Free Crane and Rigging Safety PowerPoints

Here is a collection of free cranes and rigging safety PowerPoints. For a complete training kit that includes a customizable PowerPoint, safety plan, and forms, check out the Cranes and Slings Compliance Kit .

These materials are not owned or endorsed by XO Safety or Affordable Safety Training LLC. Use them at your discretion.

Cranes & Derricks PowerPoint

This PowerPoint goes into great detail of the OSHA standard.

Author: Neal, Kuhn & Huffsteder, Inc.

Download Cranes & Derricks PowerPoint

Crane PowerPoint

This crane presentation has a good overview of the basics of crane safety and inspections.

Slides : 44

Author : United States Mine Rescue Association

Download Free Crane PowerPoint

Basic Rigging PowerPoint

This has a lot of great information necessary for safely rigging. It contains some very useful visuals.

Slides : 37

Download Basic Rigging PowerPoint

Cranes PowerPoint

This PowerPoint provides detailed information on construction crane safety regulations.

Slides : 38

Author : OSHA Office of Training & Education

Download Cranes PowerPoint

Cranes and Slings Safety Training Compliance Kit

If you are looking for a great OSHA compliant training program for cranes and slings, this compliance kit has everything you need. It contains a PowerPoint ® presentation, training documents, a hands-on evaluation and more!

Cranes and Slings Safety Training Compliance Kit

A short sentence describing what someone will receive by subscribing

Downloadable Videos

Compliance Kits Can Be Downloaded

30 Day Money Back Guarantee

Not Satisfied? Let Us Know For A Full Refund

Expert Owned

Certified Safety Experts

Secure payments

Payment Information Not Stored

  • Opens in a new window.

overhead crane training powerpoint presentation

  • Chains, Ropes, and Slings II

See more about these products

National Commission for the Certification of Crane Operators

CERTIFICATIONS

  • Mobile Crane Operator |
  • Service Truck Crane Operator |
  • Tower Crane Operator |
  • Overhead Crane Operator |
  • Articulating Crane Operator |
  • Digger Derrick Operator |
  • Dedicated Pile Driver Operator |
  • Drill Rig Operator |
  • Concrete Pump Operator |
  • Telehandler Operator |
  • Signalperson |
  • Crane Inspector |
  • Lift Director

Overhead Crane Operator

  • Certification Overview |
  • Written Exam |
  • Practical Exam |
  • Exam Fees |
  • Recertification

Certification Overview

How to become cco-certified.

Visit  How to Test  for instructions on applying for and taking CCO Written and Practical Exams; visit  How to Recertify  for instructions on recertification.

Complete instructions, exam contents, and candidate applications are also contained in the  Candidate Handbook  for each program.

ELIGIBILITY

  • Be at least 18 years of age
  • Comply with NCCCO's Substance Abuse Policy
  • Pass Written Examination
  • Pass Practical Examination (Candidates must pass the Written and corresponding Practical examination within a 12-month timeframe.)
  • Comply with the Code of Ethics

CCO WRITTEN EXAMINATIONS

The Overhead Crane Operator written exam consists of a single examination in Overhead Crane operation. This examination has 65 multiple-choice questions and candidates are allowed 60 minutes to complete the exam. Candidates may take their written and practical exams in either order. Candidates have 12 months from the time they pass the initial written or practical exam they take to pass the corresponding (written or practical) exam.

CCO has three options for taking written exams:  Online Proctored Testing (OPT) ,  Test Center Testing (TCT) , and  Event Online Testing (EOT) .  Decide which option is best for you .

CCO PRACTICAL EXAMINATIONS

The CCO Practical Examination demonstrating crane operator proficiency is available in either of the following Overhead Crane types:

  • Cab Operated
  • Pendant/Remote Control 

A candidate must pass both the Written and Practical examinations to be certified for a five-year period.

CCO CERTIFICATION TIME FRAMES

Candidates must pass both Written and Practical Examinations to be certified for a five-year period. The Written and Practical Exams may be taken in either order. Candidates have 12 months from the time they pass their first Written or Practical Exam for each crane type in which to pass the corresponding (Written or Practical) Exam.

