Accessibility Links

  • Skip to content
  • Skip to search IOPscience
  • Skip to Journals list
  • Accessibility help
  • Accessibility Help

Click here to close this panel.

Purpose-led Publishing is a coalition of three not-for-profit publishers in the field of physical sciences: AIP Publishing, the American Physical Society and IOP Publishing.

Together, as publishers that will always put purpose above profit, we have defined a set of industry standards that underpin high-quality, ethical scholarly communications.

We are proudly declaring that science is our only shareholder.

Value engineering application in a high rise building (a case study in Bali)

Putri Arumsari 1 and Ricco Tanachi 1

Published under licence by IOP Publishing Ltd IOP Conference Series: Earth and Environmental Science , Volume 195 , The 2nd International Conference on Eco Engineering Development 2018 (ICEED 2018)5–6 September 2018, Alam Sutera Tangerang, Indonesia Citation Putri Arumsari and Ricco Tanachi 2018 IOP Conf. Ser.: Earth Environ. Sci. 195 012015 DOI 10.1088/1755-1315/195/1/012015

Article metrics

4056 Total downloads

Share this article

Author e-mails.

[email protected]

Author affiliations

1 Civil Engineering Department, Faculty of Engineering, Bina Nusantara University Jakarta, Indonesia 11480

Buy this article in print

Finding affordable alternatives material to replace the initial design of the architecture work of a commercial high rise building project without reducing the value of the material itself. Then analysing the cost saved from applying the value engineering in the architecture work of a high rise building. Calculation through the value engineering process was conducted. A commercial high rise building in Bali was chosen as a case study to implement the value engineering process in the design stage. The value engineering stages included calculating the cost/worth function, analysing through Function Analysis System Technique (FAST), innovation and creativity stage, evaluation of the life cycle cost, decision analysis and last the decision making. The research found that by applying value engineering through several items of work in a commercial high rise building it could save up to up to 8% of the total cost of the architecture work. The architecture work that was analysed through value engineering were the wall work, the door work, the floor work and the sanitary work. These were found to be the most effecting result from the Pareto calculation. The application of value engineering is this research was only done in one commercial high rise building in Bali. The work analysed was also only the architecture work. Therefore other types of construction project might result in different value of cost saving. This research identifies the cost saved through the application of value engineering in a commercial high rise building in Bali, which emphasizes on high quality materials in the architecture work. This research will contribute to the study literature of value engineering with a case study of commercial high rise building.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence . Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

  • Open access
  • Published: 02 June 2022

Evaluation of influential value engineering factors on the function of interchanges: case studies in Iran

  • Mohsen Jafari Nigjeh 1 &
  • Nima Amani   ORCID: orcid.org/0000-0002-8551-9519 2  

Journal of Engineering and Applied Science volume  69 , Article number:  48 ( 2022 ) Cite this article

2244 Accesses

Metrics details

In Iran, recently in large-scale projects, the science of value engineering has become very important and in order to show the significant impact of value engineering results in increasing efficiency and reducing the cost of projects, the reason for choosing this research. The experience of value engineering in the developed countries shows the significant effect of this method in the value optimization of plans and projects. This research, too, aims to evaluate the effects of value engineering on the performance of interchanges in Iran, so that with comparing their results, the most important qualitative parameters can be determined, and also to present a suitable model for cost reduction per each IRR of the value engineering study’s expenses. The first part of this research will give a short introduction on value engineering and its job plan, and then, 8 value engineering studies of interchanges in the cities of Tehran, Karaj, Shiraz, and Mashhad will be qualitatively and quantitatively analyzed, and their results as a qualitative and quantitative evaluation (including construction cost, total value index, and relative value index) will be compared with the base plan of the projects and also with each other. Finally, the outcome of the research will show that among the evaluation parameters, the acquisition parameter plays a significant role in choosing the best design in value engineering, some part of which depends on the employer’s view in this regard. In the next step, the best improvements were in reducing travel time and in increasing safety, and also the most neglected parameter in the value engineering analyzed here is environmental improvements, which demands especial attention. From this research, it can be concluded that per every one IRR of expenditure on performing value engineering studies, the total cost of interchange projects in Iran is reduced by 334 IRR.

Introduction

Value engineering is a systematic attempt which aims to study and analyze all of the operations of a project from its conception up to the design stage and then initiation and utilization and is considered as one of the most effective and important economical methods in the engineering field [ 24 ]. In the framework of project management, value engineering is paying attention to all of the components of the design and at the same time not taking for granted any part of the project [ 1 ]. The goal in VE is reducing the time needed to reach initiation stage without increasing the cost or lessening the quality of the work [ 9 ]. Project management is planning and directing the project in a framework of specific time, cost, and quality constraints toward its specific results [ 6 ]. Standing (2001) considers VE as a project with minimum cost which includes due assessment and elimination of unnecessary costs without having detrimental effects on safety, quality, reliability, implementation method, and delivery [ 32 ]. In this paper, 8 VE case studies on Iranian interchanges are used, enabling this research to identify and analyze the benefits of the successful application of value engineering in enhancing the quality of interchange projects. The goal of this paper is the qualitative and quantitative measurement and evaluation of the effective factors of VE projects on interchanges and extracting the shared effects in order to increase quality, performance, and value index of such projects. This research will determine the amount saved for the cost of value engineering projects in Iranian interchanges. To conduct this research, extensive studies in this field have been conducted from various sources, and their impact and results have been used (Elhegazy H (2021) [ 13 ], Elzarka et al., (2016) [ 11 ], Chakraborty et al., (2020) [ 10 ], Chakraborty et al., (2016) [ 11 ], Dell'isola (2017) [ 12 ], Elmousalami [ 18 ], Kumar and Gururaj [ 22 ], Swei et al. [ 33 ], Elhegazy et al., (2020, 2021, 2022) [ 14 , 15 , 16 , 17 ], Wang et al., (2017) [ 36 ], Zhong et al., (2022) [ 37 ]).

