How to Make a Responsibility Assignment Matrix for a Project (Template Included)

ProjectManager

The most important resource you’ll employ to deliver the project is people. They have to fit into the schedule and maintain the project budget. Defining what their roles and responsibilities are when executing tasks and delivering on the project goals is an important part of controlling the project.

How can you coordinate all the people who are involved in a project so they know what they’re doing and don’t block others from doing what they are assigned? Using a responsibility assignment matrix can help. An assignment matrix gives your project a team that gets things done.

What is a Responsibility Assignment Matrix in Project Management?

A responsibility assignment matrix (RAM) is a project management chart used to identify and define the various people and organizations and outline each of their roles in working on tasks or delivering a part of the project.

Project managers use an assignment matrix to clarify what cross-functional teams do within the boundaries of the project and its numerous processes. Sometimes a responsibility assignment matrix is required when responding to a request for proposal (RFP).

The responsibility assignment matrix can also be called a RACI matrix, which stands for responsible, accountable, consulted and informed.

  • Responsible: Notes who is responsible for executing the task, which is then assigned to them.
  • Accountable: Notes who has decision-making authority and how that power is delegated throughout the project team.
  • Consulted: Notes who is able to offer insight into the task, from team members to stakeholders.
  • Informed: Notes who is updated on what in terms of progress and performance, as well as when and how this information is disseminated.

This creates a map of connections between activities and project team members. Depending on the size of the project, there can be several assignment matrices used for various project levels.

Why Create a Responsibility Assignment Matrix?

The assignment matrix identifies what everyone on the team is responsible for, which means not only what their duties are, but how they participate in the project. Some will have defined tasks, others will offer help with work, while there are some who are designated as decision-makers. These groups all have an identity and function within the project to help guide it towards a successful end.

Clear communication leads to more efficient projects. An assignment matrix facilitates better communication between team members and provides transparency by creating a system to make sure everyone is updated and always on the same page. Belaboring communications can bog down a project with too many pointless meetings and confusing interactions in which people try to understand what they’re supposed to be doing. Using the responsibility assignment matrix helps, but having project management software that connects teams in real-time is ideal.

ProjectManager manages project information by allowing teams to attach files directly to tasks, and our unlimited file storage keeps important project documents at your fingertips anywhere, anytime. Commenting on tasks can save time and tagging others in the project team creates a communication process that avoids the pitfalls of redundancies or unnecessary meetings.

Gantt chart screenshot with a team collaboration pop up

When Should a Responsibility Assignment Matrix Be Created?

The responsibility assignment matrix would be created at the start of the project. You’d want to have everyone on the project team aware of where they stand in terms of their involvement before they start executing tasks.

As much as its use is a preventative measure, it can be used prescriptively. If you’re deep into the project and things are not moving as planned, there could be communication gridlock. If team members are not in the loop, or misconstrue what they’re supposed to be doing, using a responsibility assignment matrix might untie up those knots in the communication channel.

If there’s a problem with leadership overruling suggestions on how to advance the project and this is seen as a problem, it’s likely that the roles and responsibilities of the project team need refining. The responsibility assignment matrix defines who has authority to make decisions and using it or revisiting can determine if the right people are in that position.

In fact, any of the definitions might need reexamining at any phase in the project. Perhaps tasks are falling behind schedule. This could be because team members aren’t aware of what tasks they own. Anytime a delay occurs, returning to the assignment matrix is a good first step, even if you went through the process as you should during the planning stage of the project.

How to Create a Responsibility Assignment Matrix

The actual making of a responsibility assignment matrix is not as difficult as getting everyone on board with what their roles and responsibilities are.

Therefore, you want to include your team in the process, get their input and eventually buy-in without spending too much time and energy on the process. Follow these steps to make sure everyone is in agreement and you’ll have a successful responsibility assignment.

  • Identify all the participants involved in the project, from team members to stakeholders and everyone in between.
  • List all deliverables associated with the project. Use a work breakdown structure to make sure you don’t miss any.
  • Meet with team members on how to execute the tasks to create the deliverables. Every task needs to be discussed in terms of the team’s responsibility and authority.
  • Draft the responsibility assignment matrix using a table with the project tasks listed on the left-hand column. Across the top add the name of everyone in the project.
  • Where the tasks meet the project team member, assign whether they’re responsible, accountable, consulted or informed.
  • When completed, share the responsibility assignment matrix with the project team and stakeholders and hold a meeting if necessary to make sure everyone understands their part in the project. If you’re working in a shared space, print out a copy and post it.

Free Responsibility Assignment Matrix Template

Using a RACI template is a shortcut that sets up your team and the project for success. ProjectManager is more than an award-winning software that organizes tasks, teams and projects to streamline work and boost productivity, it’s also the online hub for all things project management.

Among the hundreds of blog posts, guidebooks and tutorial videos are dozens of free templates that can help you through every phase of your project’s life cycle. Using our free RACI template will help you guide all the project teams better, allowing them to know where they stand in relation to the project and what their level of responsibility and accountability is.

Use it at the start of the project to avoid delays and untangle any communicative knots that are preventing the project from progressing as planned. To keep your project on track, download our free RACI template and get a head start on building a workable responsibility assignment matrix.

RACI Matrix Template for Excel

Best Practices

Using our free RACI template is a good start, but you have to make sure you fill it in correctly. A responsibility assignment matrix is only as good as the effort put into creating it. Here are some best practices to apply when you’re in the process of building your assignment matrix.

  • Involve the team: They’re the ones who will be executing the work. You want their input and buy-in to avoid any costly mistakes or time-consuming questions about what wasn’t made clear at the beginning of the project.
  • Identify every single task: Identify all the tasks required to reach your final deliverable. Once you have that thorough list make sure that there is only one person on the team who is accountable.
  • Update your RACI regularly: Make sure that each new one is clearly marked as the most current version and is distributed to everyone on the team. There will be times when you’ll want to revisit the responsibility assignment matrix or changes in personnel will require an edit.
  • Share responsibility viably: One person shouldn’t have to shoulder the bulk of the responsibilities for the project and you want to give authority throughout the project team and not just among the very top management team.
  • Optimize tasks: Managers can use the RACI matrix to see if too many team members have been assigned to a task. Maybe these workers could be spread out for greater productivity. There could be too many people listed as consulted, which slows down the process. The assignment matrix is endlessly useful.

How ProjectManager Helps You Manage Projects Better

ProjectManager is a cloud-based tool that connects everyone in real-time to facilitate planning, monitoring and reporting on the project. It works to give everyone on the project team a job and the knowledge as to where they have authority and when to consult others, as well as defining the reporting process.

Let’s look at the people who are responsible, for example, the team who execute the project. Once invited into the software, you can share the project plan, assign them tasks, add detailed direction, add a deadline and tag for priority and more. The teams can then collaborate by attaching files and images to the tasks and commenting in real-time to work better together.

A screenshot of the Team collaboration user interface in ProjectManager

Those who need to stay informed of the project can do so by also getting invited into the project and sharing plans and schedules with them. Stakeholders can stay updated with reporting features that can generate reports on project variance, cost, time and more with one click. Then share them as a PDF. Reports can even be quickly filtered to zero in on the data stakeholders are interested in.

a screenshot of the status report generation screen in ProjectManager

The responsibility assignment matrix can help you reallocate your resources when things aren’t progressing as planned. Use our software to get further insight. The resource management features include a workload chart that’s color-coded so it’s easy to see who has too many tasks and who can take on more work. Then you can simply reallocate those resources from the workload page to help your team work more productively.

color-coded workload chart

ProjectManager gets you organized, keeps your team focused on their tasks and stakeholders in the loop. Gain efficiencies throughout every aspect of your project’s life cycle with an online Gantt chart to schedule work and kanban boards, a visual workflow feature that provides transparency into production. All that and it’s on a collaborative platform to keep everyone connected. Try ProjectManager today for free.

Click here to browse ProjectManager's free templates

Deliver your projects on time and on budget

Start planning your projects.

Drawing of Stakeholder map

Project Management Templates | FREE Downloads Word, Excel, PDF, Visio

  • Concise, focused guide that cuts through the clutter
  • Step-by-step instructions for creating a project plan in under a day
  • Master essential skills like work breakdowns and task sequencing
  • Real-world troubleshooting for 20 common scheduling challenges
  • Rapidly get up to speed if you're new to Microsoft Project
  • Includes glossary, support resources, and sample plans
  • Start planning like a pro
  • Get your copy today!

The cover of the book 'Essential Microsoft Project: The 20% You Need to Know'

Responsibility Assignment Matrix (RAM) Template | FREE Download

The Responsibility Assignment Matrix (RAM) shows 'who does what' on a work package or task. It is a popular tool because it shows what is expected of each member of the project team 'at a glance'. Scheduling tools like Microsoft project allow multiple resources to be linked to a task, but there is no easy way to show what each resource is expected to do - RAMs fill the gap. stakeholdermap.com
  • See a screenshot of the template
  • How to use the template
  • Download the Excel Template

Responsibility Assignment Matrix (RAM) Template

How to use the RAM template

  • Enter your project details on the first tab
  • Open the second tab named RAM
  • List your work packages down the left hand side (replacing Workpackage 1, 2, 3.. etc)
  • Enter the names of your project team in the columns. Replacing Person (1,2,3..)

Responsible

Accountable, what does raci stand for, what alternatives are there to raci, download the responsibility assignment matrix (ram) template, excel download - responsibility assignment matrix (ram) template (.xls), excel download - responsibility assignment matrix (ram) template (.xlsx), opendocument spreadsheet download - responsibility assignment matrix (ram) template (.ods), resource management plan template, resource planning template, resource requirements template, project templates to download.

  • Sample Project Charter - FREE example from a real software project
  • Excel Project Plan - FREE excel Gantt Chart template for project planning
  • WBS Checklist - Download a Free checklist for reviewing Work Breakdown Structures
  • Project Management Templates - View our collection of FREE templates for Project Managers
  • MS Project schedules - Get a ready made Microsoft Project Plan for your Project.
  • Risk Register template - Download a free Risk Register Template for managing your risks.
  • Software Project Plan - Get a ready Made Microsoft Project Plan for your Software Implementation Project.
  • Sample Statement of Work - Writing a SOW is challenging! That is why we are sharing this free example!
  • WBS examples - 22 Examples of real world Work Breakdown Structures.

Share this Image

sample responsibility assignment matrix (ram)

How to Make a Responsibility Assignment Matrix: Excel RACI Template

sample responsibility assignment matrix (ram)

What is a responsibility assignment matrix?

How to create a responsibility assignment matrix in excel, free raci template for excel, how to manage raci roles in your teamgantt plan.

A responsibility assignment matrix (RAM) is a tool used in project management to clarify team and stakeholder roles for each project step. It paves the way for smooth collaboration by ensuring everyone knows what they need to do, who they need to talk to, and who has the final say on key decisions and deliverables.

RACI—which stands for Responsible , Accountable , Consulted , Informed —is the most popular framework used for assigning roles and responsibilities on projects. Here’s a quick breakdown of RACI categories in basic terms:

  • Responsible : Who completes the work?
  • Accountable : Who makes decisions? 
  • Consulted : Who provides expertise?
  • Informed : Who needs status updates?

Of course, RACI isn’t the only responsibility assignment matrix out there. These RACI alternatives provide a small sample of other approaches you might come across in project management.

  • RASCI (or RASIC) matrix : This RACI alternative adds one extra role into the responsibility assignment mix. In the RASCI model, the S stands for Supportive . While this role covers anyone who will lend the Responsible person a hand with the work, a Supportive team member isn’t responsible for the outcome.
  • DACI matrix : DACI stands for Driver , Approver , Contributor , Informed and is used to outline decision-making roles and responsibilities for projects. In this framework, the project manager or leader typically serves as the Driver guiding the team to a decision.‍
  • RAPID responsibility matrix : RAPID stands for Recommend , Agree , Perform , Input , Decide and is another decision-making framework used to define authority vs accountability. The Recommend role kicks things off by suggesting an action, while the Decide role has the ultimate say in how things move forward. ‍
  • CARS : CARS stands for Communicate , Approver , Responsible , Support . In this model, Communicate combines RACI’s Consulted and Informed roles into a single assignment. Someone with the Communicate role lends their expertise and needs to be kept up-to-date on progress. The Approver is the main decision-maker who calls the shots.

Lay a clear path to success with a visual plan that’s easy to understand, and keep everyone in sync with flexible workflows and team collaboration.

sample responsibility assignment matrix (ram)

Lots of people use spreadsheets to make a responsibility assignment matrix for their projects, so let’s walk through the basic steps of building one in Excel, using the RACI framework as our model.

Looking for an online solution? See how TeamGantt's RACI feature integrates into your project plan.