Any tests passed within a 12-month period count towards certification. For example, a candidate who fails the Overhead Crane Operator Written Exam in January 2015 but passes the Overhead Crane Operator Practical Exam in June 2015 has until the end of June 2016 to retake and pass the Overhead Crane Operator Written Exam.

If a certified operator subsequently becomes certified in an additional operator designation by taking the appropriate written and practical exams, the certification period for the additional designation expires at the same time his/her original certification (i.e., all operator designations expire on the same date, regardless of when in the five-year certification period the candidate passed them). If the new designation is added within the final 24 months of his/her certification period, the certificant is exempt from recertifying for the new designation after five years; after that, however, certificants must recertify for all designations during the 12 months prior to their certifications’ expiration date. This ensures that all of the certificant’s operator designations maintain the same expiration date.

Candidates for certification or recertification may petition for an extension of NCCCO’s standard timeline(s). NCCCO staff shall have the discretion to make the initial determination of whether a requested extension should be granted. Petitions for an extension of time are generally denied absent a showing of extraordinary circumstances. Denials of such petitions may be appealed to the Appeals Committee.

CERTIFICATION POLICIES

The following policies apply to all CCO certification programs:

  • NCCCO Code of Ethics
  • Disciplinary Policy
  • Substance Abuse Policy
  • Testing Accommodations Policy
  • Change of Address Policy
  • Appeals Policy and Procedures
  • Information Release Policy
  • Administrative Complaints Policy

These policies are also covered in the  Candidate Handbooks for each program.

CERTIFICATION CARDS

Certified operators receive a laminated photo ID card at no cost when they certify, add a designation, or recertify.

Replacement cards may be obtained from NCCCO at a cost of $25 and ordered online .

Certification cards remain the property of NCCCO, are not transferable, and must be returned to NCCCO upon demand.

RECERTIFICATION REQUIREMENTS

CCO certification is valid for five years. Candidates must complete all of their recertification requirements during the 12 months prior to their expiration date.

Review recertification requirements  for Overhead Crane Operators.

Get complete instructions on How to Recertify .

PROGRAM SPONSORS

The National Commission for the Certification of Crane Operators gratefully recognizes the sponsors of the Overhead Crane Operator Certification Program:

Crane Manufacturers Association of America (CMAA) American Crane & Equipment Corp. Demag Cranes & Components KCI Konecranes Morris Material Handling OMI Hoist & Crane Virginia Crane (Foley Material Handling) ACE World Companies Capco Crane & Hoist Deshazo

overhead crane safety

Overhead Crane Safety

Sep 07, 2011

920 likes | 1.87k Views

Overhead Crane Safety. Bureau of Workers’ Comp PA Training for Health & Safety (PATHS). 29 CFR 1910.179. Overhead Crane Defined. Overhead Crane A crane with a movable bridge carrying a movable or fixed hoisting mechanism and traveling on an overhead fixed runway structure.

Share Presentation

  • overhead crane
  • written record
  • unsafe overhead crane
  • maintenance equipment removed prior

libitha

Presentation Transcript

Overhead Crane Safety Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) 29 CFR 1910.179 PPT-080-01

Overhead Crane Defined Overhead Crane A crane with a movable bridge carrying a movable or fixed hoisting mechanism and traveling on an overhead fixed runway structure. PPT-080-01

Parts of an Overhead Crane PPT-080-01

Types of Overhead Cranes Gantry Semi-Gantry Cantilever Gantry Storage Bridge Wall Cranes PPT-080-01

Types of Hoists PPT-080-01

New Overhead Cranes All new overheard cranes constructed and installed on or after August 31, 1971, shall meet the specifications set forth by the American National Standard Safety Code for overhead and gantry cranes, ANSI B30.2.0-1967. PPT-080-01

Modifications Cranes may be modified and rerated if the modifications and the supporting structure are checked thoroughly for the new rated load by a qualified engineer or the equipment manufacturer. The new rated load must be plainly marked on each side of the crane. If the crane has more than 1 hoisting unit, both shall have its rated load marked on them and shall be clearly legible from the ground or floor. PPT-080-01