Value engineering basics

Value engineering is a powerful methodology when it comes to problem-solving, cost reduction, and at the same time improving performance and quality, which by identifying and enhancing value indices, and applying creativity, increases client satisfaction and the value of investment.

Value engineering job plan

A value engineering job plan is comprised of three stages (Iyer, 2009) [ 20 ]:

Value engineering or value analysis workshop

After study

Each stage having a job plan as is shown in Table 1 [ 8 ].

Value analysis plan includes operational implementation steps of value methodology [ 23 ]. In fact, that which Miles and the people coming before him were doing was the application of this key stage. The second stage has 6 steps which are applied in order as depicted below. The International Society of American Value Engineers (SAVE) has proposed the job plan depicted in Table 2 for the value engineering workshop (SAVE international, 2017 [ 31 ]; Kolano & Eta, 2015 [ 21 ];) (second stage).

The International Society of American Value Engineers (SAVE) has proposed the following procedure (Fig. 1 ) for the steps mentioned in Table 2 [ 21 , 31 ].

figure 1

The schematic of the value analysis process in VE workshop

International experiences regarding value engineering interchanges

The experience of value engineering in the developed and developing countries demonstrates the significant effect that this method has on improving the value of designs and projects. International experience shows that, in a period of 8 years, 2700 value engineering studies have been carried out in the transportation sector of the USA, for which the ratio of cost reduction (with preserving or improving quality and function) to the study costs has been 113 dollars to 1 [ 9 ]. In the US road sector alone in 2008, 382 value studies were carried out. Twelve billion dollars were spent conducting these studies. The approximate total cost of these projects was roughly 30,000 billion dollars. The amount of cost reduction produced as proposals in value engineering workshops was 6500 billion dollars from which 2530 billion was approved. This reported and approved saving shows that for every 1 dollar spent on value engineering, 205 dollars have been saved [ 32 ]. The statistics given here are from the value-engineered projects funded through federal government’s budget, and if we were to include the projects value engineered by private sector contractors, the figures would have been higher. The results produced in the USA illustrate a number of pivotal points:

The strength and accuracy of the base plan (the initial design by the consultant) not only do not preclude value engineering, but it paves the way for presenting new ideas and increasing the value of the project.

Not every value engineering proposal is necessarily approved. In most cases, only 50% of them gets approval.

The reported savings only include construction costs, and if the costs accumulating in the life span of the project were included, the figures would have been significantly higher [ 2 , 32 ].

A well-designed methodological research presents the administrators and engineers of road projects, including interchanges, with the most effective approaches for solving many of the problems they encounter. Although, the growth rate of highway transportation brings more complex problems with itself, which demands special attention on the part of decision makers. All selected projects are among the major and very important projects in Iran, which have been designed and implemented by the most prominent and well-known consultants and contractors, and these projects are among the highest projects in terms of price and cost of work.

For all selected projects, the value engineering discussion has been done extensively and separately by the country’s leading expert consulting engineers, and it has not been possible to provide all the details for each project separately. Therefore, the statistics and results obtained from value engineering, which is completely accurate and specialized, have been used to conduct research, and the results obtained from the value engineering of projects have been transferred and used without any change in the analysis of relevant research data.

At first, in this research, all civil, traffic, construction, economic, value, base plan, and value engineering design studies, were gathered from their respective consulting firms for analysis. The general specifications of the projects and the consulting firms of the base plans and value are presented in Table 3 . The total cost of the base plan is comprise of the construction costs, repair and maintenance, utilization, and land acquisition [ 3 , 4 , 5 , 7 , 19 , 25 , 26 , 27 , 28 , 29 , 30 , 34 , 35 ]. In the next stage, all of the parameters will be qualitatively and quantitatively analyzed.

All selected research projects are among the large and very important and well-known projects in Iran in which value engineering is very important, and in general, it can be said that value engineering reduces costs. A total of 10 to 40% in these projects and due to the budget deficit of many construction projects in Iran, cost reduction is the most important factor in value engineering in this country.

Qualitative analysis

Considering the forms sent to all beneficiary parties of the interchange projects, the parameters deemed important by the beneficiaries and team experts were gathered, integrated, and extracted as is presented here [ 7 , 19 , 27 , 28 , 29 , 30 , 34 , 35 ].

Based on the project value studies of the projects under analysis done by the consulting firms (named in Table 3 ), the evaluated qualitative parameters of the projects are presented in Table 4 .

The value engineering team in each project, noting the location, type, and the particular conditions of that project, compares the qualitative parameters using binary AHP method. Then, for each parameter, a numerical score is calculated, and finally, the parameters having the highest score are chosen for analysis and proceeding with the value engineering process. The scoring is done by binary comparison of the parameters and giving each one a score ranging from 0 to 10, where the sum of score for both of the parameters is 10. The priority and importance of the parameter determine the score it receives, that is, the higher its priority and importance, the higher the score it receives. In such manner, using the binary method, all of the parameters are separately compared, their individual score is calculated, and finally those having a score higher than 5 are chosen. After comparing the parameters using AHP, based on the score they received by the value engineering team of each project being studied, the chosen qualitative parameters were analyzed. Then, all the qualitative parameters of each project were analyzed (according to the Table 4 ), and those parameters which were shared by at least 50% (i.e., 4) of these projects and were among the important qualitative factors were extracted. In the following Table 5 , points (rates) of qualitative parameters in each project can be seen.

