a smoother run. These approaches originate as “ SDLC models ” to help you overcome specific challenges. We have already discussed one such model, “ The Waterfall model ,” in our previous article. 

However, the waterfall model was not found suitable for large and complex projects. One of its significant handicaps was the identification of defects at the very last stage of development. To overcome this risk, another SDLC approach was brought into light: The V Model.  

In this article, we will cover all the necessary aspects of the V SDLC model, including its process, implementation, objectives, advantages, and disadvantages. 

So, if you don’t want to miss out on anything important, make sure you read it till the end. Here is a map of all the topics we are going to talk about: 

  • What is the V model in SDLC? 
  • How is the V concept different from other models?
  • Sequential phases in the V model.
  • When to use the V model?
  • What can you benefit from the V model?
  • Limitation to this concept. 

Introduction to the “V” model 

The “V” in the SDLC model stands for “verification” and “validation”. V-model is a linear methodology used in the software development life cycle. The concept fairly focuses on a sequential path of execution. But unlike other models, it emphasizes completing each phase before the next phase begins. 

Few Things You Need To Know About The V Concept

  • The “V” approach was first countered by the commissioning of the state of Germany for planning system development projects. 
  • It involves the entire lifecycle of a software system nicely fitted in the line of engineering. 
  • “Das V Modell” was the first official project management approach for executing projects successfully. 
  • The key feature of the V model is that it determines “who has to do what and when” in any SDLC project. 
  • Today, the V concept is widely adapted and translated in every complex software development system. 
  • As the name suggests, V illustrates how verification and validation can be connected within various stages. 
  • The development and quality assurance(testing) phase is followed simultaneously here. 

Every stage in the “V” approach is very similar to the steps used in the “Waterfall model.” This might make you wonder what makes the V model different and unique. 

Well, here’s your answer. 

How is the “V” concept different from other SDLC models? 

v model case study example

The V(verification and validation) concept overcomes the disadvantages of the waterfall model. 

In the waterfall model, we realized that the testers and defects are only found at the testing phase, which is the last phase in the SDLC. This somehow turns into one challenging and costly affair, now that you are done with the analysis and integration. 

V model doesn’t disappoint you till the end. Here, the testing phase starts when your product is at its early stages to avoid the downward flow of defects. This can save you from a lot of rework. 

Now, before we understand the V model, let’s take a quick glance at the terms “verification” and “validation” that sum up the entire concept. 

Verification

It is a stable or complex analysis technique. Just how its name implies, it focuses on the verification part. Here, testing is done without executing the code. Tasks like- review, walkthrough, and inspection are included in this. 

It is a dynamic analysis technique. Here, testing is done with the code execution in order to validate the process. Tasks like functional and non-functional testing are included in this. 

Now that we are familiar with both the terms, you might find the model relatively easy. 

V Model and its Sequential Phases

As mentioned above, the V SDLC model is a distinguished approach where the development and quality assurance activities are performed simultaneously. There is no discrete phase for Testing. Testing starts right from the requirement and analysis. Therefore, the verification and validation go hand in hand.

v model case study example

If you look at the figure above, you will notice that the left side of the V diagram consists of all the developmental activities, and the right side of the V diagram includes all the testing activities. 

Since all the specifications are decided on the left side, we will call it “The Specification stream” . Similarly, the right side comprises all the testing stages; hence, we will call it “The Testing stream” .

Now, to understand this figure, let’s discuss every activity in detail. To give you a clear picture, we will also mention the verification and validation activities performed at every stage. 

Starting from the specification stream (Left side) of the model

Typically, you’d be surprised to hear that testing and development can be done altogether. However, the beauty of the V model demonstrates the testing phase in all the stages of the Software development life cycle. 

  • Requirement and analysis

v model case study example

  • This phase is again very similar to the analysis phase of the waterfall model. You are needed to collect and analyze specific requirements here.
  • One needs to study the functions and the performance of the desired software product and focus on a satisfying user experience. 
  • This stage mainly involves brainstorming ideas, walkthrough sessions, and interviews to be clear about the objectives. 

Verification task – requirement reviews

Validation task- User acceptance test (UAT) is created for test cases. 