Initial Crane Inspection Items to be inspected prior to each shift of operation: Hoisting and lowering Trolley travel Bridge travel Limit switches, locking and safety devices Trip setting of hoist limit switches Load test of no more than 125% of rated load PPT-080-01

Visual Crane Inspection Check for any loose or missing parts. Check end stops. End stops prevent the trolley from running off the beam. Know the location of disconnect switch that will cut the power off only to the hoist or crane. Be sure it is readily accessible and not blocked. Make sure wire rope is properly seated in its drum and sheave grooves without any slack or overlapping. PPT-080-01

Frequent Inspections Items to be inspected: Operating mechanisms for maladjustment (Daily) Deterioration or leakage in pneumatic and hydraulic parts (Daily) Hooks with deformation or cracks – visual (Daily) Hooks with deformation or cracks – written record with signature of inspector and date – (Monthly) PPT-080-01

Frequent Inspections Items to be inspected: Hoist chains and end connections for wear, twist or distortion – visual (Daily) Hoist chains and end connections for wear, twist or distortion – written record with signature of inspector and date (Monthly) Running Rope and end connections for wear, broken strands, etc. – written record with signature of inspector, rope identity and date – (Monthly) PPT-080-01

Frequent Inspections Items to be inspected: Functional operating mechanisms for excessive wear (As Needed) Rope reeving according to manufacturer’s recommendations (As Recommended) PPT-080-01

Periodic Inspections Items to be inspected at intervals of 100 to 500 hours of use: Deformed, cracked or corroded members Loose bolts or rivets Cracked or worn sheaves and drums Worn, cracked or distorted parts, such as pins, bearings, gears, rollers, etc. Excessive wear on brake-system parts PPT-080-01

Periodic Inspections Items to be inspected at intervals of 100 to 500 hours of use: Inaccuracies in load, wind and other indicators Electric or fossil fuel motors Excessive wear of chain drive sprockets and chain Deteriorated electrical components, such as pushbuttons, limit switches or contactors PPT-080-01

Annual Inspections Annual inspections shall be performed at a minimum of once every 12 months, regardless of the severity of the crane usage. PPT-080-01

Written Report A written report should contain any deficiencies or damage to the crane that need to be corrected or repaired on a scale of importance that is called out in the body of the report. Written reports shall be kept by a designated person, on the company premises, so as to be available upon request by any regulatory person or agency. PPT-080-01

Maintenance A preventive maintenance program based on the crane manufacturer’s recommendations must be implemented Any unsafe conditions that are detected during the required inspections must be corrected prior to using the crane Only trained, designated personnel should perform the required maintenance and repairs PPT-080-01

Maintenance The following procedures must be followed when performing maintenance: The crane to be repaired must be located where it will cause the least interference with other cranes and operations in the area. All controllers must be at the off position. The main or emergency switch must be open and locked-out in the open position. Adequate lighting while maintenance is being performed. PPT-080-01

Maintenance Warning or out-of-order signs must be placed on the crane and on the floor beneath or onthe hook where visible from surface level. All guards must be reinstalled, safety devices reactivated and maintenance equipmentremoved prior to placing the crane back into operation. Overhead and Gantry Cranes - Where other cranes are in operation on the same runway,rail stops should be in place. PPT-080-01

Before Moving a Load • Ensure all loose materials, parts, blocking and packing have been removed from the load before lifting. • Remove any slack from the sling and hoisting ropes before lifting the load. • Make sure that the lifting device seats in the saddle of the hook. PPT-080-01

Operation The crane warning signal or horn must be sounded when the load comes near personnel. Loads should not be carried over personnel. A load should not be left suspended. Audible and voice communication should be kept with the operator at all times, if not a standard signal system should be used. PPT-080-01

Operation Operators cannot be engaged in activities that distract her or his attention while operating the equipment (for example, no cellular phone use unless used for signaling). PPT-080-01

Operation KEEPING CLEAR OF THE LOAD When workers must be in the fall zone to handle a load, the load must be rigged by a qualified rigger. PPT-080-01