1. List project tasks and deliverables in column A

First, make a list of all the work that needs to be done for your project down the left side of your matrix. Enter each project task, milestone, or decision in column A of your Excel worksheet. 

Feel free to group tasks by project phase like we’ve done in the screenshot below. That way, your RACI matrix is easy to scan and read.

Excel RACI Matrix Step 1 - List project tasks and deliverables

2. Add team members or project roles across row 1

Starting with column B, label each column header with the name of a team member and/or project role. 

Include the people who will execute and review work for the project, as well as any subject matter experts or stakeholders you may need to consult or keep in the loop along the way.

Excel RACI Matrix Step 2 - Add project role and team member names

3. Insert a new worksheet for roles and definitions

Click Insert > Insert Sheet from the Home ribbon at the top of your Excel workbook.

Excel RACI Matrix Step 3a - Insert new sheet for roles and definitions

Go to your new worksheet, and list each letter of the RACI acronym in column A. Then enter the corresponding role for each letter in column B. We also included RACI definitions in column C as a handy reference for anyone who might need a refresher.

Excel RACI Matrix Step 3b - Enter roles and definitions

You’ll use this worksheet to populate a drop-down list on the main RACI matrix tab to make it easier to assign roles quickly.

4. Add a drop-down list of roles to your matrix

Now, go back to your main worksheet, and click into the first open cell in your matrix.

On the ribbon, click Data > Data validation to insert a drop-down list with RACI roles.

Excel RACI Matrix Step 4a - Click Data Validation

On the Settings tab, choose List under the Allow menu.

Excel RACI Matrix Step 4b - Select allow list setting

Click into the Source field, then highlight the data range with your options from the RACI Roles & Definitions worksheet you set up in Step 3. We highlighted cells A2-A5 in our example.

Excel RACI Matrix Step 4c - Select data source

Verify your Data validation settings are correct, then hit Enter to add the drop-down list to your selected cell.

Excel RACI Matrix Step 4d - Confirm data validation settings

Copy and paste that cell to apply the drop-down list to other cells in your RACI matrix worksheet.

5. Color-code assignments with conditional formatting

Click Conditional Formatting > New Rule on the Home tab. Select Classic > Format only cells that contain > Specific text > containing . Enter the letter R in the text box, then choose Custom Format , and apply a background color (and any other styles you want). 

Repeat this step for each additional letter in the acronym.

Excel RACI Matrix Step 5 - Color-code responsibility assignments with conditional formatting

6. Assign a RACI value to everyone on every task

You’re almost there! Now go down the list of tasks on your responsibility assignment matrix, and assign a role to every person who will be involved in that project step or deliverable.

Excel RACI Matrix Step 6 - Assign a role to everyone on every task

Want to build a responsibility assignment matrix of your own, but don't want to start from scratch? Download our ready-made Excel template for free. This blank RACI template is fully editable, so you can customize it for any project you manage. 

We added drop-downs for assigning RACI roles more easily and included a RACI chart example tab as reference in case you need a little extra guidance.

Download: RACI matrix template for Excel

Free RACI Template for Excel by TeamGantt

You can easily upload your final matrix to your TeamGantt project . But if you don’t want to worry about outdated spreadsheets that get forgotten once work begins, why not assign RACI roles directly to your plan?

Here’s how to use TeamGantt’s online RACI feature for your next project.

Assigning RACI roles and responsibilities to TeamGantt tasks

  • Open your project, and toggle to the RACI tab. This will display all your project tasks in a list format (rows). On the right side of the matrix, you’ll see a column for each person currently invited to the project with cells for each task in the project. 
  • Click the cell below each person who needs to be assigned a role on a task, and choose one of the RACI options from the drop-down.

Screenshot of TeamGantt's built-in RACI matrix for assigning task responsibilities

Viewing RACI matrix assignments for your project

There are 2 simple ways to view RACI assignments in TeamGantt:

  • From the Gantt tab : If someone is assigned to a task and has a RACI role on that task, the RACI value will appear in parentheses next to that person’s name on the gantt chart. Just be aware that you won’t see RACI assignments for people who haven’t been assigned to a specific task in Gantt view.

Screenshot of RACI roles in a TeamGantt timeline

  • From the RACI tab : To access your project’s full RACI matrix, simply toggle to the RACI tab for that project. You’ll find RACI assignments for every person playing a role—whether or not they’re the one responsible for doing the work.

Screenshot of the RACI tab in a TeamGantt project

Keep teams in sync—and accountable—with TeamGantt

A responsibility assignment matrix is a simple tool that makes projects easier to manage by creating less confusion and more accountability. But you’ve got more than roles and responsibilities to keep straight.

TeamGantt makes it easy to build a project plan your whole team can contribute to and collaborate on. Everything happens online, so you can stay on top of deadlines and monitor progress in real time.

Use our built-in RACI chart to assign roles and keep them visible from project start to finish, so everyone knows how they contribute to success.

Try TeamGantt’s Pro Manager plan free for 30 days!

sample responsibility assignment matrix (ram)

AcqNotes

The Defense Acquisition Encyclopedia

Program Management

A Responsibility Assignment Matrix (RAM) describes the participation of various organizations, people, and their roles in completing tasks or deliverables for a project. The Program Manager (PM) uses it to clarify roles and responsibilities in a cross-functional team , projects, and processes. A RAM has four primary assignments: Responsible , Accountable , Consulted , and Informed (also called a RACI matrix).

Definition: A Responsibility Assignment Matrix (RAM) describes the role and responsibilities of various people and/or organizations in completing specific tasks for a project.

Responsible, Accountable, Consulted, and Informed (RACI) Matrix

A RAM is called a Responsible, Accountable, Consulted, and Informed (RACI) matrix. The PMBOK Guide 4th Edition defines RACI as a RAM that illustrates the connections between work packages or activities and project team members. In fundamental terms, RAM refers to the framework in place to distribute duties to individuals where, in a RACI, each team member is assigned a role based on one of the four roles. On larger projects, RAMs can be developed at various levels.

  • Responsible (R): Those who do the work to achieve the task. There is typically one role with a participation type of responsibility, although others can be delegated to assist in the work required.
  • Accountable (A): The one ultimately accountable for the correct and thorough completion of the deliverable or task, and the one to whom Responsible is accountable. In other words, an Accountable must sign off (Approve) on work that Responsible provides. There must be only one Accountable specified for each task or deliverable.
  • Consulted (C): Those whose opinions are sought and with whom there is two-way communication.
  • Informed (I): Those who are kept up-to-date on progress, often only on completion of the task or deliverable, and with whom there is just one-way communication.

Benefit of Utilizing a Responsibility Assignment Matrix (RAM)

The RAM holds substantial advantages for project managers by clarifying the importance of their processes within the team. It fosters a sense of collective contribution among all employees, eliminating the sense of isolation. This project management technique, the RAM, empowers every team member to grasp the broader context of their work. Instead of simply instructing an administrative assistant to collect phone numbers without context, you can refer them to this valuable resource. By using the RAM, employees become more engaged in achieving positive results as they comprehend the alignment of their contributions with the company’s overall operations.

Responsibility Assignment Matrix (RAM) Goal in Project Management

A RAM is used in project management as a communication tool to ensure that work tasks are designated as a responsible agent. A RAM can define what a project team is responsible for within each component of the Work Breakdown Structure (WBS) . It could also be used within a working group to designate roles, responsibilities, and levels of authority for specific activities. The matrix format shows all activities associated with one person and all people associated with one activity. This ensures that only one person is accountable for any task to avoid confusion.

Responsibility Assignment Matrix (RAM) Tutorial

Responsibility Assignment Matrix (RAM) Standard Format

A RAM is displayed as a chart that illustrates the interaction between work packages that need to be done and project team members. Typically, the list of objectives is on the left-hand column with the project team member names across the top. Each work package will be assigned to the appropriate project team member. The chart aids in communication among the project team members.

No one should typically have more than one degree of responsibility for any given deliverable or activity group in the RAM chart. To simplify things, we’ve assigned each participant in this scenario a certain amount of commitment. However, there is frequently white space when you create a genuine model for more than four people. In some situations, it’s okay to have someone with secondary responsibility but not primary.

Responsibility Assignment Matrix (RAM) Template

Template: responsibility assignment matrix (ram) (excel), 6 steps to developing a responsibility assignment matrix (ram).

Below is a list of the 6 (six) most common steps in developing a Responsibility Assignment Matrix (RAM).

  • Step 1: List all project tasks and deliverables
  • Step 2: Identify all project stakeholders
  • Step 3: Determine the responsibility and accountability level for each task and deliverable
  • Step 4: Assign stakeholders to each task
  • Step 5: Assign overall stakeholder
  • Step 6: Ensure all stakeholder know their responsibility

Developing Responsibility Assignment Matrix (RAM) Matrix Best Practices

Below is a list of best practice topics that can help Program Managers effectively build and use a Responsibility Assignment Matrix.

  • One stakeholder is in charge per task.
  • The least amount of people accountable, the better.
  • Be Efficient with Meetings.
  • Constant Communication.
  • Stakeholders agree on final RAM

Responsibility Assignment Matrix (RAM) Lessons Learned

A Responsibility Assignment Matrix (RAM) is a tool used in project management to identify and clarify the roles and responsibilities of the different people or groups working on a project. The goal of making a RAM is to make sure that all tasks are done and that responsibilities don’t overlap or get missed. Here are some things you can learn to make sure your RAM is built right:

  • Define the project’s goals and scope in detail:  Before making a RAM, it’s important to have a clear idea of the project’s goals and scope. This will help make sure that all necessary tasks are included and that the responsibilities are in line with the overall project goals.
  • Find out who all the stakeholders are and what their roles are:  A RAM should have a list of all the people or groups involved in the project, such as internal team members, external partners, and customers. There should be roles and responsibilities for each stakeholder.
  • Give each stakeholder specific tasks and responsibilities:  Instead of giving each stakeholder a general role, it is important to give them specific tasks and responsibilities. This will help make sure that no one’s responsibilities get mixed up or left out.
  • Make sure that all stakeholders know about and understand the RAM:  It is important to make sure that all stakeholders know about and understand the RAM. This can be done by having regular meetings and giving updates, as well as by putting the RAM in writing.
  • Review and update the RAM often: As the project moves forward, it may be necessary to review and update the RAM. This can help make sure that the RAM stays correct and helps the project reach its goals.

Difference Between a Responsibility Assignment Matrix (RMA) and a Responsible, Accountable, Consulted, and Informed (RACI) Matrix

The PMBOK Guide 4th Edition defines RACI as a RAM that is used to illustrate the connections between work packages in a Work Breakdown Structure (WBS) and project team members. The difference between a RAM matrix and RACI matrix is:

  • A Responsibility Assignment Matrix (RAM) describes the participation of various organizations, people, and their roles in completing tasks or deliverables in a Work Break Down Structure (WBS) for a project.
  • A Responsible, Accountable, Consulted, and Informed (RACI) matrix is used on projects where multiple groups of people as assigned a task. It helps on larger projects with a lot of people and organizations. It also helps with outside stakeholders and their responsibilities on a project.
  • A RACI can have multiple RAM within it.

AcqLinks and References:

  • Template: Responsibility Assignment Matrix (RAM) Template (Word)
  • Template: Responsibility Assignment Matrix (RAM) Template (Excel)

Updated: 1/11/2024

Leave a Reply

You must be logged in to post a comment.

sample responsibility assignment matrix (ram)

banner-in1

  • Project Management

Responsibility Assignment Matrix: Template, Example & Benefits

Home Blog Project Management Responsibility Assignment Matrix: Template, Example & Benefits

Play icon

Your team is the most crucial resource in completing a job. They must adhere to the project's schedule and budget. Controlling the project requires everyone involved to understand their roles and duties when carrying out tasks and accomplishing project objectives. How can all the participants in a project be coordinated so that they are aware of what they are doing and do not prevent others from carrying out their tasks? An assignment of responsibility matrix can be useful.

Your project will have a productive crew thanks to an assignment matrix. You can take an online PMP course to learn the details included in RAM, Responsibility Assignment Matrix in project management, and Responsibility Assignment Matrix example, to advance your career.

What is a Responsibility Assignment Matrix in Project Management?

So, what is the responsibility assignment matrix?  A Responsibility Assignment Matrix (RAM), sometimes referred to as a RACI chart or RACI matrix, in project management identifies all relevant stakeholders and specifies roles for cross-functional teams and their level of involvement in a project. Each letter in the acronym RACI, which stands for Responsible, Accountable, Consulted, and Informed, refers to a different team member in the Responsibility Assignment Matrix in Project Management.

1. Responsible

The team member that oversees finishing the assignment is the person responsible for the RAM, Responsibility Assignment Matrix. The person in charge may be tasked with gathering all the visual and data assets required to put together the presentation if your team is working on a pitch deck (Responsible for executing the task).