Make sure that you are clear with the UAT and other reviews before moving on to the next stage. 

  • System Requirements and Designing (High level)
  • This stage includes building a high-level software system design.
  • Further, the development team studies the structure and investigates implementing the resources. 
  • This gives you an overview of the technical feasibility of your software. 
  • Ultimately, you understand the dependencies and create modules according to the requirements. 

Verification task – design reviews

Validation task- Feasibility metrics, modules, and system test plans are created. 

  • Architectural Design

v model case study example

  • You can build a software architecture based on high-level design. 
  • Further, finalize the modules, architectural diagrams, dependencies, database tables, and all other technical details. 

Verification task – Design and architectural review

Validation task- Integration test plan and test cases, and other database tables are created. 

  • Module designing (Low level)

v model case study example

  • Here, one needs to design every module of the software components separately. 
  • Moreover, you might also require data test reports, interfaces, and classes to comply with the guidelines. 

Verification task – design review before the modules are created. 

Validation task – Unit test cases and other reports are created. 

  • Implementation (Coding)
  • This is the centermost stage of the V model.
  • The actual coding is done in this stage.

Verification task – Test case and code review

Validation task- functional test cases are created while writing the codes.

Then comes the right side (Testing stream) of the model

Since every stage here requires execution, it is entirely validation-based. We will start from the bottom-most stage here. 

  • Unit Testing

v model case study example

  • Unit testing is a kind of white box testing technique where a piece of code is written to check whether the code snippet gives the desired outcome or not. 
  • In any anomaly, you can easily track the defaults and log them for improvement. 
  • Every unit test case created in a low-level design will be executed here. 
  • Integration Testing

v model case study example

  • This testing stage requires the integration of modules. 
  • Basically, it validates whether the components created in the design phase work together or not. 
  • The integration test cases created in the architectural design stage are executed here. 
  • You can automatically detect any defect and log for changes.
  • System Testing
  • In any app development or software development cycle, the actual full-fledged testing of the application or product is conducted at this stage. 
  • All the non-functional, functional, and unit test cases are executed here. 
  • One key aspect of this stage is the progress report. It updates all the feasibility of the software along with the risks mitigated. 
  • User Acceptance Testing

v model case study example

  • This is a business requirement testing. It is conducted to validate the user environment with the business requirements. 
  • You can check the compatibility and other non-functional tasks here. 

Note- Remember that both (Specification and Testing) streams run side by side, creating a V shape. 

When To Use The V Model?

The V approach is highly used in all kinds of software development projects; however, understand that you do not need to follow the concept on certain projects.

The V model is applicable:

  • When the requirements are pre-defined. 
  • The project’s acceptance criteria are well defined. 
  • The project is neither too small nor too complex. 
  • Resources are stable. 
  • Tools and technology implied are not dynamic. 
  • There are no prototypes produced; therefore, only choose this model when you are highly confident of your user requirement. 

Under these conditions, the V software development lifecycle model might give you practical and best results.

The objective of the V Model

V model provides you guidance for systematic planning and execution of the software development project. You can achieve the below objectives from the V model approach:

  • Quality and improvement

It has a standardized process; therefore, the model guarantees complete results. Since these results are checked from the very first stage, there is no compromise with the quality, and you always get a scope for improvement. 

  • Minimal project risks

With the V model, the control and transparency keep improving at every stage. This, in turn, enhances the project management process. 

  • Cost reduction

You can estimate the cost for development, operation, production, and maintenance at a very early phase. This will help you reduce the dependency on the supplier and other services, saving you cost and effort. 

Advantages of using the V SDLC model  

  • The V model is relatively easy to implement since the process is pre-defined. 
  • Testing runs parallel with planning, designing, and coding. This saves you a lot of time. Thus, higher success rate than the waterfall model. 
  • You can easily detect the anomalies and prevent them from crashing your system in the future. 
  • The model works perfectly for the projects where the requirements are defined, and you have ample resources. 

Limitations to V SDLC model

  • The V model is manageable yet not flexible. It plays rigidly in the development process but can be dynamic in app development . 
  • If you make any changes midway, you might have to update all the primary documents. 
  • You do not get the option to generate a prototype. Hence, you always have a risk of not testing customer expectations. 
  • It leads to more documentation work whenever you have multiple projects to conclude. 