In the next stage, we calculated the average score of each parameter for these projects. Table 6 shows the average for the influential parameters determined in the previous stage.

Keeping in mind that the base plan score is evaluated as 5, therefore, by calculating the ratio of the base plan score to that of the calculated average scores from Table 6 , the optimization rates of the qualitative parameters, as shown in Table 7 , are obtained.

Therefore, it can be concluded that the priority of qualitative parameters of interchanges in Iran (according to the conducted case study) and their optimization rate is as shown in Table 8 .

Based on the conducted research, it can be concluded that in Iran, when constructing interchanges, among the qualitative parameters, the acquisition facility has an especial importance for the employer (in most cases the government), as it has the highest optimization rate among the qualitative parameters leaving them behind with a significant margin. It is worth mentioning that in analyzing each project separately, acquisition facility had the highest optimization rate compared to other parameters. This goes to demonstrate that in many of the value-engineered projects, considering the high cost of land and buildings in Iran, the employers in choosing the best option among the value-engineered options, put forward by the value consulting firm, go for the one with no or the fewest number of acquisitions or ultimately the one having the highest acquisition facility.

The other point worthy of attention in this research is that reducing environmental degradation occupies the last place (i.e., it has the least priority) among the important and influential qualitative parameters with an optimization rate of zero. Unlike other countries which place a significant importance on preserving and improving the environment, unfortunately, in Iran, this issue is neglected especially by the governmental employers, which requires reconsideration and more attention.

Quantitative analysis

All of the information and documentations related to the base plan and value engineering studies of the aforementioned projects were analyzed and studied, and the data including the construction cost of the base plan, the construction cost of the top value engineering plan, the total cost of the base plan (comprising of the construction costs, repair and maintenance, utilization, and land acquisition), and the total cost of the value plan of the projects were extracted and are represented here in Table 9 .

For each project, the construction cost reduction is calculated by finding the difference between value plan’s construction cost and construction cost from base plan. Also, the total cost reduction is the result of subtracting the total cost of value plan from the total cost of the base plan (in Table 10 ).

Afterwards, using the value engineering contracts of each project, the cost of value engineering was extracted, and the total sum of the cost of value engineering studies was obtained, and next, the total sum of cost reduction was calculated. To calculate the profit gained for every IRR spent on value engineering (saved amount), the sum of total cost reduction must be divided by the sum of value engineering costs. The resulting figure represents the amount saved for every IRR of value engineering cost (in Table 11 ).

As it can be observed in the table above (Table 9 ), in value engineering interchanges in Iran for every IRR of the cost of value engineering studies, 586 IRR is saved from the total cost. But in order to improve the accuracy of the research, taking into consideration that the initial construction cost of these interchange projects are not identical, and also the size of the projects, a range must be chosen so that the figures obtained can be realistic and credible. To do so, a variance and a standard deviation were calculated using formula 1 , so that the intended range could be calculated using formula 2 . Then eliminating the data outside of that range, the figure given above was fine-tuned.

X m : Total average of saving for every IRR of the cost of value engineering studies of the projects

X i : The amount saved for every IRR of the cost of value engineering study of each project

n : the number of projects

Obtaining the range of the research, it is determined that one of the projects is located outside of the domain, therefore, leaving the numbers for the said project out of the calculations, the amount saved is recalculated as follows (formula 3 ).

The total saving of the projects located inside the obtained range is 2340 IRR, which if it is divided by the number of projects located inside the range, on average, the saving would be 334 IRR for each project. Consequently, it is revealed that for every IRR cost of the value engineering studies conducted for these interchange projects, 334 IRR is saved from the total cost of interchange project in Iran. Accordingly, it can be deduced that for the interchange project in Iran, on average, for every IRR spent on value engineering, 334 is saved from the total cost of these kind of projects, which testifies as to the necessity of value engineering and its tangible effects on interchange projects in Iran. The international experience shows that in federal highway projects, the amount saved for every dollar of the cost of value studies in the year 2009 has been 99 dollars; 2010, 146 dollars; 2011, 80 dollars; 2012, 96 dollars; and in the year 2013, 118 [ 32 ]. In the US road sector alone in 2008, 382 value studies were carried out. Twelve billion dollars was spent conducting these studies. The approximate total cost of these projects was roughly 30,000 billion dollars. The amount of cost reduction produced as proposals in value engineering workshops was 6500 billion dollars, from which 2530 billion was approved. This reported and approved saving shows that for every 1 dollar spent on value engineering, 205 dollars have been saved [ 32 ].

Conclusions

The outcome of this research demonstrates that among the evaluation parameters, the acquisition parameter in interchange projects plays a significant role in choosing the top value engineering plan. As it was mentioned, this partially depends on the views that the employers hold. The highest improvements accomplished were in reducing travel time and increasing safety. The most neglected parameter in the value engineering plans evaluated was improving the environment which demands especial attention. Also, from this research, it can be concluded that for every IRR spent on conducting value engineering studies, 334 IRRs are saved from the total cost of interchange projects in Iran.

The value engineering study should be started in the design stage of interchange projects.

Availability of data and materials

The datasets used and/or analyzed during the current paper are available from the corresponding author on reasonable request.