2. Accountable

The responsible team member distributes the tasks to the other team members and ensures that they are finished accurately and on time. This team member oversees making sure the project is completed on schedule and that the tasks are fairly distributed among the accountable parties (Has governing & directing authority).

3. Consulted

A responsible party in Responsibility Assignment Matrix Project Management may frequently need to consult an expert, who serves as the consulted person, to finish certain responsibilities. A professional analysis of the consulted party is required when someone is tasked with gathering marketing statistics for a presentation. They also need to ensure that the data the responsible party is required to submit is accurate (Provide insights, analysis or expert judgment).

4. Informed

The informed party needs to be aware of when the major project components are finished even though they may not be directly involved in all the steps to ensure that everything is running smoothly. The informed team member must be aware of any delays or stalls in the project as they must complete their tasks (Updated with project information and outcome).

Responsibility Assignment Matrix in Project Management

Responsibility Assignment Matrix (RAM) Goal in Project Management

The goal of the Responsibility Assignment Matrix (RAM) is to clearly define roles and responsibilities of everyone on a project team. This ensures that everyone understands their role and how it fits into the bigger picture. RAM also allows for quick identification of whom to contact when an issue arises. It might also be applied within a working group to establish authority levels, roles, and duties for tasks.

The matrix format displays each person's associated actions and each person's associated people. To avoid confusion, this makes sure that there is only one person responsible for each task. It is also important to outline the dates and reminders for each participant, so that they are aware of their deliverables/plans to fulfill the deliverables. The best Project Management Certification programs online will teach you how to make efficient decisions and effectively use RAM.

How to Create a Responsibility Assignment Matrix?

A Responsibility Assignment Matrix (RAM) is a table that shows the tasks needed to be completed as part of a project, who is responsible for each task, and when the task needs to be completed. Making a matrix to distribute responsibilities is not as challenging as getting everyone on board with their respective jobs and responsibilities.

You should therefore involve your staff in the process, receive their feedback, and eventually secure their buy-in without expending excessive time and effort on it. You will have a successful responsibility assignment if you follow these instructions to ensure that everyone is on the same page. 

  • List every person involved in the project, including the team, stakeholders, and everyone in between.
  •  List each project deliverable that you can think of. To make sure you do not overlook any, use a work breakdown framework.  
  •  To discuss how to carry out the tasks and produce the deliverables, meet with the team members. The duty and authority of the team for each assignment must be discussed.
  •  Utilizing a table with the project tasks specified in the left-hand column, create a Responsibility Assignment Matrix. Print the names of everyone involved in the project across the top.
  • Assign whether a project team member is liable, accountable, consulted, or informed where the tasks meet them.  
  •  Share the completed Responsibility Assignment Matrix Template Word with the project team and stakeholders. If necessary, conduct a meeting to ensure that everyone is aware of their responsibilities for the project. Print a copy, and if you are working in a common location, post it.

Developing Responsibility Assignment Matrix (RAM) Best Practices

The best practices for developing a Responsibility Assignment Matrix (RAM) will vary depending on the specific project and organization. However, some tips on how to develop a RAM matrix effectively include the following:

  • Define the project scope and objectives clearly, so that all stakeholders understand the parameters of the project and what is expected to be accomplished.
  • Assign clear roles and responsibilities to individuals and teams so that everyone knows who is responsible for what aspect of the project.
  • Make sure that the Responsibility Assignment Matrix PMP is kept up to date as the project progresses so that everyone is aware of any changes in roles and responsibilities.
  • Use the RAM matrix as a tool to help identify potential risks and issues related to the project so that they can be addressed early on.
  • One stakeholder leads a task.
  • The lesser number of people are accountable, the better.
  • Act efficiently with meetings.
  • Continuous communication.
  • Stakeholder agreement on final RAM.

Responsibility Assignment Matrix Examples and Templates

  • Responsibility Assignment Matrix (RACI) 
  • RACI-VS (Responsible, Accountable, Consulted, Informed- “V”erification and “S”ign off)
  • RASCI (Responsible, Accountable, Support, Consulted, Informed)
  • RAC (Responsible, Accountable, Consulted)
  • ARCI (Accountable, Responsible, Consulted, Informed)
  • RATSI (Responsibility, Authority, Task, Support, Informed)
  • PACSI (Perform, Accountable, Control, Suggest, Informed)
  • RACIQ (Responsible, Accountable, Consulted, Informed, Quality Review)
  • DACI (Driver, Approver, Contributors, Informed)
  • CAIRO (Consulted, Accountable, Informed, Responsible, Omitted)

sample responsible assignment matrix - RACI

Downloadable Responsibility Assignment Matrix Template Excel

Download the Responsibility Assignment Matrix Template (xlsx) here!

This Responsibility Assignment Matrix template is available for free in both Excel and OpenDocument Spreadsheet formats. The template can be completely modified using Microsoft Excel and adjusted to meet the needs of your project. To make it simple to understand what is required of each worker on each task, the template employs conditional formatting to change the color of each cell.

Download a Printable Responsibility Assignment Matrix PDF

Download the Responsibility Assignment Matrix Template (PDF) here!

If you intend to design a Responsibility Assignment Matrix (RAM), you may require samples and templates to use as a guide, regardless of whether you are managing an event, a construction project, or a restaurant. Some of the templates are-

  • Responsibility Assignment Matrix Sample
  • Responsibility Assignment Matrix for Construction Project Template
  • Basic Responsibility Assignment Matrix Sample
  • Responsibility Assignment Matrix in PDF

Benefits of Responsibility Assignment Matrix

There are many benefits of the Responsibility Assignment Matrix. One benefit is that it helps to ensure that everyone on a project team understands their roles and responsibilities. This can help to prevent misunderstandings and conflict between team members. Another benefit of using RAM is that it can help to improve communication between team members.

By clearly defining roles and responsibilities, team members will know whom to go to for specific information or tasks. This can help to avoid confusion and delays. Lastly, RAM can help to improve project management by providing a clear overview of who is responsible for what. This can help project managers to identify potential problems or areas where there may be a lack of resources.

Top Cities where Knowledgehut Conduct Project Management Certification Training Course Online

Unlock your potential as a Scrum Master with our game-changing certified scrum master course . Acquire the skills, knowledge, and confidence to effectively lead agile teams. Join us now and pave your way to success!

A Responsibility Assignment Matrix (RAM) is a tool used to identify and define the roles and responsibilities of individuals and groups within an organization. It is a means of clarifying who is responsible for what and ensuring that everyone understands their roles and responsibilities. RAM can be used to create accountability and ownership for tasks and projects, and to identify potential areas of conflict.

It is a valuable tool for effective project management and can help to ensure that everyone involved in a project is aware of their roles and responsibilities. It can also help to identify potential areas of conflict and ensure that tasks are properly assigned. The KnowledgeHut online PMP course will give you an insight into the Responsibility Assignment Matrix and can be a helpful tool for any project manager.

Frequently Asked Questions (FAQs)

1. what is included in a responsibility assignment matrix.

A Responsibility Assignment Matrix (RAM) is a tool used to help define and assign roles and responsibilities for a project or process. The matrix typically includes a list of tasks or deliverables and the people or groups responsible for each. 

2. What can a Responsibility Assignment Matrix (RAM) eliminate?

RAM eliminates ambiguity and confusion over who is responsible for what on a project. It also provides a clear overview of who is responsible for each task, making it easier to hold team members accountable.

3. What does a Responsibility Assignment Matrix not show?

The duty assignment matrix links resources to the tasks or work packages they must do, but it does not indicate when they will be required to do their work.

Profile

Kevin D.Davis

Kevin D. Davis is a seasoned and results-driven Program/Project Management Professional with a Master's Certificate in Advanced Project Management. With expertise in leading multi-million dollar projects, strategic planning, and sales operations, Kevin excels in maximizing solutions and building business cases. He possesses a deep understanding of methodologies such as PMBOK, Lean Six Sigma, and TQM to achieve business/technology alignment. With over 100 instructional training sessions and extensive experience as a PMP Exam Prep Instructor at KnowledgeHut, Kevin has a proven track record in project management training and consulting. His expertise has helped in driving successful project outcomes and fostering organizational growth.

Avail your free 1:1 mentorship session.

Something went wrong

Upcoming Project Management Batches & Dates

Course advisor icon

loading

How it works

For Business

Join Mind Tools

Article • 6 min read

The Responsibility Assignment Matrix (RAM)

Knowing where the buck ultimately stops.

By the Mind Tools Content Team

sample responsibility assignment matrix (ram)

It takes a lot of effort to keep a large project running smoothly. With a large number of variables, people, and deliverables, it’s hard to keep on top of everything that’s happening. Consider the following scenario:

Hal (the distressed project manager): "What do you mean, we don’t have the test results yet?! What has Katy been doing? Get Katy!"

Katy: "No, Hal, I wasn’t responsible for getting that done. Joan has more expertise in that area, remember? I’ll ask Joan what happened."

Joan: "Gee, Katy, I know I have more experience with these reports, but I was waiting for you to contact me so we could review them together."

Do you recognize anyone you know? This type of situation is repeated daily in organizations across the globe. And most of the time, there’s no incompetence or bad intentions involved. More often, problems like this are the result of inadequate planning and poor communication.

Successful projects have a clear breakdown of who is ultimately responsible for each aspect of the project. Without clear, written, and agreed-upon accountability, it’s far too easy to for communication to fail and for responsibilities to be muddled.

So how do you avoid this?

Developing a Responsibility Assignment Matrix

One tool that project managers use to keep these assignments clear is the Responsibility Assignment Matrix (also called the RAM, or the Responsibility Matrix). This matches deliverables with the people who are responsible for them. For every piece of the project, the matrix shows who needs to contribute what for the project to be completed.

For example, let’s say that you’re upgrading your customer service delivery system, and you need to train your staff to use new procedures and tools.

Step One: Define Your Deliverables

Using a Work Breakdown Structure , you define three key deliverables for this training project, with a few subcategories for each:

  • Survey current practice.
  • Define new practice.
  • Locate resources.
  • Prepare training schedule.
  • Manage training.
  • Re-survey practices after implementation.
  • Analyze results.

sample responsibility assignment matrix (ram)

A Work Breakdown Structure (WBS) is a project planning tool used to break a project down into smaller, more manageable pieces of work (deliverables). It's not a list of every task: rather, it's a "tree" structure showing the meaningful groups of activities that make up the main segments of the project.

Step Two: Identify the People Involved

Map out who is on your project team. By creating a chart of individuals who are available, you can then delegate work assignments based on expertise, and you can recruit talent that you’re missing. This step is often called an “Organization Breakdown Structure” because it creates an organizational chart for your team.

sample responsibility assignment matrix (ram)

Step Three: Create Your Responsibility Matrix

Draw a matrix. The deliverables are the column headings, and the people are the row titles.

With your team, determine accountabilities as well as other levels of involvement for each item in your Work Breakdown Structure.

A useful framework to determine role assignments is RACI . This defines four levels of involvement:

R = Responsible (People who do the work). A = Accountable (People who make sure the work gets done). C = Consulted (People who provide input before and during the work). I = Informed (People who are kept informed of progress).

Project Management Institute, "A Guide to the Project Management Body of Knowledge (PMBOK Guide)" – Fifth Edition, (2013). Copyright and all rights reserved. Material from this publication has been reproduced with the permission of PMI.

Other levels of involvement may include “assist”, “coordinate”, “sign off”, and “review”. You can decide how to assign responsibility for your project and your team. But you must be sure that ultimate accountability and responsibility for performing the work are agreed upon and communicated.

Step Four: Communicate

When your Responsibility Assignment Matrix is complete, communicate it to all stakeholders. It’s a good idea to post it in an area where people will see it. Used effectively, the RAM helps people understand what they should be doing at all stages of the project.

Project teams can easily lose focus on what needs to be done and who needs to do it. People may assume that somebody else is doing something – and before long, key pieces of work fall behind schedule.

To avoid this common problem, consider developing a Responsibility Assignment Matrix for your team. This matrix clearly identifies which role each team member has agreed to take on for each of the project’s main deliverables.

With these assignments, you can eliminate miscommunication about who’s doing what – and you can help to ensure that your project is successful.

You've accessed 1 of your 2 free resources.

Get unlimited access

Discover more content

Questioning techniques.

Asking Questions Effectively

What Causes Conflict in Teams?

Explore the Different Causes of Conflict That Can Arise Within Teams

Add comment

Comments (0)

Be the first to comment!

Sign-up to our newsletter

Subscribing to the Mind Tools newsletter will keep you up-to-date with our latest updates and newest resources.