Final Thoughts

I hope you were able to cover all the crucial aspects related to the V SDLC model . The approach is comprehensible and might help you develop a quality software product in the minimum period. Enterprises prefer the V model due to its standard features and risk-free procedure. But before you make a final decision, make sure you have ample insights and resources for this, so you do not end up compromising with the quality. Now, go ahead and create a mind-blowing software.

v model case study example

Shivangi is a Technical Content Writer at Hestabit. She is a dedicated one and a lifelong learner with an evergreen curiosity to learn new things. She uses her skilled research and technical expertise to come up with content valuable to the audience. She is a writer by day and a reader by night who loves exploring the marketing world.

Post Navigation

waterfall model

Waterfall Model in SDLC: Processes, Advantages and Disadvantages

v model case study example

Flutter and Cross-Platform Applications: The Perfect Pair

Related posts:.

Whatsapp Confession

Where is Your Data Going With WhatsApp?

v model case study example

Virtual Reality Brings Travel At Your Doorstep

v model case study example

Android Versions List: A Complete Journey From Android 1.0 to 12 (Contd.)

v model case study example

Table of Contents

Applying the v-model in automotive software development.

  • June 25, 2021
  • April 24, 2024

Smishad Thomas

The role of electronic systems in the automotive industry is continuously expanding. As the number of electronic functions increases, so do the number of ECUs in the vehicle. This increase in ECUs and electronic functions results in the associated software becoming more complex and expansive.

According to Markets and Markets, the global automotive software market is projected to grow to USD 37 billion by 2025, from USD 16.9 billion in 2020, at a CAGR of 16.9%. Statistics show that software plays a vital role in various vehicle functions, and this role is expected to proliferate in the future.

As a mission-critical industry, the automotive development process must adhere to regulatory standards such as ISO 26262 and ASPICE to minimize the risk of failure. Following standard development procedures can have a positive outcome on the success of automotive functions and software. V-Model is one of the widely used software development processes in the automotive industry.

To put it simply, V-Model (where V stands for verification and validation) splits the development process into two parts – the left arm of the V consists of requirement analysis, function design, and software development while the right arm concentrates on the verification and validation activities followed by the release. The V-model is an extension of the waterfall methodology. V-Model emphasizes testing, particularly the need for early test planning. Each phase of the V-model aligns with the ASPICE standard and helps in clearly defining a life cycle.

V-Model in Automotive Software Development

Understanding the V-Model process 

Requirements Engineering : This is the first step in the V-model process and entails establishing and documenting requirements. It includes clearly defining and noting the task/s that the automotive function/feature will perform and how. The success of the design and development phase depends significantly on this phase being well executed.   

However, many a time, the requirement document may not contain details about the implementation. Since the development process follows this phase, it is best to involve the development team while preparing the requirements document to ensure clarity.  

System Design and Development : The next step is the actual design and development of the function/feature for which the requirement was gathered in the first phase. In the development phase, the functionalities are designed and tested using the model-based development environment. The function/functionality needs to be tested as it is being developed, ensuring that bugs and errors are fixed early on.  

In the model-based development environment, simulation tools such as MATLAB/Simulink can simulate real-world scenarios. The potential bugs and errors are highlighted and rectified during this phase. These tests are called Model in the Loop (MIL) since the testing is done in a controlled environment using models. Once the development process and testing are complete and the results are satisfactory, the model – a block diagram – is then sent to the software development team.   

Developing Software : The software piece is created according to the model. There may be different versions of the software depending upon the use case. Model-based design tools can generate automatic code; most of the hand (written) codes are written in C language, and most ECUs are also developed using C. The software development input can either be in the form of the model or a requirement document, both of which give a detailed description of the function/feature.  

RELATED BLOG

Automotive ECU: An Inevitable Part of the Automobiles

The document for software development contain s details regarding the software architecture, its modularity,  the  number of functions in  the  module,  its  periodicity , and a  flowchart of the entire software ,  among others. Once the software development process  and testing are  complete ,  we progress  to  the next phase.   