To Avoid Swinging Loads • Locate the hoist directly above the lifting point of the load before lifting. • Lower loads directly below the hoist. • Keep hoisting ropes vertical. Do not pull or push the load. • Maintain two full wraps of cable on the hoisting drum. PPT-080-01

Lifting Loads at or Near Capacity • Test the hoist brakes by returning the master switch or push button to the “OFF” position after raising the load a few inches off the floor. • If the brakes do not hold, lower the load to the floor slowly and do not operate the crane. • Report the situation immediately and DO NOT USE until repaired. PPT-080-01

Leaving an Overhead Crane • Never leave the controls unattended while a load is suspended. • If it becomes necessary to leave the controls, lower the load to the floor. • Familiarize yourself with the location of the disconnect switch. • If loss of electrical power occurs, place controls in the “OFF” position to prevent unexpected startup upon restoration of power. PPT-080-01

Unsafe Overhead Crane • Disconnect power to a hoist that is unsafe or in need of repair. • Arrange to have the disconnect switch locked and the control panel tagged with an “Out of Order”or “Do Not Operate” tag. • Never operate a hoist that has been tagged with an “Out of Order” or “Do Not Operate” tag, or in your opinion, is UNSAFE TO OPERATE… PPT-080-01

Rigging Equipment/Slings PPT-080-01

Sling Load Capacity & Angles • The load capacity of the sling is • determined by its weakest component. • Never overload a sling.  • Remember, the wider the sling “legs” are spread apart, the less the sling can lift! PPT-080-01

Sling Inspections • All slings are to be inspected each day prior to their use. • This includes chain, wire rope and synthetic slings and their attachments, i.e. master links, alligators, clips, hooks, quick-alloys etc. • A thorough facility-wide inspection is required to be performed at least once every 12 months. PPT-080-01

Sling Inspections • What is the capacity of the sling? • The tag must be present. (All Slings) PPT-080-01

Sling Inspections What is the condition of the sling? Look for damage from: Chemicals, stress, wear, cracks, knots, heat, kinks, melting, snags, tears, etc. PPT-080-01

Damaged Sling • Take it out of service. • Tag it! • Contact your supervisor to get the item repaired or replaced. PPT-080-01

Safe Usage • Slings should be stored off of the floor and hung on racks whenever possible in a clean, dry environment. • Never drag slings across the floor.  • Always hook with a “closed hook” arrangement (hooks facing out). PPT-080-01

Overhead Crane Accidents PPT-080-01

Overhead Crane Accidents Is this safe? No Way! PPT-080-01

Operation-What to Avoid Do not operate a crane if limit switches are out of order, or if cables show defects. Do not allow anyone to ride on a load or hooks. Do not leave slings dangling from the load hook. Have sling hooks placed on the sling ring when carrying slings to the load. PPT-080-01

Operation-What to Avoid • Do not raise loads higher than necessary to clear objects. • Do not pass a load over workers. • Do not reverse a motor until it has come to a full stop except to avoid accidents. • Do not walk on the crane runway. • Do not leave suspended loads unattended. PPT-080-01

Clearance from Obstructions A minimum clearance of 3” overhead and 2” laterally shall be provided and maintained between the crane and obstructions. * * Crane Manufacturers Association of America, Inc., Specification No. 61 PPT-080-01

Bottom Line Inspect your crane/hoist before use. Inspect slings prior to use, removing from service any in question. Remember the effect of sling angles on load capacities. Properly store slings when finished to avoid damage. PPT-080-01

Contact Information To contact a Health & Safety Training Specialist: Bureau of Workers’ Compensation 1171 South Cameron Street Room 324 Harrisburg, PA 17104-2501 717-772-1635 [email protected] Like us on Facebook! - https://www.facebook.com/BWCPATHS PPT-080-01

Questions PPT-080-01

  • More by User

OVERHEAD CRANE SAFETY

OVERHEAD CRANE SAFETY

OVERHEAD CRANE SAFETY. OVERHEAD AND GANTRY CRANE OPERATION. Hoist operators must inspect equipment daily before use. Do not operate a crane or hoist if limit switches, steel ropes, chains or other components are worn or in disrepair.