Subscribe now

Business Skills

Personal Development

Leadership and Management

Member Extras

Most Popular

Latest Updates

Article az45dcz

Pain Points Podcast - Presentations Pt 2

Article ad84neo

NEW! Pain Points - How Do I Decide?

Mind Tools Store

About Mind Tools Content

Discover something new today

Finding the Best Mix in Training Methods

Using Mediation To Resolve Conflict

Resolving conflicts peacefully with mediation

How Emotionally Intelligent Are You?

Boosting Your People Skills

Self-Assessment

What's Your Leadership Style?

Learn About the Strengths and Weaknesses of the Way You Like to Lead

Recommended for you

Top 10 confidence hacks.

Turn ‘I can’t’ Into ‘I can’ With These Ten Simple Tips

Business Operations and Process Management

Strategy Tools

Customer Service

Business Ethics and Values

Handling Information and Data

Project Management

Knowledge Management

Self-Development and Goal Setting

Time Management

Presentation Skills

Learning Skills

Career Skills

Communication Skills

Negotiation, Persuasion and Influence

Working With Others

Difficult Conversations

Creativity Tools

Self-Management

Work-Life Balance

Stress Management and Wellbeing

Coaching and Mentoring

Change Management

Team Management

Managing Conflict

Delegation and Empowerment

Performance Management

Leadership Skills

Developing Your Team

Talent Management

Problem Solving

Decision Making

Member Podcast

  • Memberships

Responsibility Assignment Matrix (RAM)

Responsibilty Assignment Matrix - Toolshero

Responsibility Assignment Matrix: this article explains the Responsibility Assignment Matrix in a practical way. After reading you will understand the basics of this powerful project management tool used by management professionals. This article also contains a downloadable and editable Responsibility Assignment Matrix template and a free in-depth explanation video.

What is the Responsibility Assignment Matrix or RAM?

Project managers like using a RAM to identify the role of the various members of a project team. This matrix is a structural chart in which is visually made clear (on paper or through project management software ) what should be done by whom in cross functional or departmental projects.

In the matrix it is clear what the project tasks, roles and responsibilities are of each of the project team members. It is also referred to as the RACI matrix , VERI matrix or Linear Responsibility Chart (LCR).

Free Toolshero ebook

It’s often used as an integral part of the Work Breakdown Structure .

RAM video (1-Minute Skill Booster)

Our 1-Minute Skill Booster below will help you get a quick overview on the RAM and at the end of this article you will find an in-depth video on this project management tool.

Responsibility Assignment Matrix example

Despite the simple nature of all information in the matrix memory, it can be very time-consuming to assign each member of the project team with the right tasks and responsibilities.

In addition the appropriate roles must be defined in advance before they are included in the RAM.

RACI Matrix example - toolshero

Figure 1 – The Responsibility Assignment Matrix (RAM) / RACI Matrix

To do this well and accurately, the matrix can be completed using the following steps:

  • Step 1: Identify all the participants and (facilities) supporters of the project.
  • Step 2: Identify all the deliverables for the project.
  • Step 3: Discuss with all team members how they can support each other to achieve the best performance. It is important to define each participant’s responsibilities so that there will be no misunderstandings on who is responsible for completing the tasks at hand.
  • Step 4: The initial draft of the RAM is created, with the activities in the left-hand column and the team members in the project in the first right-hand column. Enter the roles that each person will have in the cells that have been formed. An example of this can be seen in the form of a RACI chart (Responsible, Accountable, Consulted and Informed) above. Note that only one person can be accountable for each task.
  • Step 5: Have the participants in the project approve the RAM (in writing). Again to prevent misunderstandings.
  • Step 6: Any remarks on changes in the RAM can be filed by the participants in writing. Finally, the responsibility assignment matrix will be reviewed and after approval has been obtained, the project can start.
  • Step 7: Interim assessment is important. When it appears that it is better to adjust the RAM, you will have to go back to step 3 and the adjustments must be discussed with all team members.

Responsibility Assignment Matrix and complex projects

The RAM is also suitable for complex projects. When activities are overlooked and the matrix contains incomplete and/or inaccurate information, this will lead to duplicated efforts.

It is therefore advisable to ensure that all information is included in the matrix and that all information is and remains accurate.

The following suggestions contribute to a larger chance of success of a matrix in a complex project:

1. Hierarchy of charts

Divide the RAM into separate graphs so that a distinction can be made according to priorities .

The RAM with the highest levels identifies the high-priority activities within the project.

From this point RAM-graphs can be developed that have been derived from this higher level.

2. Involvement

By involving all the members of the project team in the development of the RAM, they will know exactly what is expected of them and they will participate and be (more) committed to using their own specializations.

3. Written representation

By putting the RAM in writing, any mistakes or problems can be identified.

Moreover, the participants in the project will have a better understanding of what their joint participation in the project is.

Role identification

In a RAM the role of the individual and the role of the group are not separated. The role describes the participation with accompanying tasks of the individual in the project.

Such a role can be performed by several people in a group.

Vice versa, one person may have several roles in the project. This is why several employees can have the role of project manager and one individual may have the role of manager and task performer.

Responsibility Assignment Matrix template

Start visualizing what the tasks and responsibilities are of each team member with this ready to use RAM template.

Download the Responsibility Assignment Matrix template

Responsibility assignment matrix (ram) video (in depth-explainer).

Watch the in-depth video below for a recap of what you’ve just read, so you will remember it more easily!

Join the Toolshero community

It’s Your Turn

What do you think? Is the Responsibility Assignment Matrix in today’s modern project- and stakeholder management? Do you recognize the practical explanation or do you have more additions? What are your success factors for good stakeholder management during a project?

Share your experience and knowledge in the comments box below.

More information

  • Project Management Institute (2010). A Guide to the Project Management Body of Knowledge ( PMBOK Guide) . PMI Standards Committee.
  • Baker, D. (2009). Multi-Company Project Management: Maximizing Business Results Through Strategic Collaboration . J Ross.
  • Cleland, D. and Ireland, L. (2006). Project management: strategic design and implementation . McGraw-Hill .

How to cite this article: Mulder, P. (2012). Responsibility Assignment Matrix (RAM) . Retrieved [insert date] from Toolshero: https://www.toolshero.com/project-management/responsibility-assignment-matrix/

Original publication date:: 03/26/2012 | Last update: 02/28/2024

Add a link to this page on your website: <a href=”https://www.toolshero.com/project-management/responsibility-assignment-matrix/”>Toolshero: Responsibility Assignment Matrix (RAM)</a>

Did you find this article interesting?

Your rating is more than welcome or share this article via Social media!

Average rating 4.3 / 5. Vote count: 4

No votes so far! Be the first to rate this post.

We are sorry that this post was not useful for you!

Let us improve this post!

Tell us how we can improve this post?

Patty Mulder

Patty Mulder

Patty Mulder is an Dutch expert on Management Skills, Personal Effectiveness and Business Communication. She is also a Content writer, Business Coach and Company Trainer and lives in the Netherlands (Europe). Note: all her articles are written in Dutch and we translated her articles to English!

Related ARTICLES

Project Scope Control - toolshero

Scope Control for effective Project Management

Request for proposal rfp - Toolshero

Request for Proposal (RFP): Definition and Basics

Blueprint - Toolshero

Blueprint explained including the meaning

Project Budget - Toolshero

Project budget explained: theory and a template

business requirements analysis toolshero

Business Requirements Analysis Framework and Steps

stakeholder management toolshero

Stakeholder Management: Theory and Strategy

Also interesting.

Organizational Culture Model Schein - Toolshero

Schein’s Model of Organizational Culture

Decision Tree Analysis - Toolshero

Decision Tree Analysis: the Theory and an Example

MoSCoW Method - toolshero

MoSCoW Method of Prioritization explained

Leave a reply cancel reply.

You must be logged in to post a comment.

BOOST YOUR SKILLS

Toolshero supports people worldwide ( 10+ million visitors from 100+ countries ) to empower themselves through an easily accessible and high-quality learning platform for personal and professional development.

By making access to scientific knowledge simple and affordable, self-development becomes attainable for everyone, including you! Join our learning platform and boost your skills with Toolshero.

sample responsibility assignment matrix (ram)

POPULAR TOPICS

  • Change Management
  • Marketing Theories
  • Problem Solving Theories
  • Psychology Theories

ABOUT TOOLSHERO

  • Free Toolshero e-book
  • Memberships & Pricing

Business growth

Business tips

RACI model: A map for team structure (with template)

Hero image with an icon of a Gantt chart for product roadmaps and project management

A few weeks back, in a burst of misguided optimism, I found myself in an escape room with eight of my most brilliant friends. I was confident we'd bust out in record time, but we quickly realized our error: too many cooks, not enough coordination.

We really could have used RACI. The RACI model—which stands for responsible, accountable, consulted, and informed—would have gotten us the Instagram-worthy escape time we'd hoped for. This project management model ensures that there are clear roles, no conflicting ideas, and a clear communication process. Here, I'll unpack the RACI model and how it can streamline potentially chaotic projects—and perhaps save you from your own escape room disaster.

Table of contents:

What is the RACI model?

The RACI model, sometimes called a responsibility assignment matrix (RAM), is a project management tool for assigning roles and responsibilities to the various stakeholders of a project. Think of it as a roadmap for who's doing what. It's the secret ingredient to making sure your projects don't implode in a fiery mess of miscommunication, redundant work, and misalignment.

RACI is an acronym that stands for responsible , accountable , consulted , and informed . Let's break each of those down.

Responsible: This is the person who's actually doing the thing. Think creatives, developers, analysts, and other worker bees. If we're talking about making a sandwich, this is the person slapping the mayo on the bread.

Accountable: Typically in a leadership position, this is the person who's got the final say. If that sandwich ends up being terrible, this is who you send it back to.

Consulted: These are the folks you chat with before making decisions. Like, "Hey, do you think we should add pickles to this?" They give input, but they're not in the kitchen with you. In the work world, we're talking about people like subject-matter experts, legal teams, and quality assurance teams.

Informed: These people are just here for the updates. "Just so you know, we're going with pickles." Informed parties can include external stakeholders, end users, senior management, or anyone else who needs to know what's happening but isn't directly involved in the action.

Importantly, RACI isn't just for the overarching project—it's applied to each individual task within that project. You'll document your RACI roles in a RACI chart to be sure everything's clear and transparent—more on that below.

Graphic explaining what RACI stands for.

Why you need a RACI matrix

There's nothing worse than finding multiple people doing the same thing while working on a project, or neglecting an important task because everyone thinks it's not their job.

RACI is a management tool that helps distribute tasks and assign responsibilities in a clear and transparent way. It helps people know where to go for information or approval, prevents people from passing the buck, and makes sure everyone is clear on their primary responsibilities. 

Key RACI benefits include:

Clearly defines responsibilities and expectations: No more "Well, finance said it was ready to ship..." moments. Everyone knows their role, and there's no stepping on toes.

Reduces workflow confusion: It's like having a map in a maze. You know exactly where to go and what to do without running into dead ends or, worse, minotaurs.

Enhances understanding and clarity: Because there's always someone accountable, decisions are decisive, and responsibilities are unmistakably defined. It's like translating everyone's thoughts into a universal language where "I thought you meant..." becomes a phrase of the past. 

Flexible approach: RACI works for almost any project type. Whether setting up a new server or orchestrating a multi-channel marketing campaign, the RACI model can be tailored to fit your needs.

When should you use a RACI matrix?

You might ask yourself, "Self, how do I know when a RACI matrix is needed?" Let's sort that out.

Examples of projects where you should use RACI:

Office relocation: Ever tried moving your entire workspace without losing your favorite mug? Or your sanity? Who has the authority to choose the new location? If there's an issue with the new space, who's the point of contact? And before finalizing the seating arrangement, who should be consulted? RACI delegates tasks and defines the decision-making flow, ensuring a seamless transition.

Event planning: Organizing a corporate event or conference involves many moving parts. Who has the final say on the venue? Who gives approval when you need to know if karaoke is a yea or nay? And who should be consulted when deciding between a taco bar or sushi rolls? RACI helps you streamline the communication and decision-making processes.

Examples of projects where you shouldn't use RACI:

Simple tasks: If the task is straightforward, like "get more coffee filters for the break room," you probably don't need a matrix.

Short-term projects: If you're whipping up something quickly with a small team, the time spent creating a RACI might outweigh its benefits.

Well-established processes: For routine tasks that the team has been performing for years, introducing a RACI matrix is probably overkill.

What should a RACI matrix include?

Image of a RACI matrix example and key components (tasks, roles, responsibilities, and accountabilities)

A RACI chart has a specific structure. It's not just about listing out people's roles—to be effective, it needs a few other components.