Software Integration and Function/Feature Integration:  Since there are different ECUs, most may have their own control software.  T he engineer combine s all the software modules  during the software integration phase and  check s  the interaction between  them. The  impact on the legacy code  and  other software modules  is also monitored . Again, the testing in this phase is done with the help of simulations using Hardware in a Loop (HiL) environments.     

The engineer then needs to assess whether  the newly integrated function  affects any other modules’ functioning.  However, the testing here is done in a physical environment (in-vehicle test). The  most important  aspect of testing , in this case,  is ensuring that the implementation is done correctly,  with  no flaws  or  unwanted consequences. 

Therefore, a test scenario must be defined and prepared to test the function in the vehicle. Next, the ECU is connected to a computer loaded with the prescribed tools via different communication protocols. This validation process helps in confirming that the product can perform as required. The integration phase is followed by function calibration; this involves fine-tuning the software parameters to enable top field performance.    

Advantages, Challenges, and Emerging Directions in Applying the V-Model to Automotive Software Development

Introduction

The automotive sector has witnessed a profound transformation in recent years, largely attributed to the rising influence of software in modern vehicles. Automotive software development is a complex and critical process, and methodologies such as the V-Model play an indispensable role in ensuring efficiency and safety. In this blog, we delve into the exclusive advantages, inherent challenges, and emerging trends linked to the application of the V-Model in the realm of automotive software development.

Advantages of the V-Model in Automotive Software Development

Structured approach:.

The V-Model provides a structured framework for automotive software development. It synchronizes the phases of development, testing, and validation, ensuring that each requirement is meticulously addressed, and every defect is promptly identified and rectified.

Early Validation:

An eminent advantage of the V-Model is its emphasis on early validation and testing. This early verification process mitigates the risk of late-stage defects, potentially saving substantial costs while ensuring the safety and reliability of automotive software.

Regulatory Compliance:

The automotive industry is tightly regulated, with stringent safety and quality standards such as ISO 26262 for functional safety. The V-Model’s attention to documentation and traceability greatly assists in demonstrating compliance with these rigorous requirements.

Enhanced Quality:

The integration of validation and verification throughout the development process facilitates the delivery of high-quality software.

Challenges of the V-Model in Automotive Software Development:

The V-Model’s linear and somewhat inflexible structure may not always align with the demands of agile development practices, making it challenging to adapt to rapidly evolving requirements or customer feedback.

Lengthy Development Cycles:

The comprehensive testing and validation phases incorporated in the V-Model can potentially extend the development timeline. This can pose a significant challenge in an industry where swift time-to-market is imperative.

Costly Documentation:

The substantial documentation required by the V-Model can lead to increased overheads in terms of time, resources, and expenses. Managing this documentation efficiently can be a formidable challenge.

Talent and Training:

To effectively implement the V-Model, automotive companies must ensure that their teams possess the requisite expertise and training. Nurturing and maintaining this expertise can be a prolonged challenge.

Emerging Trends in Applying the V-Model in Automotive Software Development:

Agile Integration:

To circumvent the rigidity of the V-Model, many automotive software development teams are increasingly incorporating agile practices. This amalgamation, often referred to as “Agile-V,” allows for greater adaptability while retaining the V-Model’s structured approach.

DevOps Adoption:

The adoption of DevOps, which underscores collaboration and automation between development and operations teams, is gaining momentum in automotive software development. This trend streamlines software deployment and updates, enhancing efficiency.

Continuous Verification and Validation:

Automotive companies are progressively embracing continuous verification and validation practices. This approach involves testing and validation as ongoing processes throughout the software development lifecycle, rather than distinct phases.

Model-Based Development:

The utilization of model-based development tools and techniques is on the rise to enhance the efficiency of the V-Model. These tools aid in creating a higher level of abstraction and automation, simplifying development complexity.

Autonomous Vehicle Development:

The development of autonomous vehicles challenges the boundaries of the V-Model. Given the complexity and safety-critical nature of the software involved, it demands even more rigorous testing and validation.