2.83k views • 18 slides

Overhead Crane Safety and Inspection Requirements

Overhead Crane Safety and Inspection Requirements

Overhead Crane Safety and Inspection Requirements. Notice.

2.19k views • 69 slides

Operate an overhead crane

Operate an overhead crane

Operate an overhead crane. P&P3EL Basics of overhead crane operations. P&P3CR Practical forklift operations. Operate an overhead crane. Modules. Topics. Notional Hours. 10 10 24 16 60. TE314 Understanding the basics of overhead lifting operations.

406 views • 10 slides

OVERHEAD CRANE SAFETY

OVERHEAD CRANE SAFETY. F&T Inc. OVERHEAD AND GANTRY CRANE OPERATION. Hoist operators must inspect equipment daily before use. Do not operate a crane or hoist if limit switches, steel ropes, chains or other components are worn or in disrepair.

560 views • 18 slides

OSHA BASIC OVERHEAD CRANE COMPLIANCE

OSHA BASIC OVERHEAD CRANE COMPLIANCE

OSHA BASIC OVERHEAD CRANE COMPLIANCE. JAMES M. CLEM TEXAS PETRO-CHEM SPECIALIST (361) 774-7607 [email protected]. OSHA 1910.79 OVERHEAD AND GANTRY CRANE REGULATIONS INSPECTION CLASSIFICATION SECTION J-1 (I) (II).

1.22k views • 35 slides

Operate an overhead crane

Operate an overhead crane. P&P4EL Basics of overhead crane operations. P&P4CR Practical forklift operations. Operate an overhead crane. Modules. Topics. Notional Hours. 10 10 24 16 60. BE414 Understanding the basics of overhead lifting operations.

515 views • 10 slides

Designing and manufacturing overhead crane

Designing and manufacturing overhead crane

Designing and manufacturing overhead crane. Omar Jaafar Hassan 199900307 Humaid AL-Marzoqi 200000181 Khalid AL-Hasani 199900342 Zayed AL-Katheeri 199900295 Advisor Prof. Kamal A.F.Moustafa. Crane Mechanism.

1.01k views • 40 slides

Operate an overhead crane

Operate an overhead crane. P&P4EL Basics of overhead crane operations. P&P4CR Practical forklift operations. Operate an overhead crane. Modules. Topics. Notional Hours. 10 10 24 16 60. RE407 Understanding the basics of overhead lifting operations.

324 views • 10 slides

Overhead Travelling Gantry Crane

Overhead Travelling Gantry Crane

Sehnaoui plant group of companies presents overhead travelling gantry crane for construction development, which carried heavy equipment one place to another place.

258 views • 2 slides

Overhead Gantry Crane Manufacturer

Overhead Gantry Crane Manufacturer

Rosava Engineering Group offer Gantry Crane manufacturer. We are manufacturer, supplier, and exporter of Overhead Gantry Crane. We manufacture both type’s single and double girder overhead cranes. Our firm is highly involved in the process of manufacturing and supplying a wide range of best quality heavy duty Electric Overhead Traveling Cranes. Gantry Crane manufacturer http://www.rosavagroup.com

82 views • 3 slides

overhead crane manufacturer

overhead crane manufacturer

Find more information

36 views • 2 slides

C6 Overhead crane course Brisbane

C6 Overhead crane course Brisbane

Book C6 Overhead crane course Brisbane for getting actual knowledge about it AT https://ascenttrainingsolutions.com.au/courses/c6-crane-training/ Find us On Google Map : https://goo.gl/maps/oNVbw5SAn3J2 If you are looking for a sector that can provide a reasonably secure job, you may consider becoming the operator of heavy machines. Since these professionals are highly trained, they rarely get sacked unless they commit grave errors. Since a high degree of expertise is required, the pay is also quite high. However, to ensure that you get a good job, you will have to obtain training from a good institute. Book C6 Overhead crane course Brisbane for getting actual knowledge about it. Social : https://followus.com/ascenttraining https://kinja.com/dogmancoursebrisbane http://dogmancoursegoldcoast.strikingly.com/ Office Address: 25 Shannon Pl, Virginia, Queensland, Australia 4014 Email: [email protected] Phone Numbers: (07) 5658 0040 , 61 07 5658 0040 , 61 0404 765 828 Deals in : C6 Crane operator training Brisbane C6 crane license Brisbane C6 crane training Brisbane C6 crane ticket Brisbane