Abbreviations

The analytic hierarchy process

United States dollar

  • Value engineering

Iranian rial

Amani N, Alipour M (2021) Managing operational strategies to standardize contractors’decisions in construction projects. J Struct Construct Eng 8(8). https://doi.org/10.22065/jsce.2020.232383.2148

Amani N, Derafshi M (2021) Optimal implementation of claim management framework on rubber dam projects with price list contract. J Struct Construct Eng 8(7). https://doi.org/10.22065/jsce.2020.232819.2152

Amani N, Nasly MA, Mohammed AH, Samat RA (2013a) Maintenance and management of wastewater system components using the condition index system, prediction process, and cost estimation. Eksploatacja i Niezawodność 15:161–168

Amani N, Nasly MA, Mohammed AH, Samat RA (2013b) Optimization of time and cost of building component maintenance: a case-study in a five star hotel in Iran. Malaysian J Civil Eng 25:1–8

Amani N, Nasly MA, Hosseini SM (2011) Building component maintenance/repair management: an economic analysis simulation. Appl Mechanic Materials 94-96:2134–2137

Article   Google Scholar  

Amani N, Safarzadeh K (2022) Project risk management in Iranian small construction firms. J Eng Appl Sci 69(7):1–14

Google Scholar  

Behin Taradod Pars Engineers Consulting Firm Co (2010) Pre-study reports and main and final workshop for reforming the intersection of Rezvan and Rahmat. Shiraz, Iran

Bolton JD (2003) Value methodology: a pocket guide to reduce cost and improve value through function analysis. Revaluation Books, Exeter

Boroujerdi M, Ekram Jafari MJ, Jafarpour A, Hashemi SH (2008) “A road map to value engnineering.” 3th National Conference on Value Engineer ing , Tehran, Iran. (in Perisian)

Chakraborty D, Elhegazy H, Elzarka H, Gutierrez L (2020) A novel construction cost prediction model using hybrid natural and light gradient boosting. Adv Eng Inform 6. https://doi.org/10.1016/j.aei.2020.101201

Chakraborty D, Elzarka H, Bhatnagar R (2016) Generation of accurate weather files using a hybrid machine learning methodology for design and analysis of sustainable and resilient buildings. Sustainable Cities Soc 24:33–41

Dell'isola AJ (1997) Value Engineering: Practical Applications for Design, Construction, Maintenance & Operations. Wiley

Elhegazy H (2021) State-of-the-art review on benefits of applying value engineering for multi-story buildings. Intelligent Buildings Int. https://doi.org/10.1080/17508975.2020.1806019

Elhegazy H, Ebid AM, Mahdi IM, Aboul Haggag S, Abdel Rashid I (2020) Selecting optimum structural system for R.C. multi-story buildings considering direct cost. Structures 24:296–303. https://doi.org/10.1016/j.istruc.2020.01.039(1)

Elhegazy H, Chakraborty D, Elzarka H, Ebid AM, Mahdi IM, Aboul Haggag SY, Abdel Rashid I (2022b) Artificial intelligence for developing accurate preliminary cost estimates for composite flooring systems of multi-storey buildings. J Asian Architect Building Eng 21(1):120–132. https://doi.org/10.1080/13467581.2020.1838288

Elhegazy H, Badra N, Aboul Haggag S, Abdel Rashid I (2022a) Implementation of the neural networks for improving the project’s performance of steel structures projects. J Industrial Integration Management. https://doi.org/10.1142/S2424862221500251

Elhegazy H, Ebid A, Mahdi I, Haggag S, Abdul-Rashied I (2021) Implementing QFD in decision making for selecting the optimal structural system for buildings. Construction Innovation 21(2):345–360. https://doi.org/10.1108/CI-12-2019-0149

Elmousalami HH (2019) Intelligent methodology for project conceptual cost prediction. Heliyon 5. Retrieved from. https://doi.org/10.1016/j.heliyon.2019.e01625

Imen Taghatoe Engineers Consulting Firm Co (2013) Pre-study reports and main and final workshop for reforming the intersection of Yadegar Imam and Simon Bolivar, Tehran

Iyer SS (2009) Value Engineering: A How to Manual, 3rd, Management Consultant and Certified Value Engineering Specialist (CVS)

Kolano F, Sprague R, Woodhead R (2015) Value methodology standard and body of knowledge, 2nd edn. Save International, Washington, DC

Kumar P, Gururaj S (2019) Conceptual cost modelling for sustainable construction project planning— a Levenberg-Marquardt neural network approach. Appl Math Inform Sci 13(2):201–208

Miles LD (1989) Techniques of Value Analysis and Engineering, 3th ed. Mc Graw-Hill Co, New York

Mudge AE (2004) Value Engineering: A Systematic Approach. McGraw-Hill, New York, p c1971

Nasly MA, Amani N, Mohammed AH (2012) Prediction simulation process for controlling in maintenance time in the material department. Adv Sci Letters 13:654–657

Nasly MA, Amani N, Samat RA (2011) Developing a framework of economic model for building component lifecycle repair. Adv Mater Res 255-260:3893–3897

Rahab Engineers Consulting Firm Co (2014a) Pre-study reports and main and final workshop for reforming the Chamran and Jalae Ale-ahmad highways intersection, Tehran

Rahab Engineers Consulting Firm Co (2015) Pre-study reports and main and final workshop for reforming Khawrazmi square, Karaj

Rahab Engineers Consulting Firm Co (2014b) Pre-study reports and main and final workshop for reforming Sepah Square, Karaj

Rahab Engineers Consulting Firm Co (2014c) Pre-study reports and main and final workshop for reforming Jomhuri square, Karaj

SAVE International (2017) The Power of Value Engineering, website: http://www.value-eng.org

Stasiak BR (2015) Value engineering application in the American transportation industry. Period Polytech Transport Eng 43(4):206–210

Swei O, Gregory J, Kirchain R (2017) Construction cost estimation: a parametric approach for better estimates of expected cost and variation. Transportation Research Part B 101:295–305