The V-Model remains a valuable methodology for automotive software development, offering a structured approach, early validation, and regulatory compliance advantages. Nonetheless, it also presents challenges related to rigidity, prolonged development cycles, documentation, and talent requirements. In a rapidly evolving automotive industry where software is paramount, the V-Model is adapting to address these challenges through the integration of agile practices, DevOps adoption, continuous verification and validation, model-based development, and a keen focus on autonomous vehicle development. As the importance of software in vehicles continues to grow, the V-Model will evolve to meet the dynamic demands of this industry.

The V-model is simple and easy to use, but it is also rigid and does not allow for any shortcuts in case of an emergency. It helps in clearly defining a cycle and efficient implementation if the requirements are clearly established in the requirement gathering phase. A strong team with adequate knowledge and experience aids success.   

eInfochips is an ISO 26262 and ASPICE certified systems and software partner for various automotive companies across the world. We have experience in successfully developing automotive systems and subsystems for our clients. To know more about our expertise, please  get in touch  with us.   

Picture of Smishad Thomas

Explore More

Quick guide on developing and deploying vision-based multi-camera solutions

Quick guide on developing and deploying vision-based multi-camera solutions

v model case study example

Power ICs Innovations Driving Energy Efficiency and Miniaturization

Securing Remote Workforces with Microsegmentation

Securing Remote Workforces with Microsegmentation

RTABMap Performance Analysis for ToF and RealSense on NVIDIN Orin Family

RTABMap Performance Analysis for ToF and RealSense on NVIDIA Orin Family

Public Key Infrastructure (PKI)

Public Key Infrastructure (PKI)

Transforming Medication Management with Automation and AI

Transforming Medication Management with Automation and AI

Talk to an expert.

v model case study example

eInfochips, an Arrow Electronics company, is a leading provider of digital transformation and product engineering services. eInfochips accelerates time to market for its customers with its expertise in IoT, AI/ML, security, sensors, silicon, wireless, cloud, and power. eInfochips has been recognized as a leader in Engineering R&D services by many top analysts and industry bodies, including Gartner, Zinnov, ISG, IDC, NASSCOM and others.

Headquarters – USA, San Jose – INDIA, Ahmedabad

Write to Us: [email protected]

  • Hardware Design
  • Embedded Software Development
  • Design to Manufacturing
  • Product Sustenance Engineering
  • Image Tuning
  • OS Porting & Optimization
  • Remote Device Management
  • Product Redesign
  • Big Data Analytics
  • Cybersecurity
  • Robotic Process Automation
  • Product Testing
  • Web & Mobile Testing
  • Cloud Testing
  • IoT Testing
  • Quality Process Consulting
  • Intelligent Test Automation
  • Security Testing
  • UI/UX Testing
  • Wireless Testing Services
  • ASIC/FPGA Design & Development
  • Design Verification & Validation
  • Physical Design and DFT
  • Process Migration
  • IP Integration & Verification
  • Derivative ASIC Design

Medical Devices

  • Pharma & Life Sciences​
  • Digital Health
  • Industrial Automation
  • Building Technologies

Energy & Utilities

  • Heavy Machinery

Consumer Electronics

  • Security & Surveillance
  • Semiconductor
  • Compute and Storage
  • ISVs & Platforms

Case Studies

Whitepapers.

  • eStore Blog
  • Customer Testimonials

Explore eInfochips

Leadership team.

  • Partnerships & Alliances
  • Awards & Accolades
  • Corporate Social Responsibility
  • Privacy Policy

Start a conversation today

Schedule a 30-minute consultation with our Battery Management Solutions Expert

Schedule a 30-minute consultation with our  Industrial & Energy Solutions  Experts

Schedule a 30-minute consultation with our experts

Please Fill Below Details and Get Sample Report

Reference designs.

v model case study example

Partnerships

Device partnerships.

v model case study example

Click heare to know more..

Digital partnerships.

v model case study example

Click heare to know more...

Quality partnerships.

v model case study example

Silicon Partnerships

v model case study example

Our Clients

Awards and accolades, corporate responsibility, irespectyou, security, surveillance & access controls, smart retail, smart spaces, industrial products, semiconductors, products & ips,     device engineering,     digital engineering,     quality engineering,     silicon engineering, foundation services, transformation services.

v model case study example

Our website places cookies on your device to improve your experience and to improve our site. Read more about the cookies we use and how to disable them. Cookies and tracking technologies may be used for marketing purposes.