Key components of a RACI matrix include:

Tasks: These are the specific activities or steps that need to be accomplished throughout the project. They form the backbone of the matrix, clarifying what needs to be done. Think of them as the items on your to-do list.

Roles: This refers to the individuals or teams involved in the project. From team members to stakeholders, this is everyone who's got some skin in the game.

Responsibilities: This is the nitty-gritty of who does what. It's where you hand out the jobs. Like, "Hey, you! You're on lead gen duty."

Accountabilities: This is the "buck stops here" role. It's about ownership, pinpointing who is ultimately answerable for the completion and quality of each task.

How to create a RACI matrix

Now that you know what RACI is, it's time to unpack the step-by-step process of crafting your own RACI matrix.

Map out the project landscape: Begin by pinpointing the scope of your project. What are the specific tasks that need to be accomplished? The level of detail is up to you. Put the tasks on the vertical left side of your chart. It's like making a grocery list, but with the added bonus of not having to decide if you really need that third pint of ice cream.

Identify key players: The lucky souls involved in this project are your stakeholders. They get prime real estate across the top of your chart.

Assignments: For each task, you'll want to determine who's responsible (the doer), who's accountable (the decision-maker), who needs to be consulted (the advisors), and who should be informed (the folks kept in the loop).

Stay adaptable and engaged: Projects evolve, and so should your RACI matrix. As you progress, changes or shifts might need to be addressed. Regularly revisit your RACI chart, tweak as needed, and keep communication lines open, making sure it remains a relevant and valuable tool.

And here are some golden rules for using the RACI model:

Every task should have at least one Responsible party . Someone's gotta roll up their sleeves and do it. Otherwise, it's just a free-for-all of "not my job" shrugs.

There is always one and only one Accountable for each task . Adding another is like having two quarterbacks in a football game. Unless you're the 2008 Miami Dolphins, it just doesn't work.

Only the Responsible and Accountable roles are mandatory for each task. This ensures that for every activity, there's someone doing the work and someone ensuring it's done right. Everyone else is just there for support.

Keep it simple. If your grandma can't figure out your RACI chart, you're doing it wrong. Make it clear and understandable.

And there you have it. With these ingredients and rules in hand, you're well on your way to creating a RACI chart that'll make your project run smoother than freshly churned butter.

Example RACI chart and template

A RACI matrix is where you can see who's doing what at a glance.

Project tasks are in the left column

Project roles are in the top row

Each task gets a letter: R, A, C, or I

Letters are applied at the intersections of rows and columns to signal which role is performing each task

Next time you're drowning in a sea of "Who's on first?" whip out this RACI template to chart your way to clarity.  But remember: the magic isn't in the template, but in the thoughtful application of the RACI model.

Image of a RACI matrix template

RACI matrix alternatives

The RACI matrix is a staple in project management, but like with any tool, sometimes you need a different wrench for a different bolt. If RACI doesn't work for you, here are some alternatives.

RAS (Responsible, Approve, Support): This simplified version of RACI might be a good fit if your team doesn't need the "Consulted" and "Informed" distinctions. RAS is perfect for those "let's not make this harder than it needs to be" projects.

RAPID (Recommend, Agree, Perform, Input, Decide): This one's ideal for decision-making processes. If your project involves a lot of decisions that need input from various stakeholders, RAPID can help streamline who does what.

CARS (Consulted, Approve, Responsible, Support): This is another RACI variation emphasizing supportive functions and approval authority. CARS is for you if your project is about getting those green lights (car joke).

RASCI (Responsible, Approve, Support, Consulted, Informed): RACI's overachieving cousin, RASCI includes the "Support" role, which can be crucial for projects where certain team members provide resources or support without being directly involved.

DACI (Driver, Approver, Contributor, Informed): This model is handy for projects with a clear "driver," or leader. It emphasizes the leadership role while still keeping everyone else in the loop. Use DACI when someone's clearly wearing the captain's hat, but you still need a crew. 

CLAM (Collaborate, Lead, Agree, Monitor): CLAM might be the way to go if your project is highly collaborative. If it feels like a group project in school, where everyone needs to pitch in, give CLAM a shot.

Choosing the right model depends on your project's specific needs and your team's dynamics. While RACI is a fantastic starting point, don't be afraid to explore these alternatives to find the perfect fit for your next endeavor. And if all else fails, just make up your own acronym. Who's stopping you?

Unlock the power of RACI

I can't help but think back to my escape room fiasco. If only we'd designated someone responsible for deciphering the codes, and another accountable for keeping us on track. A couple could've been consulted for their puzzle-solving prowess, and the rest, well, they could've been informed—preferably from a distance. 

Related reading:

Get productivity tips delivered straight to your inbox

We’ll email you 1-3 times per week—and never share your information.

Allisa Boulette picture

Allisa Boulette

Based in New England, Allisa is a content marketer and small business owner who hopes to make the internet a more interesting place than she found it. When she’s not working, you can find her lying very still not doing anything.

  • Project management
  • Product management
  • Small business

Related articles

Hero image with an icon representing an AI agent

Enterprise AI: How companies can use AI across the organization

Enterprise AI: How companies can use AI...

Hero image of a woman doing a makeup tutorial to a camera

How to start a successful side hustle

Two orange people icons on a light orange background with a dotted line behind it.

11 management styles, plus tips for applying each type

11 management styles, plus tips for applying...

sample responsibility assignment matrix (ram)

Keep your company adaptable with automation

Improve your productivity automatically. Use Zapier to get your apps working together.

A Zap with the trigger 'When I get a new lead from Facebook,' and the action 'Notify my team in Slack'

PM Study Circle

What is a Responsibility Assignment Matrix (RAM) in Project Management?

Fahad Usmani, PMP

March 30, 2024

A responsibility assignment matrix (RAM) in project management is a key document that distinguishes stakeholders’ roles and responsibilities. The RACI chart is the most popular example of a RAM that clarifies stakeholders’ roles and defines their involvement.

RACI stands for Responsible, Accountable, Consulted, and Informed. Each team member in the RACI chart has at least one role.

All stakeholders refer to RAM in case of conflict regarding the roles and responsibilities in assignments or duties. RAM helps reduce conflict in projects to a great extent. Using this document, every team member will know their roles and the responsibilities of other team members.

The roles in the RACI matrix are as follows:

  • Responsible: This stakeholder is responsible for completing the task.
  • Accountable: This stakeholder is accountable for the task. They will make decisions and delegate work to the stakeholders who are responsible for completing the task.
  • Consulted: These stakeholders will be consulted on any decisions made about the task.
  • Informed: These stakeholders only require an updated status report on the progress of the task.

Responsibility Assignment Matrix Example

As I said, the RACI chart is the most popular example of RAM.

The table below shows the RAM example using the RACI chart:

Example of Responsibility Assignment Matrix

Some other less-popular responsibility assignment matrix examples are as follows:

  • RASCI Chart: This chart is also known as the “RASCI matrix,” as the letter S is added, which means “supportive.” 
  • DACI Chart: DACI stands for “Driver, Approver, Contributor, and Informed.” 
  • RAPID Chart: RAPID stands for “Recommend, Agree, Perform, Input, and Decide.” 
  • CARS: CARS stands for “Communicate, Approval, Responsible, and Support.” 
  • CLAM: CLAM stands for “Contribute, Lead, Approve, and Monitor.” 

Responsibility Assignment Matrix Template

The table below shows the basic template for the responsibility assignment matrix.

Responsibility Assignment Matrix Template

RAM is a key tool in project management . It helps the project manager assign roles and responsibilities. Additionally, it ensures that the team stays on its path and that no one interferes with each other’s roles. Finally, RAM ensures that every task has responsible and accountable stakeholders assigned to it.

This topic is important from a PMP exam point of view.

sample responsibility assignment matrix (ram)

I am Mohammad Fahad Usmani, B.E. PMP, PMI-RMP. I have been blogging on project management topics since 2011. To date, thousands of professionals have passed the PMP exam using my resources.

PMP Question Bank

This is the most popular Question Bank for the PMP Exam. To date, it has helped over 10,000 PMP aspirants prepare for the exam. 

PMP Training Program

This is a PMI-approved 35 contact hours training program and it is based on the latest exam content outline applicable in 2024.

Similar Posts

What is a Feasibility Study?

What is a Feasibility Study?

A feasibility study is a thorough analysis of any new business idea or offering to determine its chances of success, and whether the organization should proceed with it.  Success has many parameters. Depending on its goals and objectives, an organization can determine success by return on investment, recognition, or community service. The feasibility study is…

How to Become a PMP?

How to Become a PMP?

The PMP certification is the most valued for project professionals, and having this certification will help you grow your career.

Attaining the PMP certification is a lengthy process, but if you understand it, becoming a PMP is easy. This process involves many steps, and each step requires careful planning and the right approach.

You must collect the necessary information about the PMP exam. Visit the PMI website and explore it. Read the PMP handbook and the frequently asked questions. This will help you get the answers to most of your queries.

What is a Construction Project Manager?

What is a Construction Project Manager?

Every project needs a project manager, and the responsibilities of project managers depend on the type of project and the project management methodology used. For example, project managers in traditional waterfall projects are more accountable than those in agile ones. In traditional project management, construction project managers have strong roles and responsibilities in managing and…

What is a Project Sponsor, their Roles & Responsibilities?

What is a Project Sponsor, their Roles & Responsibilities?

A project has many stakeholders, and a project sponsor is one among all. The project sponsor is the key stakeholder, and a project manager must manage them closely and ensure they are satisfied throughout the project life cycle. Today’s blog post will discuss the project sponsor and their roles and responsibilities. Let’s get started. What…

Drexler/Sibbet Team Performance Model

Drexler/Sibbet Team Performance Model

Drexler-Sibbet Team Performance Model is a Team Performance Model to guides a team to work collaboratively and achieve success. It helps teams organize their work and improve the performance. This model explains group dynamics and prepares teams for changes. It builds a resilient and flexible team to handle any situation effectively. What is the Drexler/Sibbet…

21 Introduction Icebreakers to Start Your Conference

21 Introduction Icebreakers to Start Your Conference

You can use icebreakers to create a memorable and good impact at the beginning of your conference or presentation. Icebreakers can help you set a positive environment for the session and energize and motivate the audience. You must plan meticulously before using icebreakers. Set a goal for what you want to achieve with your objectives…

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

web analytics

project-management.com logo.

Popular Insights:

Best Project Management Software

Mind Mapping Software

What Is a RACI Matrix?

Lauren Good Avatar

Share this Article:

Our content and product recommendations are editorially independent. We may make money when you click links to our partners. Learn more in our  Editorial & Advertising Policy .

Key takeaways

Successful project management depends on a team-wide understanding of roles and responsibilities. Using a RACI matrix to assign and define each role is a great way to keep a project on track and positioned for success.

Featured Partners

{{ POSITION }}. {{ TITLE }}

{{ TITLE }}

How Does a RACI Chart Help Project Managers?

Project managers use RACI charts to keep track of team roles and relay those responsibilities to the larger team. The matrix defines clear roles and responsibilities for individual team members across the various phases of the project, breaking the roles down into four types. Each letter of the project management acronym stands for a designation: those who are Responsible and Accountable for project deliverables, those who should be Consulted as work begins, and stakeholders who need to be Informed of ongoing progress, roadblocks, and updates. 

Read more: Project Management Phases

RACI Matrix Definitions 

Responsible.

The individual(s) with responsibility for the task or deliverable is typically responsible for developing and completing the project deliverables themselves. The responsible parties are typically hands-on team members who make direct contributions toward the completion of the project. The responsible team is comprised of the project’s “doers”, working hands-on to ensure that each deliverable is completed. 

Some examples of responsible parties are:

  • Project Managers
  • Business Analysts
  • Graphic Designers
  • Copywriters

Accountable

Accountable parties ensure accountability to project deadlines, and ultimately, accountability to project completion. This group frequently also falls under the informed category.

Some examples of accountable parties are:

  • Product Owners
  • Signature Authorities
  • Business Owners
  • Key Stakeholders

Consulted individuals’ opinions are crucial, and their feedback needs to be considered at every step of the game. These individuals provide guidance that is often a prerequisite to other project tasks, for example, providing legal guidance on a project throughout the process. If you are working on new product development or expansion, this could essentially be the entire organization.

Some examples of consulted parties are:

  • Legal Experts
  • Information Security and Cybersecurity Experts
  • Compliance Consultants

Informed persons are those that need to stay in the loop of communication throughout the project. These individuals do not have to be consulted or be a part of the decision-making, but they should be made aware of all project updates. Typically, this party are business owners or stakeholders that are more interested in viewing the project at a 30,000-foot view.  Keep this group on your cc list for awareness of topics, decisions, and progress – that includes making them part of the initial project kickoff and project demos as optional attendees. This group often also falls under the accountable group.