161 views • 15 slides

Overhead Crane Manufacturers in Philippines

Overhead Crane Manufacturers in Philippines

If you are looking for the Overhead crane manufacturers company in the Philippines. Then, As an individual from the Crane Manufacturers Association of the Philippines (MHE Damag), our crane specialists can help to buy the correct cranes.

97 views • 6 slides

About 30 Ton Overhead Crane

About 30 Ton Overhead Crane

There are many heavy-duty cranes in China and 30 Ton Overhead Crane is one of them. This crane can usually be found in a warehouse, factory, stuff yard, etc. to lift and transfer heavy goods from one place to another.

39 views • 3 slides

OVERHEAD CRANE SAFETY

407 views • 18 slides

Operate an overhead crane

122 views • 10 slides

Getting To Know About Overhead Travelling Crane

Getting To Know About Overhead Travelling Crane

A Crane Is A Mechanical Device Needed For Pulling Heavy-Duty Products. The Single Girder Overhead Crane Offers One The Crane Attributes And Types Of Crane. Some Other Cranes Will Be Air-Powered. Cranes Come In Versatile Styles And Are Employed With Several Attachments To Facilitate Load Lifting.

46 views • 2 slides

Get Overhead Crane Training Operator Certification

Get Overhead Crane Training Operator Certification

At safetyfirsttraining, get your overheard crane training operator certification. Our safety course will give you training about all types of overhead cranes, equipment handling and safer operation procedure. Visit website for more info!

49 views • 1 slides

Double Girder Overhead Crane - Ganesh Engineering

Double Girder Overhead Crane - Ganesh Engineering

Ganesh Engineering is one of the best Double Girder Overhead Crane Manufacturers and Suppliers in India. This crane is helpful in carrying medium to heavy-duty goods, saving a lot of time and boosting overall production. For further information, please visit our website.

66 views • 6 slides

Overhead Crane Training in Riverside, CA

Overhead Crane Training in Riverside, CA

Discover comprehensive Overhead Crane Training services at AP Crane Training. Gain the skills and knowledge needed to operate overhead cranes safely and efficiently. Our expert trainers offer industry-leading courses to ensure compliance and enhance workplace safety

22 views • 2 slides

Overhead Bridge Crane | Loadmate.in

Overhead Bridge Crane | Loadmate.in

Loadmate.in is the best overhead bridge crane manufacturer and supplier in India. We offer a wide range of overhead bridge cranes that are perfect for your needs. To learn more about us, visit our site.] https://loadmate.in/blog/what-is-a-bridge-in-eot-crane/

8 views • 4 slides

Overhead Crane Maintenance in Dubai

Overhead Crane Maintenance in Dubai

Elevator manufacturers use their expertise in project management to manage every aspect of the installation process, from preliminary site surveys to design advice to material procurement, which establishment and commissioning. Industry experts also advise investing in elevator maintenance and overhead crane maintenance from time to time. A successful elevator installation project in Dubai requires careful planning, planning and execution to adhere to strict timelines and quality standards.