By clicking “Accept”, you are consenting to placement of cookies on your device and to our use of tracking technologies. Click “Read More” below for more information and instructions on how to disable cookies and tracking technologies. While acceptance of cookies and tracking technologies is voluntary, disabling them may result in the website not working properly, and certain advertisements may be less relevant to you. We respect your privacy. Read our privacy policy.

Airbrake logo144-1

  • Get Started

Dec 26, 2016 3:00:55 AM | V-Model: What Is It And How Do You Use It?

The V-Model is a development methodology used for software development (SDLC). The V-Model focuses on a waterfall-esque method and follows strict stages.

The V-Model is a unique, linear development methodology used during a software development life cycle (SDLC) . The V-Model focuses on a fairly typical  waterfall -esque method that follows strict, step-by-step stages. While initial stages are broad design stages, progress proceeds down through more and more granular stages, leading into implementation and coding, and finally back through all testing stages prior to completion of the project.

In this article we'll examine just what the V-Model actually entails, and why it may (or may not) be suitable for certain types of projects or organizations.

Some more specific takes on SDLC include:

The Process of the V-Model

Much like the traditional waterfall model, the V-Model specifies a series of linear stages that should occur across the life cycle, one at a time, until the project is complete. For this reason V-Model is not considered an agile development method, and due to the sheer volume of stages and their integration, understanding the model in detail can be challenging for everyone on the team, let alone clients or users.

To begin, it's best to visualize the rough stages of the V-Model, as seen in the diagram below.

Image courtesy of  Wikipedia.org

The V-shape of the V-Model method represents the various stages that will be passed through during the software development life cycle. Beginning at the top-left stage and working, over time, toward the top-right tip, the stages represent a linear progression of development similar to the waterfall model.

Below we'll briefly discuss each of roughly nine stages involved in the typical V-Model and how they all come together to generate a finished product.

Requirements

During this initial phase, system requirements and analysis are performed to determine the feature set and needs of users. Just as with the same phase from the waterfall model or other similar methods, spending enough time and creating thorough user requirement documentation is critical during this phase, as it only occurs once.

Another component unique to the V-Model is that during each design stage, the corresponding tests are also designed to be implemented later during the testing stages. Thus, during the requirements phase, acceptance tests are designed.

System Design

Utilizing feedback and user requirement documents created during the requirements phase, this next stage is used to generate a specification document that will outline all technical components such as the data layers, business logic, and so on.

System Tests are also designed during this stage for later use.

Architecture Design

During this stage, specifications are drawn up that detail how the application will link up all its various components, either internally or via outside integrations. Often this is referred to as  high-level design .

Integration tests are also developed during this time.

Module Design

This phase consists of all the  low-level design  for the system, including detailed specifications for how all functional, coded business logic will be implemented, such as models, components, interfaces, and so forth.

Unit tests should also be created during the module design phase.

Implementation/Coding

At this point, halfway through the stages along the process, the actual coding and implementation occur. This period should allot for as much time as is necessary to convert all previously generated design and specification docs into a coded, functional system. This stage should be fully complete once the testing phases begin.

Unit Testing

Now the process moves back up the far side of the V-Model with inverse testing, starting with the unit tests developed during the module design phase. Ideally, this phase should eliminate the vast majority of potential bugs and issues, and thus will be the lengthiest testing phase of the project.

That said, just as when performing unit testing with other development models, unit tests cannot (or should not) cover every possible issue that can occur in the system, so the less granular testing phases to follow should fill in these gaps.

Integration Testing

Testing devised during the architecture design phase are executed here, ensuring that the system functions across all components and third-party integrations.

System Testing

The tests created during system design are next executed, largely focusing on performance and regression testing.

Acceptance Testing

Lastly, acceptance testing is the process of implementing all tests created during the initial requirements phase and should ensure that the system is functional in a live environment with actual data, ready for deployment.