Some examples of informed parties are:

  • Project Committee Members
  • External Stakeholders

Read more: DACI vs RACI Model Guide

Why Are RACI Roles Important?

RACI roles provide a sense of organization and clarity for teams that are looking to divide roles and keep team members accountable for their contributions. Considering that 27% of projects go over budget, for reasons like scope creep and lack of defined roles, RACI roles help position a project for success and avoid common pitfalls. 

Moreover, RACI roles help ensure that communication between all roles is ongoing. When you consider that nearly half of all project spending is at risk of being wasted due to a lack of effective team-based communication, it becomes all that more important to prioritize. Ultimately, teams who prioritize communication and well-defined roles are better off, and RACI roles help teams achieve that goal faster – while providing accountability for each team member’s unique contributions to the success of the project. 

Read More: Top 10 Main Causes of Project Failure

How to Create a RACI Matrix 

If you’re looking to implement a RACI matrix as part of your team’s project planning process, take these steps to create a RACI matrix.

Ensure that you have a thorough understanding of the project and its demands before outlining any further steps by communicating with key stakeholders and decision-makers.

Determine the list of key activities and deliverables from the director of program management or other leadership. 

Determine who is needed to be a part of the project or initiative.

Determine the project roles and responsible job titles and persons for each activity and deliverable.

Hold review sessions with key members of the team for alignment, and if you haven’t already, host a kickoff meeting with the entirety of the team and key stakeholders to unveil the matrix, address questions, and more. 

If the project has already started, it’s not too late to implement a RACI matrix.

  • Outline the story. Using research from multiple sources, do a, b, c, and d.
  • Utilize steps 2 and 3 (shown above). Ensure the right groups are assigned and engaged. 
  • Hold a review session. Ensure that the team acknowledges and discusses the plan and the roles assigned.

Read more: 8 Factors That Lead to Successful Projec ts

Examples of a RACI Matrix

RACI matrix example.

As shown above, a RACI matrix helps break down what roles individuals will play as work is carried out and to what extent they will be involved in the project overall. The horizontal axis represents each person on the project team and the vertical axis represents each task.

Each square of the matrix represents an individual, a task, and that individual’s role within the project, either responsible, accountable, consulted, or informed. In this situation, for example, the project manager is accountable for accessing risk, defining performance requirements, creating designs, executing construction, and approving construction work. However, they are only informed about approving construction work and defining functional and aesthetic needs.

Read more: Understanding Different Types of Stakeholders and Their Roles

Our FREE Downloadable RACI Matrix Template

Who creates the raci matrix.

The RACI matrix — sometimes called RACI model, RACI diagram, or simply just RAC — is created by the project manager at the start of the project as a key part of establishing the initial human resources planning for the project. Because miscommunication is a common threat to any project, RACI charts are a great asset to teams dealing with any type of project, from very simple projects to extremely complex ones. 

Common Mistakes When Creating a RACI Matrix

  • Failure to plan ahead: Utilizing a RACI matrix should not be your first step in project planning. Having a fully assembled project team and at least a general idea of a task list and project plans is a better place to start before preparing a matrix.
  • Working with too large a team: A RACI matrix is likely not the best bet for a large team, as it will make the matrix hard to understand and overly complex.
  • Not communicating with the project team: A RACI matrix should help organize tasks and responsibilities that have already been introduced to the project team – no one likes to be blindsided. Be sure to host a kickoff meeting with the team first before creating a RACI matrix.

Frequently Asked Questions

Implementing a RACI matrix takes more than just a few emails and sporadic conversations – it takes consistent communication and planning. You should host a kickoff meeting to introduce the matrix to the team and make a plan to continue meeting at predetermined times throughout the project lifecycle. 

Here are a few more tips to keep in mind as you implement your RACI matrix within the team dynamic:

  • Get everyone prepared. Send the document around to the meeting distribution as read-ahead material, requesting feedback if there are any major concerns. 
  • Roll out each role for the team . During the meeting, conduct a review of the tasks and responsible parties. Do not rush through this review, but rather ensure enough time in your project kickoff for this important aspect. (Be certain to clarify the definitions of RACI to avoid ambiguity.)
  • Consider changes and update accordingly. After the meeting, send out the notes documenting acceptance or updates to the RACI. In addition to sending out the notes, request any corrections within a reasonable yet defined timeframe. Clarify that if no changes are requested, each person is acknowledging their role and committing to the project tasks as outlined.
  • Stay in touch. Consider a quick review with the entire team each quarter or every six months for longer projects to ensure it remains up-to-date and not simply another document in the repository but a relied-upon artifact.

As you implement the RACI matrix…

  • Encourage teamwork and foster collaboration whenever possible.
  • Don’t fear updates – make changes and adjustments as needed (but be sure to communicate those changes clearly to all parties).
  • Earlier is better. Roll out your matrix plan to the team BEFORE you plan to implement it for the best results. 
  • Have a clear-cut understanding of the project scope and how each role connects to the overall project goal.

For “Responsible” Parties:

  • Make sure your project’s definition of Responsible is clear on who holds the “decider” role for the project or project phase’s completion, and what the dimensions of that responsibility will be.
  • Ensure that all parties are aware of their role and responsibilities within the matrix.

For “Accountable” Parties: 

  • When multiple Accountable team members must exist, use your definitions to make clear which individual is accountable for a given project element, and how that individual needs to interact with other Accountable team members.
  • Ensure that there is only one “Accountable” party assigned per task.
  • Be sure that the Accountable party has the authority and power to oversee the task as the accountable party.

For Consulted and Informed Parties: 

  • Consulted parties are often high-level decision-makers with heavy schedules. Make sure you’re clear on their availability ahead of time.
  • Similar to Consulted parties, Informed parties are often less hands-on and have less understanding of day-to-day project operations. As the project goes on, make sure to keep detailed notes to keep the Informed party up-to-date on key information. 
  • Understand the ways that these parties like to communicate and create a plan to reach them early – whether that’s over phone calls, emails, video calls, or from within your project management system’s collaboration tools.
  • Knowing the difference between who needs to be consulted versus informed can be a challenge if there is ambiguity about project roles. Consider what aspects of the project different team members need to know to do their jobs, and then bake those into your definitions.

RACI Matrix Pros & Cons

  • Increased Engagement: RACI helps engage project participants in the project lifecycle. 
  • Enhanced Project Planning: Project managers make project planning more organized, efficient, and detailed.
  • Identifiable Improvement Opportunities: Areas of improvement are more easily identified.
  • Easier Collaboration: Use of a RACI matrix creates a clear path for leadership to sign off on project steps, as project documentation in the RACI model is heavily emphasized.
  • Better Communication: Improves overall group communication as a whole.
  • Group Accountability: Assists groups, especially larger project teams, stay connected and accountable to their roles and project goals
  • Limitations on Role Scope: The RACI model does not provide details on role scope, especially for responsible parties. These gaps in detail also affect other team roles, for example, another gap in a RACI is the determination of who is responsible for verifier and signatory.
  • Limits on Task Details and Scope: While a RACI matrix can provide an overview of who is responsible for different tasks, it will not state what needs to be done.
  • Not Aligned to the Agile Methodology: Project managers using an agile methodology like scrum may find it redundant since accountability, ownership, and ongoing communication is built into the scrum framework (i.e., product owner, scrum master, and daily standups with the team). Additionally, agile focuses on team-based delivery and accountability, while the RACI framework and alternatives focus on individual responsibility and autonomous accountability.

Read more: Top 10 Causes of Project Failure

Free RACI Matrix Templates

A number of project management software solutions include a native RACI matrix template. Here are just a few we’ve found:

Colorful RACI Chart Template

We love this template from Smartsheet because it’s colorful, thorough, and includes room for every party involved in the project. 

RACI template from smartsheet.com.

Pastel Colored RACI Matrix Template

This template from the Academy to Innovate HR is a great choice for project managers who want to organize their team roles with an easy-on-the-eyes chart that evolves beyond the simple spreadsheet. 

RACI matrix template from the Academy to Innovate HR.

Simple RACI Chart from Clickup

These RACI templates from Clickup have enough variety to fit any of your project needs, but are simple enough for even beginner PMs to use.

A simple RACI matrix from clickup.com.

Detailed RACI Matrix Template

This template is a great starter template for anyone looking to explore RACI charts in their project management strategy . As an added bonus – it comes with the RACI definitions already built in!

A detailed RACI matrix template from Vertex42.

Excel-Based RACI Chart Template

Are you an Excel or Google Sheets user looking to take advantage of the RACI matrix? An Excel-formatted template from Project Management Docs can be just the solution for you. This template is a great template for users who want a chart that comes in a pre-formatted structure.

An Excel spreadsheet-based RACI matrix from projectmanagementdocs.com

Sign up for our emails and be the first to see helpful how-tos, insider tips & tricks, and a collection of templates & tools. Subscribe Now

{{ TITLE }}

You should also read.

5 Best Mind Mapping Software to Organize Project Ideas [2024]

5 Best Mind Mapping Software to Organize Project Ideas [2024]

Creating Gantt Charts in Microsoft Project: Ultimate Guide

Creating Gantt Charts in Microsoft Project: Ultimate Guide

Project Executive: Roles, Responsibilities, and How to Become One

Project Executive: Roles, Responsibilities, and How to Become One

Join our newsletter.

Subscribe to Project Management Insider for best practices, reviews and resources.

By clicking the button you agree of the privacy policy

Lauren Good Avatar

Get the Newsletter

You might also like.

What Is Cost-Benefit Analysis: A Practical Guide

What Is Cost-Benefit Analysis: A Practical Guide

Anne M. Carroll Avatar

83 Project Management Terms & Concepts to Know

Shelby Hiter Avatar

What Is a Problem Statement & How to Effectively Create One

J.R. Johnivan Avatar

Top Categories

The responsibility assignment matrix (ram).

Edit this template

sample responsibility assignment matrix (ram)

The Responsibility Assignment Matrix (RAM) is a crucial tool for project managers and teams to ensure clear and efficient allocation of tasks and responsibilities within a project. A RAM, also known as a RACI matrix, is a visual representation of the roles and responsibilities of team members in relation to specific tasks or deliverables.

To create a RAM, it is essential to have a clear understanding of the project goals and the tasks required to achieve them. A RAM helps ensure that no task is overlooked, and all team members are aware of their specific responsibilities.

Visual Paradigm offers an easy-to-use Responsibility Assignment Matrix (RAM) Excel template that streamlines the process of creating a RAM. With its intuitive interface and customizable features, the Visual Paradigm RAM template allows teams to quickly create a clear and effective matrix that covers all aspects of the project.

In conclusion, the Responsibility Assignment Matrix is an essential tool for ensuring project success, and Visual Paradigm’s RAM Excel template provides a convenient and straightforward solution for teams to create a RAM that meets their specific needs.

Start creating your spreadsheet today!

©2024 by Visual Paradigm. All rights reserved.

  • Terms of Service
  • Privacy Policy
  • Security Overview
  • PMP® Exam Tip: The Responsibility Assignment Matrix (RAM)

PMP® Exam Tip: The Responsibility Assignment Matrix (RAM)

It is especially useful in clarifying roles and responsibilities in cross-functional/departmental projects and processes. RACI is an acronym derived from the four key responsibilities most typically used:

Very often the role that is Accountable for a task or deliverable may also be Responsible for completing it (indicated on the matrix by the task or deliverable having a role Accountable for it, but no role Responsible for its completion, i.e. it is implied).

RAM Definition

A grid that shows the project resources assigned to each work package. PMBOK® Guide

Outside of this exception, it is generally recommended that each role in the project or process for each task receive, at most, just one of the participation types. Where more than one participation type is shown, this generally implies that participation has not yet been fully resolved, which can impede the value of this technique in clarifying the participation of each role on each task.

Furthermore, there is a distinction between a role and individually identified persons: a role is a descriptor of an associated set of tasks, which may be performed by many persons, and one person can perform many roles.

For example, an organisation may have 10 persons who can perform the role of project manager, although traditionally each project only has one project manager at any one time; and a person who is able to perform the role of project manager may also be able to perform the role of business analyst and tester.

On larger projects, RAMs can be developed at various levels. For example, a high-level RAM can define which a project group or unit is responsible for major phases of the project, while lower level RAMs are used within the group to designate roles, responsibilities and levels of authority for specific activities.

RACI Definition

A common type of RAM that uses responsible, accountable, consult and inform statuses to define the involvement of stakeholders in project activities. PMBOK® Guide

The matrix format shows all activities associated with one person and all people associated with one activity. This also ensures that there is only one person accountable for any one task to avoid confusion.