IMAGES

  1. OSHA Overhead Crane Instructor Package

    overhead crane training powerpoint presentation

  2. Overhead Crane Training

    overhead crane training powerpoint presentation

  3. PPT

    overhead crane training powerpoint presentation

  4. Training Program-Vital part of modern industry and construction

    overhead crane training powerpoint presentation

  5. Overhead Crane Safety Poster

    overhead crane training powerpoint presentation

  6. Overhead Crane Safety

    overhead crane training powerpoint presentation

VIDEO

  1. Over head and gantry crane oprtr training

  2. Overhead Crane Maintenance and Inspection Training

  3. Single Girder Overhead Crane 1 Ton to 20 Ton, 3 D Presentation , Crane and Hoist Travelling

  4. Tower Crane Signal Man Training

  5. Amazing Crane Erection #shorts #viral #tranding#eot crane

  6. What is OverHead Crane || Crane Inspection and Operation Safety || Parts of Crane || HSE TRAINER

COMMENTS

  1. Overhead Crane Safety Training Powerpoints

    Over-head Crane Operators by LCS Online. Number of Slides: 36. Created By: LCS Online. Download Atlantic Training's collection of safety training PowerPoints from around the web to train your team on important EHS Safety topics today. Over head Crane Safety Training by F&T Inc. Number of Slides: 18.

  2. Crane, Lift, and Sling

    From the OSHA Office of Training and Education, this presentation covers the rules and safety precautions when using cranes. Provides an indepth look at 29 CFR and discusses precautions that all employers must take to insure safety. An examination of 29 CFR 1910.179 regarding the safe use of cranes and slings.

  3. Free Crane and Rigging Safety PowerPoints

    Here is a collection of free cranes and rigging safety PowerPoints. For a complete training kit that includes a customizable PowerPoint, safety plan, and forms, check out the Cranes and Slings Compliance Kit. These materials are not owned or endorsed by XO Safety or Affordable Safety Training LLC. Use them at your discretion.

  4. Overhead Crane

    Overhead Crane. The document provides safety guidelines for operating overhead cranes and hoists. It states that equipment must be inspected daily for wear and damage before use. Operators should warn others to stay clear of lifted loads and never allow anyone to ride the hook or load. Loads should be lifted smoothly and directly below the ...

  5. PPT

    Overhead Crane Training Overhead Bridge and Gantry Safety Crane Training 29CFR 1910.179(A)(35),(B)(8)ASME B30.2 Overhead bridge and gantry safety is important for operators and supervisors. Operators are responsible for the daily operations and safe performance of cranes at all times. All Purpose Crane Training gives the operators the knowledge to operate safely and reduce accidents which ...

  6. Free Overhead crane Training Presentations for Powerpoint

    Update your overhead crane training from powerpoint presentations to mobile-friendly microlessons. Modernize your overhead crane training presentation and make it accessible anytime, anywhere. Save valuable company time by making your overhead crane training PowerPoint mobile-friendly and completable in 5 minutes with our AI Doc Transformer ...

  7. Electrical overhead crane safety

    2 likes • 1,817 views. aliashraf mohammady. Follow. safety and critical inspection of Electrical overhead cranes. Engineering. 1 of 41. Download now. Download to read offline. Electrical overhead crane safety - Download as a PDF or view online for free.

  8. Cranes

    If it becomes necessary to leave the controls, lower the load to the floor. 26 slides. Safe Operations of Cranes, Hoists, and Truck Hoists. Your Safety is the #1 Priority on any job. This program is to be used to ensure a safe working environment during lifting operations utilizing proper equipment. 8 slides.

  9. PPTX University of Texas at Arlington

    ppt/slides/slide13.xmlÜXÛrÛ6 }ïLÿ Ã×F!)R׉œ' «—q Od ‚"Æ € l%"™þCÿ°_Ò HJ¶d×N õAz q]ìî9X,ðæí]ÉÑšjä ñë(@T ™1± ×W³V?@Æb'a. j‚·g?þðF Ï Ì fˆGAa­ †¡! -±y- ЗK]b U½ 3 oAjÉÃv uà 3 ÔóõK ...

  10. Overhead Crane Operators by

    Overhead Crane Operators by. Aug 21, 2016 •. 12 likes • 10,108 views. Atlantic Training, LLC. Follow. Overhead Crane Operators. Business. 1 of 36. Overhead Crane Operators by - Download as a PDF or view online for free.

  11. NCCCO

    The Overhead Crane Operator written exam consists of a single examination in Overhead Crane operation. This examination has 65 multiple-choice questions and candidates are allowed 60 minutes to complete the exam. Candidates may take their written and practical exams in either order. Candidates have 12 months from the time they pass the initial ...