Tarhe Rah-e-Abrisham Engineers Consulting Firm Co (2014a) Pre-study reports and main and final workshop for reforming the intersection of 75 meter Razavi and Kane bist. Mashad, Iran

Tarhe Rah-e-Abrisham Engineers Consulting Firm Co (2014b) Pre-study reports and main and final workshop for reforming the intersection of Shahed and Gouchan road. Mashad, Iran

Wang W-C, Bilozerov T, Dzeng R-J, Hsiao F-Y, Wang K-C (2017) Conceptual cost estimations using neuro-fuzzy and multi-factor evaluation methods for building projects. J Civil Eng Manage 23(1):1–14

Zhong S, Elhegazy H, Elzarka H (2022) Key factors affecting the decision-making process for building projects in Egypt. Ain Shams Eng J 13(3):101597. https://doi.org/10.1016/j.asej.2021.09.024

Download references

Acknowledgements

Not applicable

No specific funding has to be declared for this work.

Author information

Authors and affiliations.

Construction Management, Department of Civil Engineering, Chalous Branch, Islamic Azad University, Chalous, Mazandaran Province, Iran

Mohsen Jafari Nigjeh

Department of Civil Engineering, Chalous Branch, Islamic Azad University, Chalous, Iran

You can also search for this author in PubMed   Google Scholar

Contributions

MJ carried out the research methodology, developed the computational technique and performed the investigation and validation of the analytical work, and wrote the manuscript draft. NA performed the conceptualization of the research idea, participated in the interpretation of the results, reviewed the edited manuscript, and supervised the whole project. Also, he contributed to the discussion of the results and visualization of the final manuscript. The author(s) read and approved the final manuscript.

Corresponding author

Correspondence to Nima Amani .

Ethics declarations

Ethics approval and consent to participate, consent for publication.

The consulted firms and/or beneficiaries approve that data pertaining to them will be published.

Competing interests

The authors declare that they have no competing interests.

Additional information

Publisher’s note.

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ . The Creative Commons Public Domain Dedication waiver ( http://creativecommons.org/publicdomain/zero/1.0/ ) applies to the data made available in this article, unless otherwise stated in a credit line to the data.

Reprints and permissions

About this article

Cite this article.

Nigjeh, M.J., Amani, N. Evaluation of influential value engineering factors on the function of interchanges: case studies in Iran. J. Eng. Appl. Sci. 69 , 48 (2022). https://doi.org/10.1186/s44147-022-00100-9

Download citation

Received : 17 February 2022

Accepted : 28 April 2022

Published : 02 June 2022

DOI : https://doi.org/10.1186/s44147-022-00100-9

Share this article

Anyone you share the following link with will be able to read this content:

Sorry, a shareable link is not currently available for this article.

Provided by the Springer Nature SharedIt content-sharing initiative

  • Interchanges
  • Cost reduction
  • Improving qualitative parameters

value engineering research papers

Component Cost Reduction by Value Engineering: A Case Study

  • Published: 29 June 2016
  • Volume 98 , pages 219–226, ( 2017 )

Cite this article

value engineering research papers

  • Vinayak Kalluri 1 &
  • Rambabu Kodali 2  

910 Accesses

Explore all metrics

The concept value engineering (VE) acts to increase the value of a product through the improvement in existent functions without increasing their costs. In other words, VE is a function oriented, systematic team approach study to provide value in a product, system or service. The authors systematically explore VE through the six step framework proposed by SAVE and a case study is presented to address the concern of reduction in cost without compromising the function of a hydraulic steering cylinder through the aforementioned VE framework.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price includes VAT (Russian Federation)

Instant access to the full article PDF.

Rent this article via DeepDyve

Institutional subscriptions

( source : SAVE, 2007)

Institute for Defense Analyses website. http://ve.ida.org/ve/ve.html

SAVE International (Society of American Value Engineers). Value Methodology Standard, USA (2007)

L.D. Miles, The Fundamentals of Value Engineering. in Proceedings of the SAVE convention , 1966

U. Ibusuki, P.C. Kaminski, Product development process with focus on value engineering and target-costing: a case study in an automotive company. Int. J. Prod. Econ. 105 , 459–474 (2007)

Article   Google Scholar  

S.W. Fong, Value engineering in Hong Kong—a powerful tool for a changing Society. Comput. Ind. Eng. 35 (34), 627–630 (1998)

H. Tohidi, Review the benefits of using Value Engineering in Information Technology Project Management. Procedia Comput. Sci. 3 , 917–924 (2011)

W.H. Fang, J.H. Rogerson, Value engineering for managing the design process. Int. J. Qual. Reliab. Manag. 16 (1), 42–55 (1999)

M.S. Vittal, Achieving Competitive Edge Through Value Engineering (System Consultancy services, Bangalore, 1997)

Google Scholar  

P. Bowen, K. Cattell, I. Jay, P. Edwards, Value management in the South African manufacturing industry: exploratory findings. Manag. Decis. 49 (1), 6–28 (2011)

S.E.G. Elias, Value engineering—a powerful productivity tool. Comput. Ind. Eng. 35 (3–4), 381–393 (1998)

Download references

Author information

Authors and affiliations.

BML Munjal Univerity, Gurgaon, 122413, Haryana, India

Vinayak Kalluri

National Institute of Technology Jamshedpur, Jamshedpur, 831014, Jharkhand, India

Rambabu Kodali

You can also search for this author in PubMed   Google Scholar

Corresponding author

Correspondence to Vinayak Kalluri .