The PMBOK® Guide also states that one example of a RAM is the RACI chart, showing the work to be done in the left column as activities. The assigned resources can be shown as individual or groups. The RACI is just one type of RAM; the project manager can select other options such as "lead" and "resource" designation or others as appropriate for the project. The RACI is particularly important when the team consists of internal and external resources to ensure clear divisions of roles and expectations.

It is recommended that the project manager involves team members when developing the responsibility assignment matrix. While the PM can develop an initial, rough draft, it is impossible for him or her to know exactly how tasks should be performed in each area of expertise. Involving the team therefore not only leads to a more precise matrix, but in addition the team members will also feel greater ownership of assignments, leading to greater commitment and participation.

PMP® Exam Sample Questions

Test your understanding of the RAM with this sample question from the PMP® Exam Simulator:

  • Sample Question
  • Answer and Explanation

Which type of tool will you use to depict the relationship between work to be done and project team members?

A) Matrix-based B) Hierarchical C) Text-oriented D) Gantt chart

Correct Answer: A) Matrix-based.

Explanation: A responsibility assignment matrix (RAM) is a grid that shows the project resources assigned to each work package.

Reference: PMBOK Guide 5th Edition, page 262

The PMP Exam Simulator

Most Read Project Management Professional (PMP)® Tips...

  • PMP® Exam Tip: Crashing & Fast Tracking explained
  • What’s an Example of a Start-to-Finish Relationship?
  • PMP® Exam Tip: The Work Package Explained
  • PMP® Exam Tip: Quality Assurance VS Quality Control
  • Mandatory vs Discretionary Project Management Dependencies
  • Communications Channels Formula for Communications Management

Related Articles

  • Prepare for the PMP® Exam By Dressing Appropriately
  • The 7 Things You Need to Pass The PMP® Certification Exam
  • Dress Right for the PMP® Certification Exam
  • Answer 1,000 PMP® Exam Questions Using PMP® Exam Simulator
  • Tips to Manage Your Time During PMP® Certification Exam
  • Our Mission
  • Our Partners
  • Terms & Conditions
  • Privacy Notice
  • Corporate Project Management Training
  • Group Discounts
  • PM PrepCast Discount Coupon
  • Scholarships
  • Free PMP® Newsletter
  • Free PMP® Questions
  • Free PMI-ACP® Questions
  • Free CAPM® Simulator
  • Project Management Basics
  • Mastering Business Analysis
  • PMP® Exam Simulator
  • PMP® Formulas
  • PMI-ACP® Exam Training
  • CAPM® Exam Training
  • PMP® Exam Prep
  • PrepCast PMP® Practice Exam
  • Forgot your password?
  • Forgot your username?
  • Order The PM PrepCast
  • PM PrepCast Product Details
  • PMP Exam Agile Booster Course
  • The PMP® Exam Simulator
  • The PM Formulas
  • The PM StudyCoach (recorded)
  • The PM StudyCoach Guidebook
  • The PM FlashCards
  • All PMP® Products Overview
  • PM Basics Course
  • Corporate PMP Training
  • Order the Agile PrepCast
  • Agile PrepCast Product Details
  • The ACP StudyCoach Guidebooks
  • The PMI-ACP® Exam Simulator
  • Corporate PMI-ACP Training
  • Order The PM PrepCast for CAPM
  • The PM PrepCast for CAPM®
  • The CAPM® Exam Simulator
  • 60 PMP PDUs - From The PM PrepCast
  • 60 PMP PDUs - From The PDU Podcast
  • 15 PMP Power Skills PDUs
  • 17 PMP Leadership PDUs
  • 30 PMI-ACP PDUs
  • 17 PMI-ACP Leadership PDUs
  • 15 CAPM PDUs
  • 5 PDUs Business Analysis Course
  • Artificial Intelligence for Project Managers
  • Free PM PrepCast Training
  • Free PM PrepCast Exam Simulator
  • Free PMP® Practice Exam
  • The Free PM PrepCast
  • Free PMP® Exam Guides
  • Free PMP® Exam Newsletter
  • Free PMP® Webinars
  • All Free PMP® Exam Resources...
  • The Free Agile PrepCast
  • Free PMI-ACP® Exam Newsletter
  • All Free PMI-ACP® Exam Resources...
  • Free CAPM® Exam Newsletter
  • All Free PDU Resources...
  • Explore Corporate Training Offers
  • Unlocking Corporate Efficiency
  • How PM Training Transform Businesses
  • PM Training for Shifting Market Demands
  • PM Training for Your Business
  • Student Success with PMP Simulation
  • PMP® Study Guide
  • PMP® Certification Cost
  • 35 Hours of Project Management Education
  • Knowledge Areas & Process Groups
  • How to Fill in the PMP Application
  • PMP® Certification Exam
  • How to get PMP Certification
  • PMP® Exam Questions
  • PMP® Certification Bangalore
  • Failed PMP Exam
  • PMI-ACP Certification Study Guide
  • CAPM Certification Study Guide
  • 12 Project Management Principles Explained by Experts
  • Project Management Certifications Career Advancement
  • PMP vs Certifications
  • Project Management Organization Company Benefits
  • Project Management Organizations Importance
  • PM PrepCast Reviews
  • PM PrepCast Reviews on Google
  • PM Exam Simulator Reviews
  • Agile PrepCast Reviews
  • PMP® Exam Coaching Reviews
  • Exam Prep Essentials eBook Reviews
  • Add Your Review
  • Student Profiles
  • Successful Students
  • PMP® Exam Discussion
  • PMP® Exam Lessons Learned
  • Free PMP® Exam Questions
  • PMI-ACP® Exam Discussion
  • PMI-ACP® Exam Lessons Learned
  • CAPM® Exam Discussion
  • CAPM® Exam Lessons Learned
  • PDU Questions and Answers
  • CIPP/E® Exam Discussion
  • CIPP/E® Exam Lessons Learned

Responsibility Assignment Matrix

Responsibility Matrix

A Responsibility Assignment Matrix (RAM) is sometimes called a RACI Chart, or Responsibility Matrix.

There are several avoidable excuses in the project management world, such as:

  • I didn’t think I was supposed to be doing that!
  • I thought (name other employee here) was doing that!
  • But the contractor was responsible for that!

The Responsibility Assignment Matrix will prevent this from happening on your project!

Responsibility Assignment Matrix Definition

The Association for Project Management (APM) definition is as follows:

A diagram or chart showing assigned responsibilities for elements of work. It is created by combining the work breakdown structure (WBS) with the organisational breakdown structure (OBS).

The APM (BoK 6th edition) further states that a RAM is used to assign the work packages to the people responsible for creating the project’s output.

So when you have a list of those involved in the project ( the OBS ) and the tasks in the project ( the WBS ) you can create your matrix!

Check what your organisation calls it, and use the same terminology.

A Responsibility Assignment Matrix could be at department and work-package level for larger projects, or individual people and task level for smaller projects.

A RACI chart is a matrix of the project tasks (from the WBS) against the people in the project (from the OBS). It ensures that everybody knows what they are expected to deliver, by giving every task has an accountable task owner.

RACI stands for;

  • Responsible – I’m involved with this task
  • Accountable – I’m accountable (own) this task
  • Consult – Consult me before you do anything
  • Inform – Inform me of your intentions and progress

Responsibility Assignment Matrix

Other definitions can be found in text books: Primary and Secondary ownership, Owner and Support, RASCI, etc.

Interestingly, there is some debate about the difference between “Accountable” and “Responsible” and an indication that originally the “A” was for Approve which does make some sense. Personally, I advocate the use of Accountable for one, and only one person on each task.

Creating a Responsibility Matrix

There are several tools that you can use to create these matrices. It really depends on the application that you have your task list available in. A list of tasks in Microsoft Project can be copied and pasted into other applications.

  • A WORD Table could be used. However you may be limited to the width of your paper, so this may be a problem for a large project.
  • An EXCEL Spreadsheet is a good choice, however care must be taken on setting up a ‘Print Area’ to share the document. (Print to pdf could be used)

Consider how you are going to share the matrix with the project team and other stakeholders when you create it.

One of the best ways to populate the matrix is at a project team meeting, asking for staff to state their involvement on a task by task basis. this will create a dialogue around each task  – the start of project communication .

Responsibilities in Microsoft Project

Although you can assign resources to tasks in Microsoft Projec t, you cannot define their roles in the RACI type format.

Microsoft Project Resource Names

Microsoft Project Resource Names

Personally, I encourage people to assign the accountable owner first, so that the first name on the Gantt chart is the accountable task owner.

I wrote about assignments in Microsoft Project in a previous blog .

Knowing that every task has an owner is vital if the project is to be completed on time. The Responsibility Assignment Matrix is the tool to use in order to make sure that task ownership is clear.

AbleSim Project Management Simulations YouTube Channel

AbleSim have a YouTube channel dedicated to work with Project Management Simulations, Masters Dissertation Support and MS Project.

Subscribe to this channel here!

Project Management Training YouTube Channel

Andrew Bell has a YouTube channel dedicated to Project Management Training with over 10 hours of video arranged by 97 videos in 20 playlists.

Follow 🔔 AbleSim 🔔 on twitter @AbleSim

Join the conversation #pmsim

  • Tweets could not be loaded at this time.

Like us on Facebook

On-line Project Management Simulations | AbleSim

  • Privacy Overview
  • Strictly Necessary Cookies
  • 3rd Party Cookies

This website uses cookies so that we can provide you with the best user experience possible.

Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly necessary cookies should be enabled at all times so that we can save your preferences for cookie settings.

If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.

Please enable Strictly Necessary Cookies first so that we can save your preferences!

Scope Training Logo

Responsibility Assignment Matrix (RAM)

Responsibility assignment matrix.

The RAM in project management can be called by two names:

RAM Resource Allocation Matrix

In this use of the term the RAM is a document which aims to allocate the project’s resources to key tasks.  The same RAM template can be used, however the allocation of resources is an exercise performed in the early stages of a project.  The key WBS packages are identified then the RAM is used to allocate available resources as well as identify gaps which are not able to be covered with the current resource configuration.  This may require up skilling of those currently available, additional resources, contracting out specific works or reducing the scope.

RAM Responsibility Assignment Matrix

This use of the word RAM is indicative that the project is in planning or implementation. The RAM is used to assign resources to best complete the the project’s work.  It is also used in monitoring and controlling the work.

The RAM template can be used for both of the above purposes.

Download a free RAM Template  in Word Format

Please follow the guidelines on the project management templates page for the use or distribution of this template.

For more Free Project Management Templates

Leave a Reply

Your email address will not be published. Required fields are marked *

language-selector

What is a Responsibility Assignment Matrix (RAM) in Project Management?

  • 1.  Project Management Basics
  • 2.  Project Management Methodologies
  • 3.  Project Management Life Cycle
  • 4.  Best Project Management Software
  • 5.  Team Collaboration Tips
  • 6.  Agile Methodology Basics
  • 7.  Agile Project Management Tools & Techniques
  • 8.  Project Management Frameworks
  • 9.  Resources
  • 10.  Glossary
  • Advanced Terminology
  • Methodologies
  • PM Software Features
  • Basic Terminology
  • Professional Development
  • Agile Project Management

Introduction to Responsibility Assignment Matrix (RAM)

Project management is a complex process that involves multiple stakeholders, tasks, and resources. To ensure the success of a project, it is crucial to assign clear roles and responsibilities to team members and accurately define their tasks. 

One tool that can help project managers achieve this goal is the Responsibility Assignment Matrix (RAM). In this article, we will explore the definition and benefits of RAM, as well as some examples.

If you’re looking for a RAM template that will help you assign roles and clarify responsibilities, Wrike has a customizable template ready to go.

What is a Responsibility Assignment Matrix (RAM) in project management?

A responsibility assignment matrix (RAM) in project management, also known as a RACI chart or RACI matrix, details all the necessary stakeholders and clarifies responsibilities amongst cross-functional teams and their involvement level in a project. RACI stands for Responsible, Accountable, Consulted, and Informed and each letter corresponds to a team member.

A RAM in project management should be referred to by all parties throughout a project because it helps plan an individual’s roles and responsibilities before work begins. A RACI matrix ensures all stakeholders know who is responsible for completing a task or getting feedback on deliverables.

The four roles are broken down as follows:

  • Responsible: The person(s) completing the task
  • Accountable: The team member coordinating the actions, making decisions, and delegating to those responsible for the task
  • Consulted: The person(s) who will be communicated with regarding decisions and tasks
  • Informed: The person(s) who will be updated during the project and upon completion

Read more about RACI here . 

Identify and visualize roles seamlessly with Wrike

Responsibility assignment matrix example.