Advantages of the V-Model

  • Suited for Restricted Projects: Due to the stringent nature of the V-Model and its linear design, implementation, and testing phases, it's perhaps no wonder that the V-Model has been heavily adopted by the  medical device industry  in recent years. In situations where the project length and scope are well-defined, the technology is stable, and the documentation & design specifications are clear, the V-Model can be a great method.
  • Ideal for Time Management: Along the same vein, V-Model is also well-suited for projects that must maintain a strict deadline and meet key milestone dates throughout the process. With fairly clear and well understood stages that the whole team can easily comprehend and prepare for, it is relatively simple to create a time line for the entire development life cycle, while generating milestones for each stage along the way. Of course, the use of BM in no way ensures milestones will always be met, but the strict nature of the model itself enforces the need to keep to a fairly tight schedule.

Disadvantages of the V-Model

  • Lacks Adaptability: Similar to the issues facing the traditional waterfall model on which the V-Model is based, the most problematic aspect to the V-Model is its inability to adapt to any necessary changes during the development life cycle. For example, an overlooked issue within some fundamental system design, that is then only discovered during the implementation phase, can present a severe setback in terms of lost man-hours as well as increased costs.
  • Timeline Restrictions: While not an inherent problem with the V-Model itself, the focus on testing at the end of the life cycle means that it's all too easy to be pigeonholed at the end of the project into performing tests in a rushed manner to meet a particular deadline or milestone.
  • Ill-Suited for Lengthy Life Cycles: Like the waterfall model, the V-Model is completely linear and thus projects cannot be easily altered once the development train has left the station. V-Model is therefore poorly suited to handle long-term projects that may require many versions or constant updates/patches.
  • Encourages 'Design-by-Committee' Development: While V-Model is certainly not the only development model to fall under this criticism, it cannot be denied that the strict and methodical nature of the V-Model and its various linear stages tend to emphasize a development cycle befitting managers and users, rather than developers and designers. With a method like V-Model, it can be all too easy for project managers or others to overlook the vast complexities of software development in favor of trying to meet deadlines, or to simply feel overly confident in the process or current progress, based solely on what stage in the life cycle is actively being developed.

Written By: Frances Banks

You may also like.

 alt=

May 2, 2017 2:19:03 PM | What Is Behavior-Driven Development and How To Use It

Mar 14, 2017 6:28:01 am | what is rational unified process and how do you use it, dec 8, 2016 3:00:46 am | waterfall model: what is it and when should you use it.

© Airbrake. All rights reserved. Terms of Service | Privacy Policy | DPA

COMMENTS

  1. What Is the V-Model? (Definition, Examples)

    The verification phase refers to the practice of evaluating the product developmentprocess to ensure the team meets the specified requirements. The verification phase includes several steps: busines…

  2. Figure 4: Example of the V-Model in the automotive industry...

    A good example of the V-model used in the automotive software realm is the ECU development process as outlined by D-Space 10 (Fig. 4).

  3. SDLC V-Model

    The V-model is a type of SDLC model where the process executes sequentially in a V-shape. It is also known as the Verification and Validation model. It is based on the association of a testing phase for each corresponding …

  4. Applying the V Model and Axiomatic Design in the Domain of IT ...

    A case study is seen as a mature research method for building theories in this field [1-3]. The cases are examples of paradigmatic cases, because they provide typical …

  5. Mastering the V-Model: An In-Depth Guide to the V-Model SDLC

    The V-Model is an SDLC model that stands out for its emphasis on verification and validation at each stage of development. In this guide, we'll dive into the V-Model, discussing its …

  6. V Model in SDLC

    To overcome this risk, another SDLC approach was brought into light: The V Model. In this article, we will cover all the necessary aspects of the V SDLC model, including its process, implementation, objectives, advantages, …

  7. Applying the V-Model in Automotive Software …

    In a rapidly evolving automotive industry where software is paramount, the V-Model is adapting to address these challenges through the integration of agile practices, DevOps adoption, continuous verification and …

  8. V-Model: What Is It And How Do You Use It?

    The V-Model is a unique, linear development methodology used during a software development life cycle (SDLC). The V-Model focuses on a fairly typical waterfall-esque method that follows strict, step-by-step stages.

  9. What is STLC V-Model?

    V-Model. In the V model, the development and QA activities are done simultaneously. There is no discrete phase called Testing, rather testing starts right from the requirement phase. The verification and validation …