Rights and permissions

Reprints and permissions

About this article

Kalluri, V., Kodali, R. Component Cost Reduction by Value Engineering: A Case Study. J. Inst. Eng. India Ser. C 98 , 219–226 (2017). https://doi.org/10.1007/s40032-016-0279-0

Download citation

Received : 15 September 2012

Accepted : 16 May 2016

Published : 29 June 2016

Issue Date : April 2017

DOI : https://doi.org/10.1007/s40032-016-0279-0

Share this article

Anyone you share the following link with will be able to read this content:

Sorry, a shareable link is not currently available for this article.

Provided by the Springer Nature SharedIt content-sharing initiative

  • Value engineering (VE)
  • Product design
  • Cost reduction
  • Find a journal
  • Publish with us
  • Track your research

value engineering Recently Published Documents

Total documents.

  • Latest Documents
  • Most Cited Documents
  • Contributed Authors
  • Related Sources
  • Related Keywords

Estimasi Model Hidrolika Menggunakan HEC-RAS 1-D dan Tren Prediksi Strategi Mitigasi Banjir

Engineering modeling is becoming a trend and important because it can simulate a variety of decision scenarios to be applied in the field. With limited facilities and technology, 1-D modeling in hydraulics for flood mitigation is still a trend today. What are the weaknesses of this model and how is the prediction of future modeling trends? This study analyzes the flood modeling of the Tuntang River with the 1-D model using HEC-RAS to analyze the condition of the existing water level profile and flood mitigation scenarios with normalization. The results of the analysis show that the 1-D model can describe conditions in the field and scenarios clearly. However, the 1-D model has limitations because it cannot carry out simulations that consider aspects of construction costs, time, and budget allocation of stakeholders to determine the priority scale of disaster-affected areas. It requires a vulnerability analysis with field observations, 2-D or 3-D modeling, and the application of value engineering to optimize flood control strategies. With the advancement of technology, this trend is predicted to be something that will be done in the future.

Value Engineering Optimal Design Approach of High-Performance Residential Buildings: Case Study of Kuwait

Industry applications for adopting value engineering in construction: a study from general contractors’ perspective, integrated framework for proper constructability in bridges using value engineering and analytical network process 'anp" (analytical study): إطار متكامل لتحسين إنشائية الكباري باستخدام الهندسة القيمية وعملية الشبكة التحليلية "anp" (دراسة تحليلية).

Due to recent environmental and Political requirements, and regulations of the construction industry, in which bridges is one of its important category, deciding its proper constructability is becoming vital. Therefor the objective of this research is to develop a decision model for selecting proper constructability of green bridges constructions, the model was built based on analytical network process (the ANP) soft were program, integrated with value engineering approach. For this analytical study different parameters are identified and ranked to be implemented for the decision model developed on the biases of four surveying studies conducted in this study the results of these surveying's was be analyzed by using the statically analytical program; "SPSS". Model validation and reliability is carried out using the analytical network process (ANP) for statistically analysis using case study which is a cable bridge project constructed in Egypt. ANP proves to be an effective framework for assessing readiness to adopt and facilitating TQM. The result of the study illustrate that the proper constructability alternative in green bridge concept for this determinate project is the concrete box girder type, upon this there is a cost loss of $3, 500 per square meter, equivalent to 50% losses, respect to the life cycle cost this is due to did not using the best alternate of the estimated project. upon the possibility of applying this decision model to such studies of infrastructure projects, and with respect to the results gained; it is recommend to apply the ANP model with respect to VE procedures to bridges projects of all kinds and their determinants, as well as all other construction projects, especially national ones, in future studies, which allows decision- makers to make decisions that aim at the highest quality without any waste in unnecessary costs.

Value-Engineering Methodology for the Selection of an Optimal Bridge System

Maintaining and enhancing the functionality of the infrastructure at an affordable cost are major challenges for decision makers, particularly given the need to cope with growing societal and transportation demands. This study introduces a systematic multi-criteria value engineering (VE) approach for the selection of a sustainable bridge system. A thorough VE analysis for a proposed long-span bridge in New Jersey, USA was carried out as a pilot study. The function analysis system technique was used to develop logical relationships between the project’s functions. A detailed 100-year life-cycle cost analysis (LCCA) was conducted. The study developed and evaluated eight alternative designs for deck and superstructure systems against set VE criteria comprising constructability, maintenance strategies, and environmental impact. A relative value index was used as an unbiased measure for the selection of the optimal structural system. With total savings of approximately 21% of the original design ($132.5 million), steel plate girders with a high-performance lightweight steel grid deck system have proven to “outvalue” the other alternatives, including the preferred preliminary alternative (PPA). Design engineers and decision makers can use this methodology as a systematic and convenient guide for the selection of economical and sustainable bridge systems. As such, it is necessary to re-evaluate the current practices and policies used for this purpose.

The Role of Value Engineering in Government Housing Projects in Developing Countries to Improve Value

Government housing projects are among the complex issues facing developing countries’ governments. There have been many attempts to solve problems related to this issue and a lot of effort has been made in this direction. The main problem is lowering the cost of lodging, without sacrificing its quality and the effectiveness by which it fulfills the needs of its occupants. This became possible upon the use of the value engineering technique. Value engineering is an effective tool used to solve problems related to housing, by lowering cost on one hand and sustaining or even ameliorating quality and performance.The purpose of this study is to try to identify a series of proposed solutions and value indicators and to describe their role in improving value in government housing projects. This process may assist the designer in choosing and managing, value indicators during the creative phase, using references from the literature and the analysis of case studies.The literature review identified the reasons for high costs and poor performance, which are often a result of a misunderstanding of the fundamental principles of design criteria and value indicators, followed in government housing projects. The review also pinpointed the most important considerations that improve value.Results obtained in this study feature the positive effects of methods under the umbrella of value engineering, applied in government housing projects. It was found that savings of 15% to 40% can be achieved in the total cost of a certain project, using this technique. Generating ideas in the creative phase is one of the most important stages in value engineering studies. A set of value indicators and proposed solutions in the form of a checklist were derived and can be used in the future, during the creative phase of value engineering studies in the initial design stage of government housing projects.