A common RAM   template looks like the example below. Notice how all stakeholders can have more than one role:

sample responsibility assignment matrix (ram)

Responsibility Assignment Matrix template

Below you can see a powerful RAM template . The chart helps with visualizing roles and workload clearly. Therefore, project managers and team members follow the progress easily and stay on track.

sample responsibility assignment matrix (ram)

Clarify roles with Wrike

In conclusion, RAM is a useful tool for any project manager who wants to ensure their team is clear on their responsibilities. It helps to establish a structured approach to project management, allowing for better communication, accountability, and ultimately, project success.

Using Wrike’s pre-built template, you can define the roles of each team member so everybody is on the same page. The template will also help you balance your workload and create complete transparency on your team structure.

What is a RACI Chart?

Basic Project Management

  • Project Charter
  • Project Management Stakeholders
  • What is a Project?
  • Work Breakdown Structure
  • Project Objectives
  • Project Baseline
  • Project Management Scheduling
  • Project Management Work Packages
  • Project Management Scope
  • Scope Creep

Advanced Project Management

  • What is PERT?
  • Network Diagram
  • Risk Management
  • Cost Estimation
  • Feasibility Study
  • Monte Carlo Analysis
  • Project Integration
  • Cost Management
  • PMI Project Management
  • What To Do With Certification
  • Certification
  • Become Certified
  • PMP Certification
  • Best Certification

Software Features

  • Critical Success Factors
  • Capacity Planning
  • User Role Access Permissions
  • Time Tracking
  • Budget Tracking
  • Request Forms
  • Work Assignments
  • Version Control
  • Dependency Managements
  • Project management Milestones
  • Project Management Software
  • Project Management Tools
  • Project Management System
  • Gantt Charts

LinkedIn

  • Shopping Cart: 0 Items

Responsibility Assignment Matrix (RAM)

Proudly Serving the EVM Community for 44 Years.

  • 714-685-1730 or Email Us
  • EVMS Newsletter Sign Up

Request a Free Consultation

All fields are required.

Humphreys & Associates is committed to the security of your information. View Privacy Policy

  • CAM Certification
  • EVMS Proposal Support
  • EVMS Requirements/Gap Analysis
  • EVMS Design and Documentation
  • EVMS Implementation
  • EVMS and Project Management Training
  • Preparation for an Integrated Baseline Review
  • Preparation for an EVMS Compliance Review
  • EVMS Staff Augmentation
  • Scheduling Services
  • Agile Consulting
  • Agile Training
  • Agile Framework Implementation
  • Agile-EVMS Integration
  • Agile Coaching
  • Agile Practioner Connection
  • Meet the Agile EVMS Team
  • EVMS Online Training
  • Earned Value Public Workshops
  • Earned Value In-House Training
  • EVMS Education Center
  • Online Store
  • Humphreys Executive Management
  • Humphreys Professional Staff
  • EVMS Careers

Articles & Media

Evms education center responsibility assignment matrix (ram).

  • Save to Profile    Share with a Friend    Rate this Article    Give us Feedback    Print Friendly Version

Upcoming EVMS Workshops

  • EVMS - Webinar_April
  • View Event Details
  • Scalable EVM
  • EVMS - Webinar_July
  • CAM Discussion
  • EVMS Review

EVMS Education Center Latest Article

Humphreys & associates evms workshop reference materials - 2024.

US Government EVMS related regulation, policy, reporting, and other reference documents for H&A's EVMS workshops.

View Article

Earned Value Management Specialists since 1978

Humphreys & Associates, led by Gary Humphreys, is the established leader in earned value management consulting and training. H&A has provided consulting services to over 850 companies and government agencies worldwide and trained over 900,000 individuals at all functional and management levels.

Learn More About Humphreys & Associates

EVMS Consulting & Training

  • EVMS Consulting Services
  • EVMS Training Courses
  • Earned Value Online Store

Stay Connected

  • Humphreys & Associates Blog
  • Join Our Newsletter
  • Follow us on Twitter
  • Like Us on Facebook
  • Connect to Us on LinkedIn
  • About Humphreys & Associates
  • Contact Humphreys & Associates
  • Terms and Conditions
  • Privacy Policy
  • Shipping and Returns
  • Complete Site Map
  • © 2024 Humphreys & Associates
  • © The A.T.P. Logo is a registered mark of PMI.
  • Powered by CaliberCommerce enterprise ecommerce solution

CaliberCommerce

IMAGES

  1. Responsibility Assignment Matrix (RAM) Template

    sample responsibility assignment matrix (ram)

  2. What Is a Responsibility Assignment Matrix (RAM)?

    sample responsibility assignment matrix (ram)

  3. PPT

    sample responsibility assignment matrix (ram)

  4. Responsibility Assignment Matrix

    sample responsibility assignment matrix (ram)

  5. Assign responsibilities. The RAM matrix

    sample responsibility assignment matrix (ram)

  6. Responsibility Assignment Matrix (RAM) for Cycle 1 -Business Models

    sample responsibility assignment matrix (ram)

VIDEO

  1. RAM Chip

  2. مصفوفة المهام والمسؤوليات RAM Matrix

  3. Flow of team in PMP in 3 minutes|PMP team Flow

  4. math assignment (matrix application)

  5. Episode 11: What's the Difference Between a RAM vs RACI

  6. RAM Meaning

COMMENTS

  1. How to Make a Responsibility Assignment Matrix (Template Included)

    Draft the responsibility assignment matrix using a table with the project tasks listed on the left-hand column. Across the top add the name of everyone in the project. Where the tasks meet the project team member, assign whether they're responsible, accountable, consulted or informed. When completed, share the responsibility assignment matrix ...

  2. Responsibility Assignment Matrix (RAM) Template

    Download the Excel Template. This is a FREE Responsibility Assignment Matrix (RAM) Template in Excel and OpenDocument Spreadsheet. The template is fully editable with Microsoft Excel and can be converted or changed to suit your project requirements. The template uses conditional formatting to change the color of each cell so that it is easy to ...

  3. Responsibility Assignment Matrix with Excel RACI Template

    A responsibility assignment matrix (RAM) is a tool used in project management to clarify team and stakeholder roles for each project step. It paves the way for smooth collaboration by ensuring everyone knows what they need to do, who they need to talk to, and who has the final say on key decisions and deliverables.

  4. Responsibility Assignment Matrix (RAM)

    6 Steps to Developing a Responsibility Assignment Matrix (RAM) Below is a list of the 6 (six) most common steps in developing a Responsibility Assignment Matrix (RAM). Step 1: List all project tasks and deliverables. Step 2: Identify all project stakeholders. Step 3: Determine the responsibility and accountability level for each task and ...

  5. Responsibility Assignment Matrix: Template, Example & Benefits

    Share the completed Responsibility Assignment Matrix Template Word with the project team and stakeholders. If necessary, conduct a meeting to ensure that everyone is aware of their responsibilities for the project. Print a copy, and if you are working in a common location, post it. Developing Responsibility Assignment Matrix (RAM) Best Practices

  6. What Is A Responsibility Assignment Matrix (RAM)? Everything You Need

    Getty. The responsibility assignment matrix (RAM) is a form of project management that encourages everyone to understand every step of the project. Looking at the chart involves all parties and ...

  7. The Responsibility Assignment Matrix (RAM)

    This matrix clearly identifies which role each team member has agreed to take on for each of the project's main deliverables. With these assignments, you can eliminate miscommunication about who's doing what - and you can help to ensure that your project is successful. You've accessed 1 of your 2 free resources.

  8. Responsibility Assignment Matrix (RAM)

    Figure 1 - The Responsibility Assignment Matrix (RAM) / RACI Matrix. To do this well and accurately, the matrix can be completed using the following steps: Step 1: Identify all the participants and (facilities) supporters of the project. Step 2: Identify all the deliverables for the project. Step 3: Discuss with all team members how they can ...

  9. What Is a Responsibility Assignment Matrix (RAM) in Project Management?

    Key Takeaway: A Responsibility Assignment Matrix (RAM) is a useful tool for project managers to assign tasks and responsibilities to team members. It can help improve communication, increase accountability, track progress more accurately and reduce risk. There are two main types of RAMs: Functional (F-RAM) and Projectized (P-RAM), each with ...

  10. RACI model: A map for team structure [+ template]

    The RACI model, sometimes called a responsibility assignment matrix (RAM), is a project management tool for assigning roles and responsibilities to the various stakeholders of a project. ... Example RACI chart and template. A RACI matrix is where you can see who's doing what at a glance. Project tasks are in the left column. Project roles are ...

  11. What is a Responsibility Assignment Matrix (RAM) in Project Management

    March 30, 2024. A responsibility assignment matrix (RAM) in project management is a key document that distinguishes stakeholders' roles and responsibilities. The RACI chart is the most popular example of a RAM that clarifies stakeholders' roles and defines their involvement. RACI stands for Responsible, Accountable, Consulted, and Informed.

  12. RACI Matrix: Responsibility Assignment Matrix Guide for 2024

    RACI is a project management acronym for the different responsibility types within a project: Responsible, Accountable, Consulted, and Informed. The RACI matrix clarifies the roles named individuals or groups will play in the successful delivery of the project. Accurate RACI matrices can help ensure a project's success before it even begins.

  13. The Responsibility Assignment Matrix (RAM) Excel Template

    The Responsibility Assignment Matrix (RAM) Edit this template Edit this template The Responsibility Assignment Matrix (RAM) is a crucial tool for project managers and teams to ensure clear and efficient allocation of tasks and responsibilities within a project. A RAM, also known as a RACI matrix, is a visual representation of the roles and responsibilities …

  14. Responsibility assignment matrix

    Responsibility assignment matrix. In business and project management, a responsibility assignment matrix [1] ( RAM ), also known as RACI matrix [2] ( / ˈreɪsi /) or linear responsibility chart [3] ( LRC ), is a model that describes the participation by various roles in completing tasks or deliverables [4] for a project or business process.

  15. PMP® Exam Tip: The Responsibility Assignment Matrix (RAM)

    A Responsibility Assignment Matrix (RAM), also known as RACI matrix or Linear Responsibility Chart (LRC), describes the participation by various roles in completing tasks or deliverables for a project or business process. ... Test your understanding of the RAM with this sample question from the PMP® Exam Simulator: Sample Question; Answer and ...

  16. PMP Exam Tip: The Responsibility Assignment Matrix (RAM)

    The PMBOK Guide 4th Edition (starting in section 9.1) defines RACI as a responsibility assignment matrix (RAM) which is used to illustrate the connections between work packagers or activities and project team members. On larger projects, RAMs can be developed at various levels.

  17. The Responsibility Assignment Matrix

    The responsibility assignment matrix, also known as RAM, is a helpful tool used in project management to identify and clarify the roles and responsibilities of each team member. It ensures that every team member understands their duties and how they fit into the project plan. Using RAM in project management helps define roles and ...

  18. Creating a Responsibility Assignment Matrix (RAM ...

    A diagram or chart showing assigned responsibilities for elements of work. It is created by combining the work breakdown structure (WBS) with the organisational breakdown structure (OBS). The APM (BoK 6th edition) further states that a RAM is used to assign the work packages to the people responsible for creating the project's output.

  19. Responsibility Assignment Matrix (RAM)

    Responsibility Assignment Matrix. The RAM in project management can be called by two names: RAM Resource Allocation Matrix. In this use of the term the RAM is a document which aims to allocate the project's resources to key tasks. The same RAM template can be used, however the allocation of resources is an exercise performed in the early ...

  20. What Is a Responsibility Assignment Matrix (RAM)?

    Introduction to Responsibility Assignment Matrix (RAM) Project management is a complex process that involves multiple stakeholders, tasks, and resources. To ensure the success of a project, it is crucial to assign clear roles and responsibilities to team members and accurately define their tasks. One tool that can help project managers achieve ...

  21. Project RAM Detail: Responsibility Assignment Matrix (RAM)

    The document is a responsibility assignment matrix (RAM) for a project. It lists the project name and manager at the top. The matrix assigns responsibility codes like "A" for accountable or "I" for input required to project team members and work breakdown structure activities. Names and roles are entered along the top and the activities list is to be modified to fit the project. More rows can ...

  22. Responsibility Assignment Matrix (RAM) Template 2

    Responsibility Assignment Matrix (RAM) Template 2 - Free download as Excel Spreadsheet (.xls / .xlsx), PDF File (.pdf), Text File (.txt) or view presentation slides online. The document provides instructions for completing a responsibility assignment matrix (RAM) for a project. It instructs the user to add or remove project roles as needed, insert key tasks and deliverables by project phase ...

  23. Responsibility Assignment Matrix (RAM)

    The Responsibility Assignment Matrix (RAM) is a graphic representation that reflects the integration of project participants such as work teams, subcontractors, and internal organizations with individual Contract Work Breakdown Structure (CWBS) elements to form Control Accounts (CA). The RAM shows the WBS on one axis and the Organizational ...