  12. Overhead Crane Operator Safety Training Online

    OSHA 30 Outreach general industry covers 29 CFR 1910 regulations. DOL card included. Quantity. 189.00159.99. Buy Now. BEST SELLER. Individual Course. Crane Rigger and Signalman Operator Safety Training Online. Get trained on the hand signals and gear required for qualified riggers/signalers.

  13. OVERHEAD CRANE SAFETY PowerPoint Presentation, free download

    Overhead Crane Safety. Overhead Crane Safety. Bureau of Workers' Comp PA Training for Health & Safety (PATHS). 29 CFR 1910.179. Overhead Crane Defined. Overhead Crane A crane with a movable bridge carrying a movable or fixed hoisting mechanism and traveling on an overhead fixed runway structure. 1.88k views • 42 slides

  14. PDF Safety Manual For Overhead Crane Operators

    How to avoid an accident when operating an overhead crane. What to do should an accident occur. Training of all riggers should include the following: Company rules, regulations and procedures. The requirements of the Code of Federal Regulation; Title 29, Part 1910.179, Overhead and Gantry Cranes

  15. PDF Online Safety Training

    Online Safety Training

  16. Cranes & Derricks in Construction

    AGC Cranes and Derricks Webinar. A 60 minute PowerPoint presentation with voiceover and question and answers. Crane Safety Awareness For Site Superintendents. OSHA Video, (1992). Discusses some of the hazards and risks involved in crane operations and identifies information managers should be familiar with if cranes are operating on their site.

  17. Overhead Crane Operational Safety Training

    Visit https://goo.gl/6edxbN to view the full video and purchase access to our other Health & Safety (EHS) courses.This training module gives workers an overv...

  18. Crane Safety Training Presentation

    Crane Safety Training Presentation. Apr 30, 2016 • Download as PPTX, PDF •. 15 likes • 9,892 views. FAIZ FAREED. Follow. 1 of 29. Download now. Crane Safety Training Presentation - Download as a PDF or view online for free.

  19. PDF Crane and Hoist Safety Program

    OSHA 29 CFR 1910.179: Overhead and Gantry Cranes OSHA 29 CFR 1926.550: Cranes and Derricks OSHA 29 CFR 1903.1: The General Duty Clause ANSI ANSI/ASME B30 series: Cranes, Derricks, Hoists CCR TITLE 8 Group 13: Cranes and Hoisting Equipment The Crane and Hoist Safety Program is intended to:

  20. PPTX Home

    PK !z 絈?d! [Content_Types].xml ? (? 虤踨? 嗭;觲`疙 Yi? 鉢魀誄f?€ k?$ 捿 +?? { o2慳w?-烃+壣齭?+(U&x 襤 ?慺| ?熅宯翤i芐? q?

  21. BSSC-TRN-M-019 EOT Overhead Crane Operator Training

    BSSC-TRN-M-019 EOT Overhead Crane Operator Training - Free download as Powerpoint Presentation (.ppt / .pptx), PDF File (.pdf), Text File (.txt) or view presentation slides online. This document provides an overview of electric overhead traveling cranes (EOT), including: - Types of EOT cranes like top running bridge cranes, underslung bridge cranes, gantry cranes, and light crane systems.

  22. Overhead Crane Safety Training PowerPoint Presentation Template

    Features: 25 unique slides. 100% customizable and easy to edit. Free to download as a PowerPoint template, Google Slides theme, and Figma deck. 16:9 widescreen layout. Professional design that can be used for many topics. Feature-rich background with various examples for graphs, maps, lists, timelines, and mockups.

  23. PPT

    Overhead Crane Safety Bureau of Workers' Comp PA Training for Health & Safety (PATHS) 29 CFR 1910.179 PPT-080-01. Overhead Crane Defined Overhead Crane A crane with a movable bridge carrying a movable or fixed hoisting mechanism and traveling on an overhead fixed runway structure. PPT-080-01. Parts of an Overhead Crane PPT-080-01. Types of Overhead Cranes Gantry Semi-Gantry Cantilever Gantry ...