Integrating building information modeling with value engineering to facilitate the selection of building design alternatives considering sustainability

Design and cost multi-objective optimization of small-scale lng carriers using the value engineering approach, increasing value of façade at green hotel building based on value engineering.

Background: Of a total of 180 countries in the world, Indonesia is ranked 116th in the EPI ranking. This paper describes the innovative design of a high-rise hotel building that carries a green building concept. which utilizes the outer wall area of the hotel building as an object in this study. Objective: The main design of this project is the creation of an innovative high-rise hotel building with attention to architectural, structural, and lighting system aspects as well as energy efficiency from direct sunlight, which will be processed into a source of electrical energy. Materials and Methods: Application of analysis through value engineering case studies and application of green building methods, with qualitative methods. This paper focuses on factors related to energy sources and environmental sustainability and calculates life cycle costs concerning case study designs. The goal is to reduce the use of electrical energy sources from PLN which have an impact on nature preservation, by carrying out the concept of environmentally friendly buildings, by utilizing the facade wall area with the application of Photovoltaic. Results: The results obtained a percentage of ≤ 6.21%, with the use of Photovoltaic material as much as 100%. Conclusion: The facades (east and west) generate ± 1,050 KVA of electricity from the Solar Power Plant and reduce the use of electricity from PLN by 991 KVA, out of a total of 2,041 KVA. It can be concluded that the decrease obtained is 47.32%.

Value Engineering for the Selection of the Filler Material between Shoring Wall and the Structure

Export citation format, share document.

value engineering research papers

Academia.edu no longer supports Internet Explorer.

To browse Academia.edu and the wider internet faster and more securely, please take a few seconds to  upgrade your browser .

  •  We're Hiring!
  •  Help Center

Value Engineering

  • Most Cited Papers
  • Most Downloaded Papers
  • Newest Papers
  • Save to Library
  • Last »
  • Value Management Follow Following
  • Grounded Theory (Research Methodology) Follow Following
  • Management of Civil Engineering Projects Follow Following
  • Construction scheduling Follow Following
  • Integer Programming Follow Following
  • Integrated Project Delivery System (Architecture) Follow Following
  • Mixed Methods Follow Following
  • Lean Project Delivery Follow Following
  • Target costing Follow Following
  • Risk and Value Management in Construction Follow Following

Enter the email address you signed up with and we'll email you a reset link.

  • Academia.edu Publishing
  •   We're Hiring!
  •   Help Center
  • Find new research papers in:
  • Health Sciences
  • Earth Sciences
  • Cognitive Science
  • Mathematics
  • Computer Science
  • Academia ©2024

Value Engineering

Ieee account.

  • Change Username/Password
  • Update Address

Purchase Details

  • Payment Options
  • Order History
  • View Purchased Documents

Profile Information

  • Communications Preferences
  • Profession and Education
  • Technical Interests
  • US & Canada: +1 800 678 4333
  • Worldwide: +1 732 981 0060
  • Contact & Support
  • About IEEE Xplore
  • Accessibility
  • Terms of Use
  • Nondiscrimination Policy
  • Privacy & Opting Out of Cookies

A not-for-profit organization, IEEE is the world's largest technical professional organization dedicated to advancing technology for the benefit of humanity. © Copyright 2024 IEEE - All rights reserved. Use of this web site signifies your agreement to the terms and conditions.

IMAGES

  1. (PDF) A CASE STUDY ANALYSIS THROUGH THE IMPLEMENTATION OF VALUE ENGINEERING

    value engineering research papers

  2. (PDF) Published Research on Engineering Work

    value engineering research papers

  3. IJSER Publishing

    value engineering research papers

  4. Value Engineering and Value Analysis

    value engineering research papers

  5. Chapter 2

    value engineering research papers

  6. (PDF) Systematic Review of Value Engineering Research Studies In Indonesia

    value engineering research papers

VIDEO

  1. Value Engineering Rules for Good Brainstorming by P.Arjunraj

  2. Value Engineering

  3. Value Analysis Technique

  4. Responsibility of engineering l IES 2021 Ethics and values in Engineering profession #Responsibilty

  5. Value engineering 2

  6. Value Methodology Fundamentals 1 : Prerequisite for intl Certificate VMA Value Methodology Associate

COMMENTS

  1. 4569 PDFs

    Explore the latest full-text research PDFs, articles, conference papers, preprints and more on VALUE ENGINEERING. Find methods information, sources, references or conduct a literature review on ...

  2. (PDF) Value Engineering Techniques and its Application ...

    Value analysis is the main component of Value Engineering Research. Sequentially both stages and measures work. ... This paper uses Value Engineering (VE) methodology to find solutions of this ...

  3. A Decade of Value Engineering in Construction Projects

    Over the past half-century, value engineering (VE) has emerged as an effective tool to manage time, costs, and quality with an aim to maximize value. It has been shown to be a highly effective approach for evaluating current construction projects. However, this tool's application in the construction domain is quite variable. This research aims to provide an in-depth quantitative and ...

  4. Value Engineering Factors with an Impact on Design Management

    This research contributes to the body of knowledge by examining value engineering elements that might affect design management performance to keep the project team focused on those issues to achieve successful design management performance. ... After a detailed analysis of the literature and consultation with value engineering experts and ...

  5. Value engineering application in a high rise building (a case study in

    The research found that by applying value engineering through several items of work in a commercial high rise building it could save up to up to 8% of the total cost of the architecture work. The architecture work that was analysed through value engineering were the wall work, the door work, the floor work and the sanitary work.

  6. State-of-the-art review on benefits of applying value engineering for

    The concept of value engineering has evolved significantly and has been expanded over the years; today, numerous standards and related manuals exist. Various engineering databases, international journals, and conference proceedings were searched. International journals were searched for relevant research papers. This paper provides perspectives ...

  7. PDF An Introduction to Value Engineering

    of value engineering (VE) which has proved to be an effec-tive cost reduction and value improvement tool. Certain important aspects of value engineering were selected for re-view. The paper includes a brief history, a discussion of value engineering methodology, and some of the character-istics of value engineering. Two sections of the paper de-

  8. Value Engineering as a Specialty for Systems Engineering: Exploring

    Search for more papers by this author. Hein de Jong, Hein de Jong [email protected] ... His teaching, research, and project activities focus on the design management of construction projects in general, and on systems engineering and value management in particular. ... Value Engineering is a so-called specialty engineering activity within ...

  9. Evaluation of influential value engineering factors on the function of

    In Iran, recently in large-scale projects, the science of value engineering has become very important and in order to show the significant impact of value engineering results in increasing efficiency and reducing the cost of projects, the reason for choosing this research. The experience of value engineering in the developed countries shows the significant effect of this method in the value ...

  10. (PDF) VALUE ENGINEERING, VALUE ANALYSIS AND VALUE ...

    The objective of this paper is to assess the value engineering, value analysis and value management of vertical Slip Forming (SF) technology using value engineering by investigating its ...

  11. Component Cost Reduction by Value Engineering: A Case Study

    The concept value engineering (VE) acts to increase the value of a product through the improvement in existent functions without increasing their costs. In other words, VE is a function oriented, systematic team approach study to provide value in a product, system or service. The authors systematically explore VE through the six step framework proposed by SAVE and a case study is presented to ...

  12. PDF State of Art in Value Engineering: A bibliometric based review for

    The considered papers to summarize the research growth in value engineering have been published from year 2001 to 2020. Our analysis of this papers ... The purpose of this study is to understand the state of 'value engineering' research by examining published literature to provide intuition for 'value engineering' practitioners and ...

  13. value engineering Latest Research Papers

    Find the latest published documents for value engineering, Related hot topics, top authors, the most cited documents, and related journals ... Therefor the objective of this research is to develop a decision model for selecting proper constructability of green bridges constructions, the model was built based on analytical network process (the ...

  14. State of Art in Value Engineering: A bibliometric based review for

    In this review numbers of value engineering published articles are extracted and investigated from top journals, productive articles and citied conferences papers. The considered papers to summarize the research growth in value engineering have been published from year 2001 to 2020.

  15. Application of Value Engineering for Sustainable Construction: A ...

    Value Engineering (VE) is a function based approach to effectively attain sustainability and cost-effectiveness in construction processes. The present paper briefs the concept of value engineering; its potential, parametric assessment methodology and the applications. VE has been proven an effective tool for management and innovation.

  16. An Overview of Value Engineering in Product Development and Design

    Value Engineering follows a struct ured, step b y step process, called a 'Job Plan'. The original Job Plan was. developed by La wrence D. Miles while working for Genera l Electric consisted of ...

  17. Value Engineering Research Papers

    This paper reviews Value Engineering and Sustainable Construction for achieving best value along with long term sustainability over whole life cycle of project, it also proposes a conceptual synergy between VE and Sustainable Construction that leads to achieving best value over the life span of a project and demonstrates how sustainability ...

  18. PDF Achieving Success through Value Engineering: A Case Study

    Abstract— In this paper we have discussed the concept of Value Engineering, its job plan and the effective implementation of it through a case study. Efforts have been put into the articulation of the paper to make it coherent which can be easily perceivable. A case study has been discussed in this paper involving a part used in the medical ...

  19. Value Engineering

    Abstract: This paper defines value engineering, shows why it is necessary, and emphasizes the engineer's responsibility for using engineering disciplines in the design of a product. Recognizing that value engineering is a duty of the professional engineer, the paper stresses application of value engineering to attain Armed Services goals, and reduce costs while speeding up delivery of the ...

  20. A Critical Literature Review on Application of Value Engineering in

    In this paper value engineering technique, is applied on a model of primary school. The paper suggested that GAEB should construct a value engineering department included in its organization ...

  21. Forward-Looking State-of-the-Art Review on Earned Value Management

    Recent academic research emerged around automating EVM where few papers have focused on the management of earned value in construction projects by using BIM (Elghaish et al. 2019; Alzraiee 2018). Such endeavors allow for more collaboration between the project stakeholders, for effective and reliable decision-making, and promoting a successful ...

  22. PDF Organising Value Analysis Value Engineering (Vave) During New Product

    the aesthetic value, comfortability and manufacturability compare to the current design. vi. Result The benefits after the implementation of VAVE are as follows: Table-5. Cost benefits. Cost of part before VAVE RM 8.00 Cost of part after VAVE RM 6.50 Savings per part RM 1.50 Value improvement 23.08% Expected annual savings RM 81,000.00

  23. Value Engineering and Its Applications in Civil Engineering

    4 Undergraduate Student, Department of Civil Engineering, University of Texas Rio Grande. Valley, 1201 W University Dr, Edinburg, TX 78539; PH (956) 665-3038; email: grecia.silvasanchez01@utrgv ...